1 CALLOUT OF ENTRY ROOF STRUCTURE 2 SECOND FLOOR FRAMING PLAN · 2014. 4. 23. · 2 second floor...
Transcript of 1 CALLOUT OF ENTRY ROOF STRUCTURE 2 SECOND FLOOR FRAMING PLAN · 2014. 4. 23. · 2 second floor...
161514131211109876.7531
A
B
D
2
S101 S102
C
19
'-10
"2
'-2"
22
'-0"
20'-11 1/2" 20'-0" 13'-5" 6'-7" 6'-0" 8'-0" 6'-0" 14'-0" 6'-0" 14'-0" 6'-0" 14'-0" 6'-11 1/2"
EQ EQ EQ EQ EQ EQ
EQ
EQ
2'-0
"2
'-0"
EQ
EQ
2'-0
"2
'-0"NEW HORIZONTAL
BRIDGING 1X74 EQUALLEG ANGLES (TYP.)
NEW STEEL JOIST - 12K1(TYP.)
EX. BAR JOISTS
EX. BAR JOISTS EX. STEEL BEAMS EX. BAR JOISTS
EX. STEEL BEAMS
NEWELEVATORSHAFTFRAMING
161514131211109876.7531
A
B
D
C
3
S105
A.1
A.2
7.5 9.5
1
S105
2
S105
1
S101 S102
9'-4
"
19
'-10
"2
'-2"
22
'-0"
20'-11 1/2" 20'-0" 13'-5" 6'-7"10 1/2"
5'-1 1/2" 8'-0" 5'-1 1/2"10 1/2"
14'-0" 6'-0" 14'-0" 6'-0" 14'-0" 6'-11 1/2"
1
S101 S101
EX. BAR JOISTS
EX. BAR JOISTS EX. STEEL BEAMS EX. BAR JOISTS
EX. STEELBEAMS
NEW STAIRCASEFRAMING
10987
A
3
S105
A.1
A.2
7.5 9.5
1
S105
2
S105
EXISTING SLOPEDBEAMS
EXISTING Z-PURLINS (TYP.)TRIM FOR NEW ROOF FASCIA
NOTES:1. FASTEN NEW DECK TO EX. PURLINS USING 12-24 LONG-LIFE TEK
SCREWS (#5 DRILL POINT) AT 12" O.C. (EVERY OTHER VALLEY).2. USE #10 X 7/8" LAP TEK SCREWS W/ WASHERS AT 36" O.C. FOR
LAPS AND FLASHING.
9'-8
" T
YP
.
TYP.
~ 2'-6"
18'-7" TYP.
EXISTING SLOPED BEAM (TYP.)TRIM FOR NEW ROOF FASCIA
NEW STEEL BENTPLATE (TYP.)
EXISTING STEELTUBE COLUMN (TYP.)
DAVID P. SEGARSMM
C
OH
ON
WEALT F
LIC. NO. 26014
I
V
AINI
GR
PROFE
SSI ONAL ENG
I
RE
EN
O
SHEET NUMBER:
DRAWN BY:
APPROVED:
SCALE:
DESIGN BY:
PROJECT NO.
DWG. DATE:
REVIS
IONS
NO.
BY
COMMENTS
DATE
OF SHEETS
Ph.
(540)
943-1138 - Fax (5
40)
943-4526
E-Mail:
dave@segars
engineering.c
om
S ES
EG
AR
S E
NG
INE
ER
ING
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
E
D
F
G
H
I
J
K
As indicated
S101
313004
DRF
HCK
DPS
INV
IST
A400 D
uP
ont B
lvd.
Waynesb
oro
, V
A 22980
BE
NG
ER
LA
B R
EN
OV
AT
ION
SF
IRS
T, S
EC
ON
D A
ND
RO
OF
FR
AM
ING
PLA
NS
58
03/13/14
03/1
3/1
4A
HC
KIS
SU
ED
FO
R B
ID
1/8" = 1'-0"A402 S101
3 THIRD FLOOR/ROOF FRAMING PLAN
1/8" = 1'-0"A301 S101
2 SECOND FLOOR FRAMING PLAN
NOTE: EXISTING JOISTS FOR REPRESENTATION ONLY. SPACING BASED ON CONSTRUCTION DRAWINGS, LOCATIONAPPROXIMATE.
1/4" = 1'-0"S101 S101
1 CALLOUT OF ENTRY ROOF STRUCTURE
NOT FOR CONSTRUCTION
876.7
B
D
9'-3
1/2
"
LATERALLY BRACE TOP OF TUBE RAILSUPPORT w/ (2)-3"x3"x1/4" STEEL ANGLES.(TYP.)
