1. Field Inspection Report Example

download 1. Field Inspection Report Example

of 35

description

inspection

Transcript of 1. Field Inspection Report Example

  • 10:10 AM 11/9/12

    Completed on

    DC International, In.

    DC International, Inc.

    Drilling Rig HSE Manager

    Drilling Rig Superintendent

    Drilling Rig.Toolpusher

    Client Name

    Drilling Rig Company Man

    Personnel

    701 Robley Dr

    Lafayette, LA 70503

    United States

    Location

    DC International, Inc.

    Prepared by

    8:00 AM 11/7/12

    Conducted on

    Inspection report

    DC International Rig Inspection Form

    DCInt000018DLR

    Document No.

    Drilling Land Inspection Formconducted for

    Customer Name

  • In order to maintain the integrity and credibility of the inspection assessment processes

    and to protect the parties involved, it is understood that the assessors will not divulge to

    unauthorized persons any information obtained during this risk assessment unless

    legally obligated to do so.

    Confidentiality Statement

    The assessors believe the information contained within this inspection report to be

    correct at the time of printing. The assessors do not accept responsibility for any

    consequences arising from the use of the information herein. The report is based on

    matters which were observed or came to the attention of the assessors during the day

    of the assessment and should not be relied upon as an exhaustive record of all possible

    risks or hazards that may exist or potential improvements that can be made.

    Information on the latest workers compensation and OHS / WHS laws can be found at

    the relevant State WorkCover / WorkSafe Authority.

    Disclaimer

    DCInt000018DLRInspection report - 2 -

  • Table of Contents

    DRILLING LAND INSPECTION FORM 1

    Disclaimer 2

    Confidentiality Statement 2

    RIG INSPECTION CHECKLIST 4

    DRILLING / LOCATION 4

    TRAINING, PPE & GENERAL SAFETY 5

    MUD PUMP AREA 8

    MUD MIXING AREA 9

    MUD TANKS & PITS 10

    MATERIAL HANDLING EQUIPMENT 11

    ELECTRICAL SPECIFIC INSPECTION 12

    GENERATOR AREA 12

    FIRE PROTECTION 14

    FUEL & OTHER FLAMMABLE LIQUID STORAGE TANKS 15

    PIPE RACK AREA 16

    BLOW-OUT PREVENTERS 17

    All additional questions (1-51) in Section 9 will be used at the

    discretion of the DCI customer and their individual needs.

    18

    DERRICK & SUBSTRUCTURE 22

    DRILL FLOOR AREA 23

    Top Drive 26

    Iron Roughneck 27

    HOISTING TOOLS, HOOKS, BAILS, ELEVATORS 27

    HOTWORK AND CONFINED SPACES 28

    ENVIRONMENTAL 29

    STAIRS, LADDERS, HANDRAILS & GUARDRAILS 29

    ADDITIONAL FINDINGS 30

    MEDIA 31

    DCInt000018DLRInspection report - 3 -

  • Rig Inspection Checklist

    Question Response Details

    DRILLING / LOCATION

    Authorized Personnel Sign posted at

    entrance to site identifying requirements for

    hard hat, safety glasses, safety toe

    footwear.

    non-

    compliant

    No signs at entrance.

    No Smoking Area?s Designated & Posted.non-

    compliantNeed signs for designated areas.

    No Parking within 100 ft of the rig.compliant

    No one parked within 100 feet with the

    exception of the BOP testing equipment.

    Are H2S controls in place where applicable

    including; warning signs, H2S monitors,

    SCBA(s) or escape air, wind socks and H2S

    certification training?

    N/A

    Escape & Guy wires flagged with visible

    material.

    non-

    compliant

    No flagging and no tie wire on shackle. Min

    3 clamps with 3 inch spacing

    Appendix 1 Appendix 2 Appendix 3

    Capacity of guywire anchors verified ? Base

    Beam Anchor ? Screw-type Anchor ?

    Permanent (Cement) Anchor ?

    Other____________ Verification

    Method:____________________________

    No

    No verification or certification tag found.

    Outhouse/restroom facility provided. compliant

    Hard hats & Safety glasses available for

    visitors at Tool Pusher/Drilling Foreman's

    office?

    Yes

    All temporary housing/offices must be

    securely positioned and properly grounded.compliant

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 4 -

  • Question Response Details

    Housekeeping, Is the area clean and free of

    debris and tripping hazards?Yes

    Distance from overhead power lines GT 10

    ft.N/A

    Muster area designated and posted?non-

    compliantRequired signs are not available for area.

