1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 [email protected]...
-
Upload
barbra-moore -
Category
Documents
-
view
219 -
download
3
Transcript of 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 [email protected]...
![Page 1: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/1.jpg)
1
Cal Standards Review Cal Standards Review
Jeff AndersonNAVSEA 04RM34
(757) 396-0248 x [email protected]
5 May 2009
![Page 2: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/2.jpg)
2
OBJECTIVE:The NAVSEA TMDE Program Calibration Standards Acquisition effort
is to ensure:
– Calibration capability in support of Fleet TMDE workload
– Modernized calibration standards– Reduction of overall hardware footprint while
increasing capability– Utilization commercial technology advances
Establish “Benchmark” of processes to maximize calibration resources, support posture and acquisition.
![Page 3: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/3.jpg)
3
Provide life-cycle engineering support for
acquisition and in-service products
– CAL STDs Allowancing– Engineering Investigations
Sustainment of current calibration capability Calibration support issues
– CAL STDs Replenishment Recommendation for short term capability
– CAL STDs Modernization Recommendation for long term capability
![Page 4: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/4.jpg)
4
CALIBRATION STANDARD ALLOWANCING
CALIBRATION STANDARD ALLOWANCING
![Page 5: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/5.jpg)
5
Calibration Standards Allowancing
Background
– Allows the NAVSEA logistics manager to plan calibration standards buys
– Establishes hardware requirements of an activity to support Fleet Test Equipment workload.
– Facilitates standardization of calibration standards
There is a requirement to reduce acquisition and logistic costs associated with General Purpose Test Equipment (GPETE) and the calibration standards that support them.
![Page 6: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/6.jpg)
6
CALSTD SCAT Codes Implemented 8000 Series Calibration Standard
(CALSTD) SCAT codes
8000 Series CALSTD SCAT codes are aligned with data from the Navy Calibration Equipment (NCE) Listing
Generic Category in the NCE will have a root 8000 series CALSTD SCAT code assigned to it. – For example, Accelerometer will be CALSTD SCAT
code 8000
Generic Categories Subcategory in the NCE will have a three character suffix applied to the root 8000 series CALSTD SCAT code.– For example, Accelerometer has a subcategory of
Back to Back, Voltage Type. The CALSTD SCAT code for this subcategory will be 8000100
![Page 7: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/7.jpg)
7
CALSTD SCAT Codes
All equipment listed in the NCE Subcategories that are of NAVSEA interest shall take on the Subcategories CALSTD SCAT code – For example, M/N 8076K5020 (58679) is listed as
the STD for this Subcategory. This model will be assigned the Subcategories CALSTD SCAT code of 8000100
Since the CALSTD SCAT code is Subcategory based there shall be no issues with the possibility of a calibration facility incorrectly using the CALSTD SCAT code for substitutions
![Page 8: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/8.jpg)
8
CALSTD SCAT Codes
CALSTD SCAT codes will be linked to NAVSEA Workstations – This linkage will be used to see if the calibration
activity has the full suite of calibration standards required by the workstation.
– It will also determine if the calibration activity has the prime calibration standard or a substitute in inventory
NAVSEA Workstations can be linked to workload and in turn to GPETE SCAT codes
![Page 9: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/9.jpg)
9
New CALSAL Report
Updating to reflect new 8000 Series CALSTD Scat codes
Changing format to be easier to read and more in line with calibration standard terminology
Implemented suggestions from activities on sections to include
![Page 10: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/10.jpg)
10
New CALSAL Report
![Page 11: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/11.jpg)
11
New CALSAL Report
![Page 12: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/12.jpg)
12
New CALSAL Report
![Page 13: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/13.jpg)
13
New CALSAL Report
![Page 14: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/14.jpg)
14
New CALSAL Report
![Page 15: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/15.jpg)
15
New CALSAL Report
![Page 16: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/16.jpg)
16
Calibration Standards Allowancing
There are three types of allowancing
– Baseline Created from calibration activities current
calibration standards inventory
– Initial Determined after inventory review of baseline
allowance document and workload assessment
– Continued Maintenance Maintaining of the data in both of the
allowancing documents
![Page 17: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/17.jpg)
17
Once a baseline CALSAL has been finalized, calibration activities will need to request changes to their current CALSAL due to emergent and changing workload requirements.
SYSCOM “Pushed” standards will automatically be updated to your inventory.
All changes to the CALSAL must be in the form of a CALSAL Change Request (CR).