3'-1 5/8"
C
8WF17
10WF2116WF36
16WF36
16
WF
45
16
WF
45
18
WF
50
C8X11.5
W8
X2
4
W16X31
W1
2X
22
13
S102 S105
12
S102 S105
14
S102 S105
9'-3
1/2
"
2'-2
"2
2'-0
"
6'-7" 6'-0"
1'-2"
5"
BEAM MUST ALLOW1/2" CLEARANCEFROM SHAFT WALL.
SAFETY BEAM TOP OF STEEL -6" FROM FANROOM FLOOR. BEAM MUST SUPPORT 5000LBAND BE REMOVED PRIOR TOELEVATOR OPERATION.
7
S102 S106
9876.7
B
D
C
RELOCATED BEAM
1'-1"
HHS4X4X1/4 SUPPORT COLUMNFOR ELEVATOR RAIL
8WF1710WF25
12WF27
8WF17
14
WF
30
16
WF
40
18
WF
60
10WF21
C1
0X
15
.3-1
C10X15.3-1
8W
F17
2
S106
DOG LEG
DOG LEG
DOG LEG
DOG LEG
6'-7" 6'-0" 8'-0"
HHS3X3X1/4COLUMN
BELOW
L4X4X1/2
L4
X4
X1
/2
L4
X4
X1
/2
(T.O
.S. -0
'-4
")
(T.O.S. -2'-1")
(T.O.S. -6'-2")
(T.O.S. -8'-6")
3'-7
3/4
"4
'-2 1
/8"
3'-7 5/8" 5'-9 3/4"
4'-1
1/4
"
5'-4"
DOG LEG
9
S102 S106
L4X4X1/2
MC
8X
8.5
L3X3X1/4
MC8X8.5
L3
X3
X1
/4
L3
X3
X1
/4
MC8X8.5
MC
12X
10.6
MC
12X
10.6
MC
8X
8.5
CONTINUOUS MC12X10.6
MC12X10.6
MC
12X
10.6
MC
12X
10.6
CO
NT
INU
OU
S M
C1
2X
10.6
CO
NT
INU
OU
S M
C1
2X
10.6
CONTINUOUS MC12X10.6
CONTINUOUS MC12X10.6
4"
2'-11 5/8"
( 2'-11 5/8" )
10
3/4
"
8'-6
3/4
"
5
S102 S106
INTERIORHSS3X3X1/4
COLUMN(TYP.)
HHS3X3X1/4COLUMN
BELOW
4
S106
HHS4X4X1/4 SUPPORT COLUMNFOR ELEVATOR RAIL
1
S106
MC12X10.6
(T.O
.S. -0
'-4
")
(T.O.S. -2'-1")(T
.O.S
. -2
'-1")
(T.O
.S. -2
'-4
")
(T.O.S. -5'-5")
(T.O
.S. -6
'-2
")
(T.O
.S. -6
'-2
")
(T.O
.S. -7
'-9
")
(T.O.S. -8'-6")
(T.O
.S. -8
'-6
")
6'-4
7/8
"
5'-8
3/4
"
2'-2
"
1'-2 3/4"
10 3/8"
1'-3 1/4"
CO
L T
O
C
OL
4'-5
1/2
"
C
OL
TO
CO
L
5'-3
"
C
OL
TO
CO
L
4'-6
1/4
"
22
'-0"
DO
G L
EG
DO
G L
EG
2'-3 3/8"
4'-2 3/4" 3'-9 1/4"
COL TO COL
2'-6"
1'-9 3/4"
6
S106
3
S106
DAVID P. SEGARSMM
C
OH
ON
WEALT F
LIC. NO. 26014
I
V
AINI
GR
PROFE
SSI ONAL ENG
I
RE
EN
O
SHEET NUMBER:
DRAWN BY:
APPROVED:
SCALE:
DESIGN BY:
PROJECT NO.
DWG. DATE:
REVIS
IONS
NO.
BY
COMMENTS
DATE
OF SHEETS
Ph.
(540)
943-1138 - Fax (5
40)
943-4526
E-Mail:
dave@segars
engineering.c
om
S ES
EG
AR
S E
NG
INE
ER
ING
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
E
D
F
G
H
I
J
K
1/2" = 1'-0"
S102
313004
DRF
HCK
DPS
INV
IST
A400 D
uP
ont B
lvd.
Waynesb
oro
, V
A 22980
BE
NG
ER
LA
B R
EN
OV
AT
ION
SC
OR
E F
AC
ILIT
IES
ST
RU
CT
UR
E
58
03/13/14
03/1
3/1
4A
HC
KIS
SU
ED
FO
R B
ID
1/2" = 1'-0"S101 S102
2 CORE FACILIT IES - THIRD FLOOR STRUCTURE
NOTES:1. GRAY INDICATES EXISTING STEEL.2. BOLD BLACK INDICATES PROPOSED NEW OR RELOCATED STEEL.