    Sign posted directing visitors to report to

    the Drilling Foreman / Toolpusher upon

    entry, visitors signed in and out?

    non-

    compliant

    No signs posted for sign in & out.

    TRAINING, PPE & GENERAL SAFETY Score (32/38) 84.2%

    First Aid Training provided, minimum of 2

    certified per location.compliant

    H2S Training provided, if applicable compliant

    Face shield provided for removing tong

    dies with proper toolYes

    Any prior incidents, near miss,

    observations, etc. if any, are discussed

    during safety meeting

    Yes

    No smoking rules observed compliant

    Emergency Phone numbers postednon-

    compliant

    Not in Dog House. Need to place in dog

    house area. Place inside board area on

    picture.

    Appendix 4

    Do Employees know were designated

    smoking areas are located?Yes

    Do employees know were SPCC plan is

    located?Yes

    Tool pusher house

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 5 -

  • Question Response Details

    Are full body harness and lanyard

    inspections being conducted monthly and

    documented?

    non-

    compliant

    Monthly inspection must be done on

    lanyard and harness. Systems are in good

    visual shape, no paperwork for monthly

    inspections kept.

    SRL's being inspected monthly and copies

    being obtained at location?Yes

    Rig inspections being performedYes

    HSE inspection being done by HSE

    department and kept at office.

    Pre-spud, periodic, HSE, etc.? Yes

    All employees familiar with LOTO

    procedures and policies?Yes

    Safe work permits being used and proper

    employees understand how to complete

    this form?

    No

    Needs to be performed. No forms being

    done.

    Atmospheric tester available? Yes

    Near Miss program being utilized on this

    location?Yes

    Does rig crew know where to dispose of

    hazardous waste and are all containers

    labeled? (used oil, diapers, etc)Yes

    DOT drums are not marked and one drum

    needs to be emptied and properly disposed

    of by rig company. Personnel are disposing

    of product properly in drums.

    Appendix 5 Appendix 6

    Does the rig crew know how to perform a

    BOP Drill? No

    Need to have record on location. Need to

    have (at the minimum) an online copy that

    can be pulled during inspections.

    Are the rig crew training records on site and

    current?Yes

    Are fuel transfer sheets being performed? Yes

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 6 -

  • Question Response Details

    Is the escape buggy getting inspected

    monthly? No

    When rigged up. Documented needs to be

    done monthly. Currently rigged up with

    improper clamping.

    Is the Confined Space Entry equipment in

    good working order?N/A

    Is the Gas Detector in working order

    (charged) and calibrated?Yes

    How is the general safety culture on this

    location? Yes

    Safety meetings conducted and properly

    documented: pre-tour, pre-job/JSAs,

    weekly?

    Yes

    Accidents, if any, are discussed during

    safety meetings.Yes

    Proper clothing worn by crew; no loose

    clothing or jewelry, hard hat, glasses, safety

    shoes, gloves, fall protection other PPE as

    necessary?

    Yes

    Are designated "Smoking Areas"

    established? Are smoking rules observed? No

    Needs to be established "Smoking Area"

    with signs and insure all are following

    designated area.

    Injuries reported and documented

    immediately.Yes

    First Aid Kit/Bloodborne Pathogen Kit

    available on site. Yes

    At pusher house. Tool pusher knows the

    incidents when first aid kept in his office.

    One on rig floor also.

    Are all containers properly labeled per

    HAZCOM?compliant

    Are MSDS available and accessible at all

    times? compliant

    MSDS sheet need to be in shaker area if

    doors are available. No doors on shaker

    system. Compliant results good.

    Does contractor have a Hazard Recognition

    Program in use?Yes

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 7 -

  • Question Response Details

    BOP training provided for Pushers and

    Drillers? Is BOP training documented at the

    rig?

    Yes

    Written Contractor Safety Program in

    place?Yes

    Hearing protection required and provided. compliant

    Does the Operator / Drilling Contractor

    have a New Hire Training Program in place?

    Explain-Type?

    Yes

    Yellow for new employee. Green, grey,

    black, and white for other employee. See

    Justiss SOP.

    Are all injuries and illnesses reported

    immediately to a supervisor? Are written

    reports prepared as soon as practical and

    is every incident involving an injury being

    investigated and are steps being taken to

    prevent recurrence?

