1 Intro Plumbing
-
Upload
nailatur-rofiah -
Category
Documents
-
view
216 -
download
0
Transcript of 1 Intro Plumbing
-
8/2/2019 1 Intro Plumbing
1/6
16/02
PLUMBING
e come u en s
1
Lecture Note 1
RE 091307
Plumbing Department of Environmental
Engineering ITS
2010/2011
Plumbingclass Apa itu plambing?
Apayangdipelajari dikuliah ini?
Tugas besar perencanaan
sistem plambing?
2Plumbing
Department of Environmental Engineering ITS2010/2011
Sistem plambing
Sistemplambingmencakup airminum,airbuangan,vendanairhujanpada gedungsampaidenganpipapersil(SNI0370652005)
Sistemplambingadalahsistemperpipaandalamsuatuangunan,sepert per antoran,perto oan, ote ,
apartemen/rumahsusun,pabrik,kapal,dansebagainya
Sistemperpipaantersebutberfungsiuntukmengalirkanairbersih,airpanas,airkotor (grey
water/blackwater),
air
hujan,
gas,
dan
sebagainya.
2010/2011Plumbing
Department of Environmental Engineering ITS 3
Rancangan Pembelajaran
Tujuan Pembelajaran Mahasiswa mampu merencanakan sistem plambing
dan peralatan instalasi yangdiperlukan besertaoperasi dan pemeliharaannya.
2010/2011Plumbing
Department of Environmental Engineering ITS 4
Rancangan Pembelajaran
KOMPETENSI1. Mampu menjelaskan fungsi sistem plambing
serta komponennya
2. Mampu memahami konsep-konsep sistem
plambing dalam kaitannya untuk penyediaanair bersih dan penyaluran air buangan padasuatu bangunan
3. Mampu menguasai teknik-teknik perencanaanplambing, mulai dari penentuan alat,pemasangan alat, sistem penyalurannya,perlengkapan instalasinya, mekanismekerjanya hingga sistem pemeliharaannya.
2010/2011Plumbing
Department of Environmental Engineering ITS 5
Rancangan Pembelajaran
Materi Pokok1. Pengantar sistem plambing dan komponennya (jenis
pipa,sambungan,asesoris pipa lainnya),
2. Perencanaan tata letak ruang saniter,
3. Perhitungan kuantitas airbersih,
perencanaan
isometri sistem plambing,penentuan dimensi pipadengan metode kerugian gesek dan metode bebanekivalen,