1/2" = 1'-0"S101 S102
1 CORE FACILITIES - SECOND FLOOR STRUCTURENOT FOR CONSTRUCTION
161514131211109876.7531
A
B
D
C
A.1
A.2
7.5 9.5
FILL PENETRATION
PATCH HOLES FROMDEMO'D PIPES
PATCH HOLES FROMDEMO'D PIPES
PARTIALLY FILL PENETRATION
FILL PENETRATION
FILL PENETRATION
7
S103 S105
7
S103 S105
7
S103 S105
SAW CUT THIS PORTION OF FLOORFOR THE ELEVATOR INSTALLATION.8
'-8"
7'-3 1/2"
7'-3 1/2"
8"
7 1/2"
161514131211109876.7531
A
B
D
C
A.1
A.2
7.5 9.5 151413
D
3
A302
4" SLAB ON GRADE4,500 PSI W/ 6X6 10/10 WWF (FLAT SHEETS) OVER6 MIL. POLY VAPOR BARRIER (LAPPED 6" MIN.)OVER #57 STONE BACKFILL.
SLAB CONTROL JOINTSEE DETAIL SHT. S103 (TYP.)
3
S103 S107
EQUAL EQUAL
161514131211109876.7531
A
B
D
C
A.1
7.5 9.5
FILL PENETRATION
7
S103 S105
161514131211109876.7531
A
B
D
C
A.1
7.5 9.5
1'-0
3/4
"7
'-4"
8 3/4"5'-9"
7
S103 S105
7
S103 S105
7
S103 S105
7
S103 S105
FILL PENETRATION
FILL PENETRATION
FILL PENETRATION
FILL PENETRATION
4 3/8"
COL. LINE TO CUT7/8"SAW CUT LARGER
STAIR OPENING
SAW CUT 5'-9" x 7'-4" OPENING FOR ELEVATOR
3 3
/4"
DAVID P. SEGARSMM
C
OH
ON
WEALT F
LIC. NO. 26014
I
V
AINI
GR
PROFE
SSI ONAL ENG
I
RE
EN
O
SHEET NUMBER:
DRAWN BY:
APPROVED:
SCALE:
DESIGN BY:
PROJECT NO.
DWG. DATE:
REVIS
IONS
NO.
BY
COMMENTS
DATE
OF SHEETS
Ph.
(540)
943-1138 - Fax (5
40)
943-4526
E-Mail:
dave@segars
engineering.c
om
S ES
EG
AR
S E
NG
INE
ER
ING
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
E
D
F
G
H
I
J
K
As indicated
S103
313004
DRF
HCK
DPS
INV
IST
A400 D
uP
ont B
lvd.
Waynesb
oro
, V
A 22980
BE
NG
ER
LA
B R
EN
OV
AT
ION
SS
TR
UC
TU
RA
L S
LA
B P
LA
NS
58
03/13/14
03/1
3/1
4A
HC
KIS
SU
ED
FO
R B
ID
1/8" = 1'-0"A301 S103
1 FIRST FLOOR SLAB PLAN 1/4" = 1'-0"A101 S103
2 CALLOUT OF F IRST FLOOR EXIT STAIRWELL SLAB
1/8" = 1'-0"A301 S103
3 SECOND FLOOR SLAB PLAN
NOT FOR CONSTRUCTION
161412109876.7531
A
B
D
C
EXIST. CURB AND PENETRATION.PROVIDE SHOP DRAWINGSFOR A CAP AND ROOFING
DAVID P. SEGARSMM
C
OH
ON
WEALT F
LIC. NO. 26014
I
V
AINI
GR
PROFE
SSI ONAL ENG
I
RE
EN
O
SHEET NUMBER:
DRAWN BY:
APPROVED:
SCALE:
DESIGN BY:
PROJECT NO.
DWG. DATE:
REVIS
IONS
NO.
BY
COMMENTS
DATE
OF SHEETS
Ph.
(540)
943-1138 - Fax (5
40)
943-4526
E-Mail:
dave@segars
engineering.c
om
S ES
EG
AR
S E
NG
INE
ER
ING
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
E
D
F
G
H
I
J
K
1/8" = 1'-0"
S104
313004
DRF
HCK/RMW
DPS
INV
IST
A400 D
uP
ont B
lvd.
Waynesb
oro
, V
A 22980
BE
NG
ER
LA
B R
EN
OV
AT
ION
SS
TR
UC
TU
RA
L S
LA
B P
LA
N
58
03/13/14
03/1
3/1
4A
HC
KIS
SU
ED
FO
R B
ID
1/8" = 1'-0"A301 S104
1 PENTHOUSE AND ROOF SLAB PLAN
NOTE: EXISTING PENETRATIONS ARE SHOWN. SEE MECHANICAL PLANS FOR NEWPENETRATIONS. ALL EXPOSED PENETRATIONS MUST BE FILLED IN ACCORDANCE WITH 5/S105.