    Yes

    Is there an Emergency Response Plan

    available? Has personnel been trained on

    the plan?

    Yes

    MUD PUMP AREA Score (6/7) 85.7%

    Is all rotating equipment properly guarded;

    drive belts, shafts, pony rods, etc.?

    non-

    compliant

    Need to use guards on hole open area.

    Reposition meters if possible.

    Appendix 7

    Head and valve covers fully bolted. compliant

    Shear pin pop-off valve present and

    covered.compliant

    Ends of relief lines secured with adequate

    safety cable.compliant

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 8 -

  • Question Response Details

    Ends of mud vibrator hose snubbed with

    adequate safety cable.compliant

    Housekeeping - Is area clean and free of

    debris and tripping hazards?Yes

    Adequate lighting provided. compliant

    MUD MIXING AREA Score (10/10) 100.0%

    Bagged material properly stacked and

    protected from the weather?compliant

    Gloves, Aprons, Boots, or other PPE, as

    appropriate, available and in good

    condition?

    compliant

    Employees using all required PPE? N/A

    Appendix 8

    All chemicals are properly labeled including

    ?PPE Required? warning signs (Grouped or

    individual signs).

    compliant

    Personal protective equipment properly

    maintained and in a clean & sanitary

    condition.

    compliant

    Eye wash station and emergency shower;

    unobstructed and in close proximity,

    properly designed in good working order

    and plumed with a clean water supply?

    compliant

    Adequate ventilation in mud mixing area? compliant

    Elevated loading door opening protected? compliant

    Adequate lighting provided? compliant

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 9 -

  • Question Response Details

    Housekeeping - Is area clean and free of

    debris and tripping hazards?compliant

    Is the personnel required to mix or handle

    mud chemicals being properly trained

    regarding safe handling and use. Are they

    aware of the potential hazards and PPE

    measures required. Are MSDS's available

    to personnel prior to and during chemical

    mixing.

    Yes

    MUD TANKS & PITS Score (16/18) 88.9%

    Adequate stairs with handrails properly

    secured?compliant

    Adequate walkways and guardrails. compliant

    Guardrails installed on all raised platforms,

    walkways, etc above 48??compliant

    Walkways free from obstruction and/or

    damage?compliant

    Guardrails provided on crossovers? compliant

    ?PPE Required? warning signs erected

    (grouped or individual signs).

    non-

    compliant

    Need to be signs on PPE

    Appendix 9

    Chemical hazard warning signs erected?non-

    compliantNeeds signs on chemical hazards

    Shale shakers, agitator shafts, and all other

    rotating equipment properly guarded?compliant

    Explosion proof equipment, fixtures and

    wiring used. Class 1 Div 1/2. Data plates

    on equipment legible?

    compliant

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 10 -

  • Question Response Details

    Adequate lighting provided? compliant

    Employees using all required PPE? N/A

    Jetting hoses properly secured if applicable compliant

    Personal protective equipment properly

    stored?compliant

    Housekeeping - Is the area clean and free

    of debris and tripping hazards?compliant

    All unused floor holes covered? compliant

    Electric wiring in good condition? compliant

    Drive belts and shafts guarded? compliant

    Permitted and non permitted signage is in

    appropriate area'sYes

    MATERIAL HANDLING EQUIPMENT Score (12/14) 85.7%

    Material Handling Equipment (fork lift)

    operators trained and certified?compliant

    Personnel basket securely attached to

    forks? (If applicable).N/A

    Personnel wearing proper fall protection

    while in basket?compliant

    Backup alarm operational? non-

    compliant

    No backup alarm on forklift not working.

    Need fixed.

    Appendix 10

    Fork Lift equipped with seat belts? compliant

    Seat belts in use by operators? compliant

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 11 -

  • Question Response Details

    Fork Lift inspected prior to use? (daily).compliant

    Every tower, insure all paperwork available

    for inspections.

    ELECTRICAL SPECIFIC INSPECTION

    Are the breakers in the electrical panel

    property labeled?Yes

    Are the electrical panels accessible? (No

    boxes, etc. stacked in front of them?)Yes

    Are the electrical lines in good condition?

    (No splices, cuts, black tape: look for things

    OSHA would look for)

    Yes

    Are the electrical lines in good condition?

    (wire no pulled away from the connector,

    strain relief in place, etc.)