4. Perhitungan dimensi groundreservoirdan rooftank,
5. Perencanaan jenis dan karakteristik pompa,perencanaan sistem pompa dan memilih jenis pompa,
2010/2011Plumbing
Department of Environmental Engineering ITS 6
-
8/2/2019 1 Intro Plumbing
2/6
16/02
Rancangan Pembelajaran
Materi Pokok (2)6. Penentuan dimensi pipa airbuangan,
7. Penentuan dimensi pipa vent,dan
8. Perencanaan sistem pemadam kebakaran.
9. Materi tambahan:Perencanaan unit
pengolahan air
buan an (Se ticTank)*,
2010/2011Plumbing
Department of Environmental Engineering ITS 7
Rancangan Pembelajaran
2010/2011Plumbing
Department of Environmental Engineering ITS 8
Bahan Bacaan
Noerbambang,S.M.dan Morimura,T.,Perancangandan Pemeliharaan Sistem Plambing,Pradnya Paramita,Jakarta,1993
Wentz,T.(1997)PlumbingSystems:Analysis,Design,andConstruction.PrenticeHallInc.NewJersey
0370 52005tentang ata ara erencanaanSistem Plambing
SNI033989 2000Tatacaraperencanaandanpemasangansistemspringklerotomatikuntukpencegahanbahayakebakaranpadabangunangedung
SNI031735 2000,SNI0317452000, SNI0365702001
9Plumbing
Department of Environmental Engineering ITS2010/2011
Evaluasi
Tugas perencanaan sistem plambing 2535%
Ujian 2535%
Quiz(min.2kali) 1520%
Tugas kecil 1520%
2010/2011Plumbing
Department of Environmental Engineering ITS 10
2010/2011
PlumbingDepartment of Environmental Engineering ITS 11
Tugas Perencanaan Plambing
AirBersih AirBuangan
Hydrantkebakaran
Kebutuhan airSistem perpipaan airbersihPerlen ka an saniter airbersih
Kebutuhan air
Sistem perpipaan air
buanganSistem pipaventSistem pengolahan airbuangan
2010/2011Plumbing
Department of Environmental Engineering ITS 12
s em perp paan y rankebakaranPerlengkapan hydrantkebakaran
buangan
Reservoirdan Pompa
-
8/2/2019 1 Intro Plumbing
3/6
16/02
Sistem Plambing
AirBersih
Sistem Sambungan Langsung
Sistem Tangki Atap
Sistem Tangki Tekan
Sistem TanpaTangki (BoosterSystem)
r uangan
Sistem tercampur
Sistem terpisah
2010/2011Plumbing
Department of Environmental Engineering ITS 13
Sistem Sambungan Langsung
2010/2011Plumbing
Department of Environmental Engineering ITS 14
Sistem Tangki Atap
2010/2011Plumbing
Department of Environmental Engineering ITS 15
Sistem tangki tekan
2010/2011Plumbing
Department of Environmental Engineering ITS 16
Sistem Vent
Menjaga sekat perangkap dari efek siphonatautekanan balik
Menjaga aliran pipa buangan selalu lancar
Mensirkulasikan udaradalam pipa air
buangan
2010/2011Plumbing
Department of Environmental Engineering ITS 17 2010/2011
PlumbingDepartment of Environmental Engineering ITS 18
-
8/2/2019 1 Intro Plumbing
4/6
16/02
Watercloset(WC)
2010/2011 Plumbing Department of Environmental Engineering ITS 19
Lavatory(LV)
2010/2011Plumbing
Department of Environmental Engineering ITS 20
Urinoir (UR)
2010/2011Plumbing
Department of Environmental Engineering ITS 21
Bidet
2010/2011Plumbing
Department of Environmental Engineering ITS 22
Floordrain(FD)
2010/2011Plumbing
Department of Environmental Engineering ITS 23
Pipa
Berdasarkan jenis bahan material Polyvinylchloride(PVC) Polyethilene (PE/HDPE/LDPE) Castironpipe/baja karbon (CIP) Gavanized iron
pipe
(GI
pipe)
Pipa logam nonbesi (tembaga,aluminium,timbal) Pipa beton
2010/2011Plumbing
Department of Environmental Engineering ITS 24
-
8/2/2019 1 Intro Plumbing
5/6
16/02
2010/2011Plumbing
Department of Environmental Engineering ITS 25 2010/2011Plumbing
Department of Environmental Engineering ITS 26
2010/2011Plumbing
Department of Environmental Engineering ITS 27
Sambungan Pipa
Jenis sambungan Spigotsocket Rubberjoint Flange Welding(HDPE)
2010/2011Plumbing
Department of Environmental Engineering ITS 28
Asesoris pipa
Valve
Knee/bend/elbow
Tee
Reducer/increaser Giboult Joint
Socket,dansebagainya
2010/2011Plumbing
Department of Environmental Engineering ITS 29
Tugas
Cari gambar alatalat plambing dan jelaskan fungsinyasecara singkat (sebanyakbanyaknya)
Tugas kelompok 2orang
Dikumpulkan dalam bentuk softcopy
Subjectemail:[Plambing]3309100001dan 3309100002
Palinglambat 28Februari 2011Pukul 22.00WIB
2010/2011Plumbing
Department of Environmental Engineering ITS 30
-
8/2/2019 1 Intro Plumbing
6/6
16/02
Lets Have a Great Sem!
31Plumbing Department of Environmental
Engineering ITS
2010/2011