NOT FOR CONSTRUCTION
4"
SPACE REBAR @ 12" O.C.E.W.
#4 REBAR, 6" LG. W/3" EPOXY EMBED
HIGH STRENGTH NON-SHRINK GROUT
NOTES:1. ALTER EXISTING PENETRATIONS TO HAVE 15 DEGREE ANGLED
SIDES.2. CLEAN SURFACES W/ WIRE BRUSH AND CLEANSE W/ MURIATIC
ACID PRIOR TO POURING HIGH STRENGTH GROUT.3. FLOOR PENETRATIONS FROM PIPING, CONDUIT, AND DUCT.
4x4-W2.9xW2.9 W.W.F. WELDEDTO REBAR E.W.
TYP.
∠(2) 3 1/2" X 3 1/2" X 3/8"8 - 3/4" Ø H.S. BOLTS
NEW W16 STEEL BEAM
EX. W16 STEEL BEAM
COPE EX. BEAM TOP & BOTT.TO ALLOW CONNECTION
1'-0"
1 1/
2" T
YP.
1"3" T
YP.
3/16
TYP.
∠2 3 1/2" X 3 1/2" X 3/8"8 - 3/4" Ø H.S. BOLTS
EX. W18 STEEL BEAM
NEW W16 STEEL BEAM
COPE NEW BEAM TOPTO ALLOW CONNECTION
1'-0"
1 1/
2" T
YP.
3" T
YP.
3/16
TYP.
∠2 3 1/2" X 3 1/2" X 3/8"4 - 3/4" Ø H.S. BOLTS
EX. W16 STEEL BEAM
NEW W8 STEEL BEAM
COPE NEW BEAM TOPTO ALLOW CONNECTION.
6"TY
P.1
1/2"
3" T
YP.
3/16
EXIST. FOOTING OR TUNNEL WALLNEW REINFORCEDCONC. FOOTING OR SHAFT WALL
12" LG. #6's @12" O.C.; EPOXYEMBED USING HILTI HIT-RE 500
EPOXY ADHESIVE A.S. 3.2.7
STRICTLY FOLLOW HILTISPECIFICATIONS FOR HOLEDRILLING, CLEANING, & PREPARATION.6"
6"
77.5
EXISTING W12X22 BEAM
1/4
EXISTING Z PURLIN30" O.C.
1.5B24 ROOF DECKING
3 5/8" METAL STUD
CANOPY ANCHOR
1/4" BENT PLATE
L3X3X1/4
TACK
10 9.5
1/4
EXISTINGW12X22 BEAM
EXISTING Z PURLIN30" O.C.
1.5B24 ROOFDECKING
3 5/8" METAL STUD
CANOPYANCHOR
1/4" BENTPLATE
L3X3X1/4 TACK
TACK
1.5B24 ROOF DECKING
EXISTING W12X22 BEAM
11' - 3"
A.2
TOP OF EXISTING BRICK
EXISTING Z PURLIN 30" O.C.
3 5/8" METAL STUD
4S105 S105
EXISTING SLOPED GROUTBED (BEYOND WINDOW)
87
Tunnel Floor-8' - 4"
EXST. MECH.TUNNEL
3" C
LR.
3" CLR.
9S105 S105
3" CLR.
HORIZONTAL #4's @ 12" O.C.
1"X1/8" GALVANIZEDSTEEL BAR GRATING
#6's @ 12" O.C.
#6's @ 12" O.C. EACH WAY
#5's @ 16" O.C.EACH WAY
8" CONCRETE WALL
2 - #5's @ TOP &BOTTOM OF WALL
#6's @ 12" O.C. EACH WAY
1'-0"
6" 8" 6'-7 3/4"
7'-9 3/4" X 9'-2 3/4"
3'-3"
1'-0"
6S105 S105
2'-6"
3'-10"
1/8"x6" WATERSTOP, TYP.FOR ALL COLD JOINTS
NOTE:WATER STOPS TO BE ELASTOMERIC OR OTHERAPPROVED MATERIAL. DIMENSIONS SHOWNARE ABSOLUTE MINIMUM.
C-H METALSTUDS
BACKFILL W/ #57 STONE
1/4" BENT PLATEDIMENSIONS
2"
1'-1"
Tunnel Floor-8' - 4"
3/16
1 1/2" X 1/4" BAR ANCH.@ 3'-0" (1/2" DIA. STUDOPTIONAL).