    Yes

    All power strips in the work area

    (Doghouse, SCR house, etc.) GFIC

    protected?No

    Vendor power strips need to be

    reviewed.Two separate power strips

    pointed out to Customer. Surge protector

    strips only, not GFIC strips.

    Do all lights have covers and are secure? Yes

    Is the equipment on location properly

    grounded /bonded? (Have RM show you

    how grounding and bonding is tied into all

    mobile equipment.

    Yes

    GENERATOR AREA Score (18/21) 85.7%

    Moving parts guarded? compliant

    Generators properly grounded? non-

    compliant

    Ground clamp incorrect, hose clamp shown

    below

    Appendix 11

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 12 -

  • Question Response Details

    Cover panels on electrical control boxes

    installed and closed?compliant

    All electrical controls marked as to their

    function and legible?compliant

    ?HIGH VOLTAGE? warning signs erected? compliant

    Insulating mats available at electrical

    panels?

    non-

    compliant

    Not installed

    Condition of electrical wiring, no splices or

    visible damage?compliant

    Rig wiring properly installed to prevent

    abrasion, vehicular and foot traffic, burns,

    cuts and damage from other sources?

    compliant

    Unused electrical outlets covered? compliant One in electrical room not covered

    Appendix 12

    Air compressors properly guarded? compliant

    Air storage tanks equipped with pop-off

    valve?compliant

    Lockout/Tagout program utilized?

    Adequate Lockout/Tagout devices

    available?

    compliant

    ?Hearing Protection Required? warning

    signs erected?compliant

    Hearing protection available? non-

    compliant

    Needs to have box of plugs available. No

    plugs available in high noise area.

    Adequate lighting installed? compliant

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 13 -

  • Question Response Details

    Housekeeping - Is area clean and free of

    debris and tripping hazards?compliant

    Wires are note running along the ground compliant

    All light fixtures properly guarded from

    damage?compliant

    Receptacles and plugs in good condition? compliant

    Water hose used for washing area kept

    away from generator skid/SCR/VFD

    House?

    compliant

    Generator skid door props properly

    pinned?compliant

    FIRE PROTECTION Score (5/6) 83.3%

    A minimum of 4 No. 20 fire extinguishers

    with a Class BC rating available at the drill

    site. This a minimum requirement and

    operations may dictate use of more or

    larger sized equipment.

    compliant

    Fire extinguishers fully charged, current

    inspection, proper gauges, properly located

    at their assigned locations?

    non-

    compliant

    Tags missing inspection tags. Accumulator

    system for BOP system. One located in

    incorrect area as opposed to sign pointing

    to fire Extinguisher.

    Appendix 13

    Are crew members familiarized with the

    location of fire control equipment and

    trained in the use of such equipment?

    Yes

    Portable containers for storing flammable

    liquids should be UL or FM approved or

    equivalent.

    compliant

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 14 -

  • Question Response Details

    Any area that has flammable containers

    stored should be posted with a sign, "NO

    SMOKING OR OPEN FLAME", or

    equivalent.

    compliant

    Spark arrestors or equivalent equipment

    shall be provided on all internal combustion

    engine exhausts located within 100' of the

    wellbore.

    N/A

    Not within 100 ft of well area

    FUEL & OTHER FLAMMABLE LIQUID STORAGE TANKS Score (16/16) 100.0%

    Fuel storage tanks properly located compliant

    All storage valve connections identified as

    to their functioncompliant

    Discharge nozzles, hoses, valves in good

    conditioncompliant

    Piping and fuel lines in good condition compliant

    Stationary ladders on storage tanks in good

    conditioncompliant

    Adequate lighting provided compliant

    "Flammable" warning signs erected on all

    sidescompliant

    "No Smoking" signs erected on all sides compliant

    B/C Class fire extinguisher available and

    identifiedcompliant

    Fuel tanks properly labeled, "NFPA Haz-

    Com", "Off Road Usage", "Flammable",

    "No Smoking"

    compliant

    Flammable warning signs erected on all

    sidescompliant

    "No Smoking" signs erected on all sides compliant

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 15 -

  • Question Response Details

    Vapor release vents elevated & away from

    ignition sourcescompliant

    B/C Class fire extinguisher available and

    identifiedcompliant

    Housekeeping - Is area clean and free of

    debris and tripping hazardscompliant

    All open valves/piping capped, bull

    plugged, etc.compliant

    PIPE RACK AREA Score (9/9) 100.0%

    Ends of pipe racks and separate layers of

    pipe properly chocked?N/A

    Pipe in use at this time

    Spacers used to separate layers of pipe N/A

    Pipe racks are level and stable N/A

    Pipe rack catwalk in good condition and at

    the same height?N/A

    V-door slide in good condition including

    stops on V-door or catwalk?N/A

    Derrick stand and ladder in good condition N/A

    Adequate lighting provided N/A

    Housekeeping - Is area clean and free of

    debris and tripping hazardsN/A

    Drilling line from spool elevated off groundcompliant

    Need to put guard on skid system. Was

    previously installed but removed.