The CALSAL CR is available via the website.– https:\\metcal.nmci.navy.mil
CALSAL Change Request (CR)
![Page 18: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/18.jpg)
18
CALSAL CR Model Add
![Page 19: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/19.jpg)
19
Email has been set up for all Calibration Standards questions: [email protected]
The acquisition of new calibration standards must be approved by NAVSEA TMDE via [email protected] for the purpose of model standardization and configuration management.
For any questions or concerns pertaining to the CALSAL or Calibration Standards please contact NAVSEA TMDE via [email protected].
![Page 20: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/20.jpg)
20
ENGINEERING INVESTIGATIONSENGINEERING
INVESTIGATIONS
![Page 21: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/21.jpg)
21
Requirement– Perform preliminary analysis of measurement
areas and/or specific areas having known issues
Justification– Existing issues could be resolved with
existing capability and/or modification of current logistics
Resolve issues quickly Cost savings Upfront engineering can be applied to actual
projects
Engineering Investigations (EIs)
![Page 22: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/22.jpg)
22
Engineering Investigations (EIs)
EI Form
Documents:• Problem• Recommendation(s)
EI Report
Contains:• Executive Summary• Background• Findings• Recommendation(s)
EI IndexDATE RECEIVED
LEVEL OF EFFORT STATUS NATURE OF ISSUE
INVESTIGATING ENGINEER WRITE-UP
EFFORT (Hours)
DATE CLOSED
3/31/2008 AH IP Dynamometer Saftey Issues Jeff Trajano N/A
3/6/2008 AH C HAPI Cal Support and Testing Ron Cichy II N/A 3 4/2/2008
9/20/2007 AH OH Cal Support for Frost Point Indicators: MH-15. Ron Cichy II N/A 5
1/10/2008 AH OH Profilometer Tom Kirven N/A
11/13/2008 AH IP Calibration Support for Hull-Pressure indicator replacement Ron Cichy II No 5
10/3/2008 AH C 1127-2 Capability and Magnehic Gage Support Ron Cichy II No 8 10/3/2008
Status:
LOE:
NS: Not Started. IP: In Progress. OH: On Hold. C: Completed
AH: Adhoc Support (< 8 hours). EI: Engineering Investigation (>8 Hours, but <40 Hours). P: Project (>40 Hours)
![Page 23: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/23.jpg)
23
CALIBRATION STANDARDS
ACQUISITION
CALIBRATION STANDARDS
ACQUISITION
![Page 24: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/24.jpg)
24
CAL STDs Requirements
Replenishment– Replace it as it breaks
Modernization– Long-term planning– New TMDE index requirements
ACQ RQMTS = PULL RQMTS + PUSH RQMTS
(Acquisition) (Replenishment) (Modernization)
![Page 25: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/25.jpg)
25
CALIBRATION STANDARDS
REPLENISHMENT
CALIBRATION STANDARDS
REPLENISHMENT
![Page 26: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/26.jpg)
26
CAL STDs Replenishment
Replenishment is implemented by the following:
– Calibration standard is available in the Standards Distribution Warehouse
– The exact model is still procurable from the manufacturer
– Input into the Standards Replenishment Process
![Page 27: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/27.jpg)
27
CAL STDs Replenishment
Need to develop an integrated Standards Replenishment Process:
– Coordinated/Combined use of engineering at Depots for efficiency
– Common process for selecting standards allows sharing of information and prevents duplicate engineering
– Reduction of overall hardware footprint while keeping capability
![Page 28: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/28.jpg)
28
CAL STDs Replenishment
Need to develop a scorecard for the evaluation of candidates to include:
– Functionality
– Supportability
– Procurability
![Page 29: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/29.jpg)
29
CAL STDs Replenishment
Functionality
– Review and compare mfg specifications Less and more capability both have issues
– Is the replacement model a drop in replacement in ICPs?
![Page 30: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/30.jpg)
30
CAL STDs Replenishment
Supportability
– How will the replacement standard be supported?
Organic Local Manufacturer (CONUS)
– Is there a need to procure additional standards to support?
![Page 31: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/31.jpg)
31
CAL STDs Replenishment
Procurability
– Are there active contracts that this can be procured under?
– What are the procurement costs?
– How long will the replacement model be supported by the manufacturer?