3"
1 1/2"
1 1/4"X1 1/4"X1/4"GALVANIZEDCONCRETE CURBANGLE (TYP.) SAW CUT JOINT 4 TO 12 HOURS AFTER
FINISH. FILL USING SEMI-RIDGI EPOXY WITHA MINIMUM HARDNESS OF SHORE A80 AFTER
CONCRETE HAS CURED FOR 28 DAYS
NOTE: USE CAUTION NOT TO EXCEED DEPTH OF SAW-CUT SHOWN TO PREVENT CUTTING REINFORCEMENT
TOP OF SLABON GRADE
1/8" MAX1/4" PER 1" SLABTHICKNESS
A.2
3/16
3/16
3/16
3/16
#14-28 TEK SCREWS, CLIMASEAL® COATING @ 24" O.C.
#14-28 TEK SCREWS, CLIMASEAL® COATING @ 24" O.C.
3/4" PLYWOOD SUBSTRATE
ALUMINUM BREAK METAL
ALUMINUM BREAK METAL
3 1/2"
5"
3/8"
3-1/2" DIA.,t = 1/4"
1/4"
3 3/4"
4" 1/4"
2 1/2"
2 1/
2" t = 1/4", SEE ARCH.ELEVATIONS FORSPACING
NOTE:ALL SHAPES, PLATES, & BARS ARE6061-T6 ALUMINUM
First Floor0"
7
EX. FLOOR SLAB
NEW ELEVATOR SHAFT WALL
BENT #4 REBAR,ADHESIVE EMBED 6" INTOEX. SLAB @ 12" O.C.
1'-3"
MIN
.
BACKFILL w/ #57 STONE,12" MIN. AT TOP & 4" MIN.
AT BOTTOM (TYP.)
D
8" CONCRETE WALL
#5's @ 16" O.C.EACH WAY
BACK FILL W/#57 STONE
2'-0" MIN.
DAVID P. SEGARSMM
C
OH
ON
WEALT F
LIC. NO. 26014
IV
AI N
IGR
PROFESS I ONAL ENG
I
RE
EN
O
SHEET NUMBER:
DRAWN BY:
APPROVED:
SCALE:
DESIGN BY:
PROJECT NO.
DWG. DATE:
REVIS
IONS
NO.
BY
COMMENTS
DATE
OF SHEETS
Ph. (540) 943-1138 - Fax (540) 943-4526
E-Mail: [email protected]
S ESE
GARS
ENG
INEE
RING
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
E
D
F
G
H
I
J
K
As indicated
S105
313004
DRF
HCK
DPS
INVI
STA
4 00
Du P
ont B
lvd .
Way
nes b
o ro,
VA
22 9
80BE
NG
ER L
AB R
ENO
VATI
ON
SD
ETAI
LS
58
03/13/14
03/1
3/14
AH
CK
ISSU
ED F
OR
BID
1 1/2" = 1'-0"S103 S105
7 ELEVATED SLAB PATCHING DETAIL
1 1/2" = 1'-0"S102 S105
12 BEAM TO BEAM CONN 1 1 1/2" = 1'-0"S102 S105
13 BEAM TO BEAM CONN 2 1 1/2" = 1'-0"S102 S105
14 BEAM TO BEAM CONN 3
3/4" = 1'-0"S105 S105
9 REBAR EMBEDMENT DETAIL
1" = 1'-0"S101 S105
2 ENTRY ROOF STRUCTURE DETAIL @ WEST WALL 1" = 1'-0"S101 S105
1 ENTRY ROOF STRUCTURE DETAIL @ EAST WALL 1" = 1'-0"A301 S105
3 ENTRY ROOF STRUCTURE DETAIL @ NORTH WALL
1" = 1'-0"A401 S105
10 ELEVATOR PIT FOUNDATION & WALL SECTION
3" = 1'-0"S105 S105
6 SUMP GRATE SUPPORT 3/4" = 1'-0"S105
8 SLAB CONTROL JOINT DETAIL
1 1/2" = 1'-0"S105 S105
4 ALUMINUM ENTRY FACADE
1" = 1'-0"A401 S105
5 ELEVATOR SHAFT WALL SECTION
1" = 1'-0"A104 S105
11ELEVATOR SHAFT WALLSECTION @ FOOTING
NOT FOR CONSTRUCTION
11"
3"
2'-10
"3'-6
"
CARRIER ANGLE, COPE ENDSPARALLEL TO STRINGER
2 1/2" X 2 1/2" X 1/4" STEEL CLIP ANGLE, 5" LG.ANCHOR STRINGER TO SLAB W/ (2) -5/8" ΦHILTI KWIK BOLTS, TZ CARBON STEEL
SAW CUT EX. FLOOR SLAB, POURTHICKENED SLAB & DOWEL INTO EXISTING
14 GA. STEEL PANWIRE MESH REINFORCEDCONCRETE FILL
PAINTED MC12 X 10.6STEEL STRINGER
1/4" STEEL PLATECLOSURE
EX. FLOOR SLAB
NOTE:
EXTEND THICKENED SLAB 6" BEYOND STRINGER EACH SIDE OF STAIR.