    Appendix 14

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 16 -

  • Question Response Details

    Safety Warnings in place for Hydraulic Pipe

    Rack and verification of HPR inspection?N/A

    Standard system with warnings available

    BLOW-OUT PREVENTERS Score (66/67) 98.5%

    BOP properly installed, 3rd party tested,

    and properly documented?compliant

    All lines, valves, check valves and flow

    fittings should have a working pressure at

    least equal to the rated pressure of the ram

    BOP's in use. This equipment will be

    tested during the initial test of the BOP

    rams.

    compliant

    Wheels and stems in place, if automatic

    device is not available?compliant

    BOP stack properly stabilized? compliant

    All hydraulic lines connected ? compliant

    All unused hydraulic lines capped and

    secured?N/A

    Accumulator bottles labeled with contents,

    and other appropriate warning signs?compliant

    Accumulator valves in appropriate position,

    open or closed (never neutral), properly

    identified both purpose and position?

    compliant

    Gauges suitable for operating pressure and

    drilling fluid service should be installed so

    that drill pipe and annulus pressures may

    be accurately monitored and readily

    observed at the station where well control

    operations are to be conducted.

    compliant

    Choke manifold and line secured and

    accessible?compliant

    Blooey line with pilot installed if applicable? compliant

    Adequate lighting provided? compliant

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 17 -

  • Question Response Details

    Warning signs erected (Flammable, Hard

    Hat, H2S, Eye Protection, Confined Space,

    Authorized Personnel)

    non-

    compliant

    Signs needs to be displayed . Fire

    extinguisher not with proper tag. Black tape

    on electrical cord and plug need to be

    replaced.

    Appendix 15 Appendix 16

    Proper drainage provided and general

    housekeeping of koomey and cellar area? compliant

    Hydraulic lines protected? compliant Armor core on lines.

    BOP spare parts (for the service intended)

    are carefully stored, maintained and readily

    available. Including a complete set of ram

    rubbers, complete set of bonnet or door

    seals, plastic packing for BOP secondary

    seals. Ring gaskets to fit end connections.

    A spare annular BOP packing element and

    a complete set of seals. A flexible choke or

    kill line if in use. "Ask Toolpusher"

    compliant

    Metal clad lines secured with adequate

    safety cables?compliant

    All additional questions (1-51) in Section 9 will be used at the discretion of the DCIcustomer and their individual needs.

    Floor mounted and remote accumulator

    controls available?Yes

    Remote unit used to actuate pipe rams

    once a week?Yes

    Off floor controls are effective if floor unit is

    destroyed.Yes

    Alternate power source exists for

    accumulator : Type_________________Yes

    Electric, air, and nitrogen bottle

    accumulator exists

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 18 -

  • Question Response Details

    Light on rig floor in plain view of driller? Yes

    Operating ranges of accumulator pumps

    regulated from 2700 PSI to 3000 PSI?Yes

    Accumulator pump charging time less than

    15 minutes: Ensure 1000 PSI to 3000 PSI

    rise?

    Yes

    Accumulator fluid and strainers in good

    condition: Inspected_________________Yes

    Tank in front of system that is in good

    condition. Attached to skid.

    Accumulator bottle isolation valve open? Yes

    Accumulator pre-charge pressure _______

    Last inspected_________Yes

    1500 psi per charge

    Accumulator _________ Annular ________

    Manifold ________ (Pressures)Yes

    Accumulator air pressure at least 75 PSI Yes

    Drawings available showing BOP stack,

    lines, valves and manifold used?Yes

    Assembly rating greater than or equal to

    casing burst pressure or formation

    breakdown pressure (whichever is less).

    Yes

    Weco 1502 hammer unions used on

    surface casing valves?Yes

    Necessary manipulations of BOP stack can

    be made without going under rig floor?Yes

    Well can be closed in quickly while

    observing and controlling casing pressure?Yes

    Hydraulic or Manual locks on preventers: If

    manual, are hand wheels and shafts

    attached?