![Page 32: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/32.jpg)
32
CALIBRATION STANDARDS
MODERNIZATION
CALIBRATION STANDARDS
MODERNIZATION
![Page 33: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/33.jpg)
33
LIFE-CYCLE SUPPORT MODEL
![Page 34: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/34.jpg)
34
CAL STDs Modernization Process
![Page 35: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/35.jpg)
35
CAL STDs Modernization
Proactive vs. Reactive– Long-term planning– Focus on workload requirements
Reduce CAL STDs Infrastructure– Delete redundant standards– Delete obsolete standards
Reduce Program Costs– Calibration– Maintenance– Procurement
![Page 36: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/36.jpg)
36
Increase Laboratory Capability– Move workload to lowest level
Increase Laboratory Efficiency– Standards with general capabilities
Modernize Calibration Program– Continued process improvement
CAL STDs Modernization
![Page 37: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/37.jpg)
37
Modernization PUSH Requirements
– Subject Matter Experts explore new technology
– Develop high-interest list Calibration laboratories NAVSEA Cal Lab Mgrs input TMDE technical agent input
– Replacement Analysis Program Systematic process for identifying candidates
– Cal Hrs– Repair Hrs– Inventory– Equipment Age
CAL STDs Modernization Process
![Page 38: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/38.jpg)
38
Modernization PULL Requirements
– Workload becomes more accurate ICP issues with 4:1 TAR
– Complex or older methodology CPRs requesting use of newer standards
– Non-procurable standards Calibration standards substitutions requests
CAL STDs Modernization Process
![Page 39: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/39.jpg)
39
CURRENTNAVSEA MODERNIZATIONS
![Page 40: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/40.jpg)
40
Current Modernization EffortsBlackbody
Requirement– Modernize black body standards– Establish traceability– Support IR and AEGIS Thermometers
Justification– Most IR thermometers unsupported
Over 110 different models Over 650 units None listed in TMDE Index
– Blackbody standard issues Limited capability
– Range– Accuracy– Size
Calibration & Traceability issues
Black Body
Standard
![Page 41: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/41.jpg)
41
Requirement– Identify NAVSEA liquid flow workload
requirements– Evaluate use of Exact Flow Model
EF3554-S by NAVSEA Justification
– Current methods used to support liquid flowworkload is outdated
Does not provide accurate measurements depending on use conditions
– New technology will provide increased capability, efficiency, and improve accuracy
Users– Shipyard Depot-level laboratories
Current Modernization EffortsFlowmeter Indicator
FlowmeterIndicator
![Page 42: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/42.jpg)
42
Current Modernization EffortsThread-View Calibration System
Requirement– Identify thread measurement
standard workload– Evaluate the Johnson Thread-View
calibration system– Modernize and deploy Thread-View
Justification– Current thread measurement support is outdated
and inadequate Existing measurement technology is 80+ yrs old
– New technology will provide increased capability and efficiency
Users – Shipyard Depot-level laboratories
Thread-View Calibration
System
![Page 43: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/43.jpg)
43
Current Modernization EffortsHigh Frequency Oscilloscope
Requirement– Evaluate Tektronix DSA8200 Digital Serial
Analyzer Sampling Oscilloscopewith the Tektronix 80E03 Sampling Module
Ensure proper support ofFluke 9530 Active Heads
– Establish organic NAVSEA support Justification
– Existing calibration support for Model9530 is obsolete and no longer procurable
Users– Shipyard Depot-level laboratories
9530 Active Heads
DSA8200
![Page 44: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/44.jpg)
44
Current Modernization EffortsMicrowave Measurement
Receiver
Requirement– Investigate NAVSEA workload requirements– Evaluate Agilent N5531S
Justification– Microwave Standards ~20 years old
technology– 8902A no longer procurable– Failure rates increasing
Users– Shipyard Depot-level laboratories
Agilent N5531S
![Page 45: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/45.jpg)
45
POTENTIAL FUTURE MODERNIZATIONS
![Page 46: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/46.jpg)
46
CAL STD MODERNIZATION “We Have a Plan”
1. Utilize Analytical tools to indicate CAL STD “State of Health”
2. Program Office assessing theses leading indicators to prioritize CAL STD requirements
3. Prioritize Out year CAL STD requirements into Procurement Plan
4. Seek & incorporate input from NAVSEA community
5. Justify to NAVSEA Headquarters
![Page 47: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/47.jpg)
47
Out Year Procurement Plan
w/community input
Repairs
Part/Spares
Service Life
InventoriesProcurable
Other
![Page 48: 1 Cal Standards Review Jeff Anderson NAVSEA 04RM34 (757) 396-0248 x 127 jeffery.r.anderson@navy.mil 5 May 2009.](https://reader035.fdocuments.us/reader035/viewer/2022062309/56649e7a5503460f94b7b45e/html5/thumbnails/48.jpg)
48
QUESTIONS ?