3/16
3/16TYP.
6"
ADD (2) #4 CONT.
1'-0"
SEE DETAIL 15/S106
L4x4x3/8x0'-8"
STRINGER PER PLAN
1/43 SIDES
L2x2x3/16
3/16 3-12
3/16 3-12
STRINGER - MC12
POUR STOP
HEADERCHANNEL - MC8
1/43 SIDES
1/43 SIDES
VE
RIF
Y W
/ A
RC
H
3"
STRINGER - MC12
PL5/16x4x0'-4"EA END
4x4x1/4 ANGLESUPPORT
1/4
1/4
1/4
1/4
NW CONCRETE SLAB 0.6C2.6DECK W/ 6x6-W2.1xW2.1W.W.F.
4"
4"
3/16
GRINDSMOOTH
2"X1'-4 1/2"X1/4" STEEL PLATE
3/16
GRINDSMOOTH
BREAK METAL TO FILL IN WHENPAN EXTENDS PAST COLUMN.
MC12 CHANNEL
MC12 STRINGER
STEEL COLUMN
2"X1'-4 1/2"X3/8"STEEL PLATE
STEEL COLUMN
MC12 STRINGER
1'-4
1/2
"
1/4
GRINDSMOOTH
3/16
GRINDSMOOTH
MECHANICALLY FASTENPANELS TO POSTS (TYP.)
3/4" SQUARE PTD. STEEL BAR
3"
2'-4
"3
"
3'-0
"
3'-6
"
3 1/2"3 1/2"
2'-8" MIN.4'-6" MAX.
BRUSHED ALUMINUM
BRUSHED ALUMINUM GLASS PANEL (TYP.)
3/16
3/16 ALL WELDSGRINDSMOOTH
3"
3"
4 - COUNTERSUNK 3/8" DIA. MACHINE SCREWSIN THREADED HOLES THRU 1/4" FLANGES.
PAINTED STEEL RISERS
3/8" TILE (SEE SPECS)
THIN SET MORTAR
5/8
" IN
SE
T
1/2" RADIUS
TILED LANDINGS
1/4" CLEAR TEMPERED GLASSPANELS SUPPORTED &
INSTALLED IN ACCORDANCEWITH MANUFACTURERS
SPECIFICATIONS
2 - 3/8" BOLTS THUR 3/8" FLANGES
3"
1 1/2" SQUARE STEEL BAR
3/4" SQUARE PTD. BARMECH FASTEN TO FRAMES
3/4" SQUARE PTD. STEEL BAR
1 1/4" ALUM. PIPE RAIL
JULIUS BLUM # 6930 ALUM.
JULIUS BLUM #322 ALUM.LOCATED AT POSTS
GLASS PANEL
3/4" SQUARE PTD. BARMECH FASTEN TO FRAMES
7X7X3/4 STEELBASE PLATE
(4)-3/8" Ø WEDGE ANCHORS
1 1/4" (TYP.)
1/4
8" CONCRETE WALL
3/16" STEEL PLATE TIE, 6" WIDE
3/8" Φ HILTI ANCHORSCARBON AB-TZ
6X6X3/8 STEEL PLATE
3/16
3/16
B
4"X8 1/4"X1/2" BENT PLATE
(2) 3/4" DIA.H.S. BOLTS
MC12 STRINGER
EXISTING BEAM
3/16
4-WEDGE ANCHORS(TYP.)
CHIP OUT EXISTINGCONCRETE TO FIT
BASEPLATE, GROUTFILL TO FINISH
EX. FLOOR SLAB
2"
MA
X.
3/16TYP.
STEEL BEAM
NOTE:1. WELD TO BOTH SIDES OF TUBE &
UNDERSIDE OF BEAM.2. SEAL ALL PENETRATIONS THROUGH
SHAFT WALL W/ FIRE RATED SEALANT.
STEEL TUBEELEVATOR RAILSUPPORT
6" SQUAREPLATE, 1/2" THK.
8" CONCRETE WALL
4" SQUARE TUBE COL.EMBEDDED INTO
CONCRETE WALL
1/4
1/4
FIRST FLOOR
4" SQUARETUBE COL.
3"
1/4" STEEL PLATE
4"
1/4 1.5
COMPLETEJOINTPENETRATION
3/16
1/4 1.5
COMPLETEJOINTPENETRATION
TYP.