    N/A

    Clearance for tool joints between pipe rams

    (pipe can be stripped through rams).Yes

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 19 -

  • Question Response Details

    Is it possible to pump into well with blind

    rams closed?Yes

    Blind rams equipped with cover but no

    lock?Yes

    Choke flow line equipped with master

    valves on each choke manifold wing?Yes

    Is the fill up line separate from the kill line? Yes

    Choke line straight, free of bends? Yes

    Hydraulic choke equipped with emergency

    back- up. Type: ____________________Yes

    Choke manifold pressure rating __________

    Is it correct for this application?Yes

    10000 psi front end, 5000 psi on back side

    Upper Kelly valve or Top Drive Unit with

    manual & hydraulic valves?Yes

    Is drill pipe float used? Yes

    Are crossover subs available for IBOP &

    TIW?Yes

    Canrig Top Drive, subs ready to go.

    Pit volume totalizer & recorder mounted in

    plain view of driller?Yes

    Flow indicator available, if flow line can't be

    seen from rig floor?Yes

    Pump stroke counter and/or trip tank for

    use in critical hole filling checks?Yes

    Sufficient way to monitor casing wear? Yes

    Maximum allowable surface pressures

    upon closing in well specified and posted?Yes

    Surface casing held in tension until cement

    set to avoid misalignment?Yes

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 20 -

  • Question Response Details

    "on bottom" drills held at intervals, timed, &

    recorded on IADC?Yes

    "while tripping" drills held at intervals, timed

    & recorded on IADC?Yes

    "drill collar" drills held at intervals, timed &

    recorded on IADC?Yes

    "out of hole" drills held at intervals, timed &

    recorded on IADC?Yes

    Slow pump rates recorded hourly & after

    mud density changes?Yes

    Pipe slugged with sufficient time allowed

    for fluid level to balance before TOOH?Yes

    Flow checks made prior to TOOH, at the

    casing shoe & at collars?Yes

    During trips are ram-type BOP's operated

    and choke and kill valves flushed?Yes

    Is hole filled continuously from trip tank

    (preferred) is there a specified number of

    stands: __________________

    Yes

    Rig equipped with trip tank? Yes

    Written trip records kept by crew? Yes

    Crew instructed in procedures during trip if

    swabbing or lost circulation occurs?Yes

    Are approved kill sheets used & updated

    daily?Yes

    Leakoff pressure recalculated & posted

    after every mud density change?Yes

    Maximum allowable mud density posted? Yes

    DC, DP, hole & mud pump capacity figures

    available?Yes

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 21 -

  • Question Response Details

    DERRICK & SUBSTRUCTURE Score (27/27) 100.0%

    Derrick/A-Frame assembly and

    substructure pins with keepers in place?compliant

    Derrick guyed, if applicable. N/A

    Condition of guy lines. N/A

    Clamps properly installed. N/A

    Does the derrick or mast have a name plate

    permanently attached to the derrick, that

    includes the manufacturer, model number

    and serial number, hookload capacity and

    whether guying is applicable and if so the

    recommended guying pattern.

    compliant

    Damage and/or corrosion visible in derrick

    and/or substructure? (waste metal).N/A

    Condition of derrick ladder? Yes

    Climb assist device available, in good

    condition, adequate number of clamps?Yes

    Boatswains chair available for hoisting

    personnel and utilized when necessary? Yes

    Full body harness with lanyard available

    and in good condition?Yes

    Fall protection devices in use: Derrick

    Board, Crown Section, Backside of derrick

    (stabber), Substructure?

    compliant

    "Fall Protection Required" warning signs

    erected?compliant

    Verify that contractor has a Cat. 1,2,3,4

    process in place to identify structural

    issues. The remaining questions are

    designed to identify any noticeable items

    from the floor or ground.

    compliant

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 22 -

  • Question Response Details

    Derrick/Tubing boards in good condition? compliant

    Guardrails installed on derrick board? compliant

    Pipe fingers in good condition, safety

    cables attached?compliant

    Crown guardrails installed? compliant

    Crown sheave guards in place? compliant

    Safety retainers in use on hinge pins? compliant

    Derrick hydraulic system free of leaks? (if

    applicable).N/A

    Dead line properly anchored? compliant

    Booms and boom lines in good condition? compliant

    Adequate lighting provided? compliant

    Drreick free of loose and unnecessary

    objects.compliant

    Derrick emergency escape line properly

    installed, Geronimo on line, anchored with

    a clear path?

    compliant

    Tubulars, Drill Pipe, etc racked or hung in

    derrick are secured to prevent them from

    falling?

    compliant

    Mud standpipe secured, mudhose snubbed

    at both ends?compliant

    Rotary beams and all braces are in good

    condition?compliant

    DRILL FLOOR AREA Score (35/39) 89.7%

    OSHA poster posted in Dog House? No Need fire, ambulance, closes hospital

    Emergency phone numbers posted in Dog

    House?N/A

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 23 -

  • Question Response Details

    Safety (stabbing) valve and handle with

    cross over sub if necessary properly

    located on floor?

    Yes

    Remote BOP hydraulic controls

    accessible?compliant

    Rotary floor in good condition? compliant

    Rotary chain drive guarded? compliant

    All unused floor holes covered with a

    secure cover?compliant

    "Driller at or near controls unless the

    drawworks brake has been tied down or

    securing it with a catch lock, unless the

    drawworks is equipped with an automatic

    driller".

    Yes

    Drillers controls properly labeled/identified? compliant

    Pipe slips & Dies in good condition? compliant

    Racking floor area in good condition? compliant

    V-door gate or net provided and in place?non-

    compliantGate or Net needed

    Air hoist lines properly guarded in good

    condition, line properly laid with functional

    line guide and brake?

    compliant

    Cathead friction surface in good condition? N/A

    Cathead line divider/grip in good condition? N/A

    Catline not worn or kinked? N/A

    Kelly cock wrench and safety valve

    accessible?N/A

    Drilling Line in good condition? compliant

    Tail rope being used, rigged up correctly

    and in good shape?compliant

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 24 -

  • Question Response Details

    Drawworks properly guarded? compliant

    Drill line slip/cut recorded on ton mile

    book?compliant

    Proper lay of drill line and sufficient wraps

    left on drum with blocks in down position?

    (minimum 10 wraps).

    compliant

    When were the Hydraulic or Hydromatic

    brakes last serviced and what is the

    contractor's maintenance schedule?

    Safe

    Dog knot secure? compliant

    Adequate lighting provided? compliant

    General housekeeping. compliant

    Minimum 2 exits from drill floor doghouse? Yes

    Drill floor doghouse doors installed

    properly?Yes

    Drinking water available? compliant

    MSDS Station readily available?non-

    compliantNeed it in the dog house

    Life basket/Fire Blanket available compliant Not

    Factory ends of snub line? compliant

    First aid kit available in doghouse? Yes

    Non skid material used around rotary? compliant

    Guardrails installed along open edges of

    drill floor?compliant

    Tong body and jaws, keepers, counter

    weights, snub lines and jerk lines all in good

    condition?

    compliant

    Tong safety handles installed? compliant

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 25 -

  • Question Response Details

    Crown-o-Matic device operational, logged

    on IADC?