TYP.
8"X8"X3/4" BASE PLATEw/(4) 3/4" Ø HEX HEAD
ANCHOR BOLTS
8 1/2"X4 1/2"X3/4" PLATEw/(2) 3/4" Ø THRU BOLTS
4" SQUARE TUBE
3/16TYP.
2ND FLOOR
ELEVATORSHAFT FLOOR
3/8" THK. PLATE; DIM TOALLOW (1.5)Ø FROM C/LOF ALL BOLT HOLES TO
EDGE OF PLATE
TACK WELD PLATETO BOLT HEADS
7"
DAVID P. SEGARSMM
C
OH
ON
WEALT F
LIC. NO. 26014
I
V
AINI
GR
PROFE
SSI ONAL ENG
I
RE
EN
O
SHEET NUMBER:
DRAWN BY:
APPROVED:
SCALE:
DESIGN BY:
PROJECT NO.
DWG. DATE:
REVIS
IONS
NO.
BY
COMMENTS
DATE
OF SHEETS
Ph.
(540)
943-1138 - Fax (5
40)
943-4526
E-Mail:
dave@segars
engineering.c
om
S ES
EG
AR
S E
NG
INE
ER
ING
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
E
D
F
G
H
I
J
K
As indicated
S106
313004
DRF
HCK
DPS
INV
IST
A400 D
uP
ont B
lvd.
Waynesb
oro
, V
A 22980
BE
NG
ER
LA
B R
EN
OV
AT
ION
SD
ET
AIL
S
58
03/13/14
03/1
3/1
4A
HC
KIS
SU
ED
FO
R B
ID
3/4" = 1'-0"S106
14 INTERIOR STAIR BASE DETAIL
1 1/2" = 1'-0"S102 S106
1 STRINGER CONNECTION DETAIL
1 1/2" = 1'-0"S106
12 TYPICAL STAIR INTERMEDIATE LANDING
1" = 1'-0"S102 S106
2 STRINGER TO COLUMN CONNECTION
1 1/2" = 1'-0"S106
15 INTERIOR STAIR RAILING
3" = 1'-0"S106
13
INTERIOR STAIR
RAILING DETAIL
1 1/2" = 1'-0"S102 S106
5
COLUMN TO BASE
PLATE CONNECTION
1 1/2" = 1'-0"A104 S106
11
ELEVATOR RAIL SUPPORT
TUNNEL LEVEL
1 1/2" = 1'-0"S102 S106
9
STRINGERS BEARING ON
COLUMN CONNECTION
1 1/2" = 1'-0"S102 S106
4 STRINGER TO BEAM CONNECTION 3/4" = 1'-0"S102 S106
6 EMBEDDED BASEPLATE DETAIL
1" = 1'-0"S102 S106
7 ELEVATOR RAIL SUPPORT BRACING @ 3RD FLOOR 1" = 1'-0"S106
8 ELEVATOR RAIL SUPPORT @ 1ST FLOOR
1 1/2" = 1'-0"A406 S106
3 TYPICAL DOG LEG CONNECTION
1" = 1'-0"S106
10 ELEVATOR RAIL SUPPORT
NOT FOR CONSTRUCTION
1/8
1/8
3X3X3/16 CLIP ANGLE BOLTED TOMASONRY WITH 5/8" DIA. EXPANSIONANCHOR. THE EXTENDED SECTIONOF EACH ANGLE SHOULD ALIGNWITH THE HORIZONTAL BRIDGING.
MASONRY WALL
D
NOTE:DETAIL APPLICABLE AT 2ND & 3RD FLOOR BEAMS
5/16
5/16
EXISTING WALLNEW PARAPET WALL
BOND BEAM
HOOKED #5 OR (2) #3's SPACED 8" APART(PREERABLY IN GROUT BEDS)
#5 VERTICAL CONTINOUS FROMPARAPET TO FOUNDATION
2'-0" O.C.
EXIT STAIRWELL BLDG (TYP.)
2"
1/4" STEEL STIFFENER PLATE
First Floor0"
D
EXISTING FOUNDATION WALL
EXISTING FOOTING
SEE REBAR DETAIL ON SHT. S103
EXISTING WALL
1'-0
"
FOUNDATION WALL
FIRST FLOOR SLAB OF EXIT STAIRWELL
STAIRWELL FOOTING
VERTICAL #6's@ 12" O.C.
HORIZONTAL #4's@ 12" O.C.
WATERSTOP
3'-6
3/4
"
1'-0
"
3" CLR.
3"
CL
R.
4" SLAB ON GRADE
#5's @ 12" O.C.
(SEE TUNNEL PLAN: A104)
5'-0"
MA
X.
2'-1
0 3
/4"
BE
LOW
GR
AD
E
2'-0
" M
IN.
F.F.E. 1285.90
2" CLR. 2" CLR.
1'-4"
POURED EXP. JT SEALER
12" CAST-IN-PLACEREINFORCED
CONCRETE WALL
KEYED JOINT
ELASTOMERIC FILLER
2" CLR.
1/2" UNLESS NOTED
E.G.1283.00
REFERENCE SHEET A403 FOR STRUCTURAL SLAB PLAN FOR EXIT STAIR BUILDINGS.
4" MIN. EMBEDMENT
4" DIA. FOUND. DRAINPIPE IN #57 STONE &WRAPPED IN FILTERFABRIC TO EX.STORMWATER SYSTEMOR DAYLIGHT
EXISTING MASONRY WALL
NEW EXTERIOR BRICK
EXPANSION JOINT - PREMOLDEDFOAM, RUBBER OR PLASTIC
NEW INTERIOR STRUCTURAL BLOCK
WIDTH OF HEAD JOINT
TH
E H
EA
D J
OIN
T
DE
PT
H O
F C
AU
LK
ING
1/2
TH
E W
IDT
H O
F
PREMOLDED FOAM,RUBBER OR PLASTIC
CAULKING DETAIL OF EXPANSION JOINT
FILL MASONRY CELLS THREE COURSES BELOW BEARINGPL. OR DOWN TO MASONRY LINTEL AS SHOWN HATCHED.(ALTERNATIVELY PROVIDE SOLID MASONRY EXTENDINGFULL HEIGHT DOWN TO THE FOUNDATION.)
5/8" DIA.ANCHOR BOLT
4"X5"X3/8" PL.
1" GROUT PAD
1/2"
C12
C12
NOTE:ANCHOR BOLT, BEAM, & BOTTOM PL.WILL BE FURNISHED W/ STRUCTURAL STEEL UNO.
HORZ. REINF. W/ #9 GAWIRE, LADDER TYPE @EVERY OTHER GROUT BED.
VERT. REINF. W/ #6 @ 32" O.C.
GROUT FILL FULL HEIGHT @ 32" O.C.
8" CMU
HOOKED REBAR - PLAN VIEW
STEEL JOIST
STEEL DECK 1.0C26 W/ 2.5" RIGID INSULATION,6X6 - W1.4XW1.4 W.W.F.
1/4
1/4
STEEL PLATE 5X5X3/8 W/ STUDS
GROUT FILLED BOND BEAMW/ 2- #5's CONT.
ROOF DECK:1. FASTEN TO BAR JOISTS USING12-24 LONG-LIFE TEK SCREWS (#5 DRILL POINT) AT 36/4 PATTERN(EVERY OTHER VALLEY).2. USE 14 -14 X 7 8" LAP TEKSCREWS W/WASHERS AT 14" O.C.FOR LAPS.
DAVID P. SEGARSMM
C
OH
ON
WEALT F
LIC. NO. 26014
I
V
AINI
GR
PROFE
SSI ONAL ENG
I
RE
EN
O
SHEET NUMBER:
DRAWN BY:
APPROVED:
SCALE:
DESIGN BY:
PROJECT NO.
DWG. DATE:
REVIS
IONS
NO.
BY
COMMENTS
DATE
OF SHEETS
Ph.
(540)
943-1138 - Fax (5
40)
943-4526
E-Mail:
dave@segars
engineering.c
om
S ES
EG
AR
S E
NG
INE
ER
ING
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
E
D
F
G
H
I
J
K
As indicated
S107
313004
DRF
HCK
DPS
INV
IST
A400 D
uP
ont B
lvd.
Waynesb
oro
, V
A 22980
BE
NG
ER
LA
B R
EN
OV
AT
ION
SD
ET
AIL
S
58
03/13/14
03/1
3/1
4A
HC
KIS
SU
ED
FO
R B
ID
1 1/2" = 1'-0"A302 S107
5 JOIST BRIDGING DETAIL
1" = 1'-0"A302 S107
2 STRUCTURAL T IE BACKS DETAIL
1" = 1'-0"A302 S107
7 FOUNDATION TIE BACK DETAIL 1" = 1'-0"A302 S107
6 EXIT STAIRWELL FOUNDATION & WALL DETAIL
1 1/2" = 1'-0"S103 S107
3 EXISTING TO NEW EXPANSION JOINT
1" = 1'-0"A402 S107
8 MASONRY BEAM SEAT
1" = 1'-0"A302 S107
4 EX IT STA IRWELL WALL STRUCTURE DETA I L
1" = 1'-0"A402 S107
1 EXIT STA IRWELL ROOF STRUCTURE DETAIL
NOT FOR CONSTRUCTION