    non-

    compliant

    Needs to be on system

    Appendix 17 Appendix 18

    Safety signage posted? Yes

    All overhead lights have safety cables? compliant

    Top Drive Score (21/21) 100.0%

    TD: Guard Bolts. compliant

    TD: Blower Motor Mounts. compliant

    TD: Oil Cooler Bolts. compliant

    TD: Housing To Frame Bolts. compliant

    TD: Lube Pump Assembly Mounts. compliant

    TD: Guard Deflector. compliant

    TD: Link Tilt Cylinder Retainer. compliant

    TD: Link Tilt Mount. compliant

    TD: Bail Clamp Cylinder Pins. compliant

    TD: Lower Link Support Pins. compliant

    TD: Spark Arrestor Screen. compliant

    TD: Elevator Alarm Targets. compliant

    TD: BUW Mounts. compliant

    TD: BUW Positioning Cylinder. compliant

    TD: BUW Stop Pins (L-shaped pins). compliant

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 26 -

  • Question Response Details

    TD: BUW Gripper Cylinder. compliant

    TD: BUW Slides. compliant

    TD: BUW Stabbing Guide. compliant

    TD: Tool Joint Clamp(s) & Bolts. compliant

    TD: Actuator Valve / Covers. compliant

    TD: LWCV Pinion Retainer Bolts. compliant

    Iron Roughneck Score (10/10) 100.0%

    Iron Roughneck (IR): HPU Showing 2200-

    2500 psi.N/A

    IR: Line Control Port 1900-1950 psi. N/A

    IR: Hydraulic Lines Not Leaking . N/A

    IR: Unit Properly Stored If Not In Use. N/A

    IR: Unit Turned Off When Not In Use. N/A

    IR: Employees Properly Trained . N/A

    IR: Employee Clear Of Unit If Moving. N/A

    IR: Unit Has Clear Path For Operating. N/A

    IR: Operator Controls Located Properly. N/A

    IR: Preventive Maintenance (Daily) . N/A

    HOISTING TOOLS, HOOKS, BAILS, ELEVATORS Score (8/9) 88.9%

    Traveling blocks in good condition? compliant

    Traveling blocks properly guarded? compliant

    Sheave guards in good condition? compliant

    Bales and/or links in good condition? compliant

    Elevators in good condition? compliant

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 27 -

  • Question Response Details

    Hoisting hook equipped with safety latch or

    equivalent?compliant

    Crown block assembly secured? compliant

    Suspension cables and lifting chains are

    grade 8 and tagged?non-

    compliant

    No tags on cable for Spinner. Cotter pin

    needs to change on overhead shackle

    system. See picture on replacement part.

    Appendix 19 Appendix 20

    Hoisting line inspected daily? Yes

    HOTWORK AND CONFINED SPACES Score (10/10) 100.0%

    Hot work permitted utilizing customers Hot

    Work Process which meets minimum

    industry standards?

    N/A

    Drilling Foreman trained on customers Hot

    Work and Confined Space permitting

    standards?

    N/A

    Certified welders utilized? N/A

    Appropriate protective attire worn for

    welding and cutting ops.N/A

    Helmets with face shields used during

    operations?N/A

    Fire extinguishing equipment available and

    fire watch utilized?N/A

    Confined spaces properly labeled? N/A

    Confined Space Entry Permit issued by

    Drilling Foreman or rig contractor for CS

    entry?

    N/A

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 28 -

  • Question Response Details

    Permits are completed properly and filed at

    the job site?N/A

    Gas detection devices are available and

    calibrated per manufactures specifications?N/A

    ENVIRONMENTAL Score (11/11) 100.0%

    Sediment migrating off location? N/A

    Gullies or ditches forming along location

    slopes?N/A

    Re-vegetation less than 70%? N/A

    BMPs not present on location? N/A

    BMPs need maintenance or removal? N/A

    Reserve pit free of oil and trash? N/A

    Reserve pit liner, good integrity, anchored

    properly?N/A

    Reserve pit has sufficient free board? N/A

    Reserve pit fall controls in place? N/A

    Secondary containment (berms/ditches)

    adequate and maintained?compliant

    Pipe dope is lead free? compliant

    STAIRS, LADDERS, HANDRAILS & GUARDRAILS Score (7/7) 100.0%

    Adequate stairs provided off rig, min. of 2

    for drill floor?compliant

    Stairs level, secure with no obstructions? compliant

    Adequate handrails provided on stairs with

    4 or more risers?compliant

    Stair treads of uniform size made with non-

    skid material?compliant

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 29 -

  • Question Response Details

    Stair treads free of damaged?compliant

    Bottom stair rung on shaker side of catwalk

    stairs needs to be repaired.

    Stairs properly installed and pinned if

    required?compliant

    Guardrails, Midrails, & Toeboards installed

    along all open side edges of floors,

    platforms, etc, 4ft above ground level.

    compliant

    ADDITIONAL FINDINGS Score (10/10) 100.0%

    Other remarks #1 N/A

    Other remarks #2 N/A

    Other remarks #3 N/A

    Other remarks #4 N/A

    Other remarks #5 N/A

    Other Remarks #6 N/A

    Other remarks #7 N/A

    Other remarks #8 N/A

    Other remarks #9 N/A

    Other remarks #10 N/A

    DCInt000018DLRInspection reportScore (336/363) 92.6% - 30 -

  • Media

    Appendix 1 Appendix 2

    Appendix 3 Appendix 4

  • Appendix 5 Appendix 6

    Appendix 7 Appendix 8

  • Appendix 9 Appendix 10

    Appendix 11 Appendix 12

  • Appendix 13 Appendix 14

    Appendix 15 Appendix 16

  • Appendix 17 Appendix 18

    Appendix 19 Appendix 20

    DCInt000018DLRInspection report - 35 -