1 1.1 Name of the infrastructure: Navarra CS Technical characteristics 38 MW 1.2 Name of the...

9
1 1.1 Name of the infrastructure: Navarra CS Technical characteristics 38 MW 1.2 Name of the responsible TSO: Enagás S.A 1.3 Additional capacity from existing infrastructure (GWh/day) 1.4 Investment approved by TSO (YES/NO) Yes Spain-France: 0 France-Spain: Max:100 Min: 50(W) / 40 (S) 2.1 Initial Planning 2.2 Updated forecast Starting operation date 2009 May-09 Administrative milestones A) Application Date B) Concession Date 3.1 Initial (promoter choice) Apr-2004 May-2005 3.2 Environmental Assessment Jun-2007 3.3 Final (Authorisation for starting construction) Dec-2006 Nov-2007 Current project advance A) In previous review (%) B) Total (%) 4.1 Engineering 100% 100% 4.2 Procurement 100% 100% 4.3 Construction 100% 100% 4.4 Commissioning 100% 100% 1 2 3 4 5 COMMISSIONED 1. Larrau investments

Transcript of 1 1.1 Name of the infrastructure: Navarra CS Technical characteristics 38 MW 1.2 Name of the...

Page 1: 1 1.1 Name of the infrastructure: Navarra CS Technical characteristics 38 MW 1.2 Name of the responsible TSO: Enag á s S.A 1.3 Additional capacity from.

1

1.1 Name of the infrastructure: Navarra CSTechnical characteristics 38 MW

1.2 Name of the responsible TSO: Enagás S.A1.3 Additional capacity from existing infrastructure (GWh/day)

1.4 Investment approved by TSO (YES/NO) Yes

Spain-France: 0

France-Spain:Max:100

Min: 50(W) / 40 (S)

2.1 Initial Planning 2.2 Updated forecast

Starting operation date 2009 May-09

Administrative milestones A) Application Date B) Concession Date

3.1 Initial (promoter choice) Apr-2004 May-2005

3.2 Environmental Assessment Jun-2007

3.3 Final (Authorisation for starting construction) Dec-2006 Nov-2007

Current project advance A) In previous review (%) B) Total (%)

4.1 Engineering 100% 100%

4.2 Procurement 100% 100%

4.3 Construction 100% 100%

4.4 Commissioning 100% 100%

Causes of delays (if applied)

1

2

3

4

5

COMMISSIONED

1. Larrau investments

Page 2: 1 1.1 Name of the infrastructure: Navarra CS Technical characteristics 38 MW 1.2 Name of the responsible TSO: Enag á s S.A 1.3 Additional capacity from.

2

1.1 Name of the infrastructure: Pipeline Lemona – HaroTechnical characteristics 92 km / 26"

1.2 Name of the responsible TSO: Enagás S.A1.3 Additional capacity from existing infrastructure (GWh/day)

1.4 Investment approved by TSO (YES/NO) Yes

Spain-France: 0

France-Spain:Max:100

Min: 30(W) / 20 (S)

2.1 Initial Planning 2.2 Updated forecast

Starting operation date 2009 Ago-09

Administrative milestones A) Application Date B) Concession Date

3.1 Initial (promoter choice) Mar-2006 Apr-2006

3.2 Environmental Assessment Sep-2007

3.3 Final (Authorisation for starting construction) May-2006 Dec-2007

Current project advance A) In previous review (%) B) Total (%)

4.1 Engineering 100% 100%

4.2 Procurement 100% 100%

4.3 Construction 100% 100%

4.4 Commissioning 100% 100%

Causes of delays (if applied)

1

2

3

4

5

COMMISSIONED

1. Larrau investments

Page 3: 1 1.1 Name of the infrastructure: Navarra CS Technical characteristics 38 MW 1.2 Name of the responsible TSO: Enag á s S.A 1.3 Additional capacity from.

3

1.1 Name of the infrastructure: Reinforcement of Haro CSTechnical characteristics 23 MW

1.2 Name of the responsible TSO: Enagás S.A1.3 Additional capacity from existing infrastructure (GWh/day)

1.4 Investment approved by TSO (YES/NO) Yes

Spain-France: 0

France-Spain:Max:100

Min: 30(W) / 20 (S)

2.1 Initial Planning 2.2 Updated forecast

Starting operation date 2009 Ago-09

Administrative milestones A) Application Date B) Concession Date

3.1 Initial (promoter choice) Mar-2006 Jul-2006

3.2 Environmental Assessment Apr-2007

3.3 Final (Authorisation for starting construction) Sep-2006 Dec-2007

Current project advance A) In previous review (%) B) Total (%)

4.1 Engineering 100% 100%

4.2 Procurement 100% 100%

4.3 Construction 100% 100%

4.4 Commissioning 100% 100%

Causes of delays (if applied)

1

2

3

4

5

COMMISSIONED

1. Larrau investments

Page 4: 1 1.1 Name of the infrastructure: Navarra CS Technical characteristics 38 MW 1.2 Name of the responsible TSO: Enag á s S.A 1.3 Additional capacity from.

4

1.1 Name of the infrastructure: Pipeline Castelnou – Tivisa (loop)Technical characteristics 91 km / 26"

1.2 Name of the responsible TSO: Enagás S.A1.3 Additional capacity from existing infrastructure (GWh/day)

1.4 Investment approved by TSO (YES/NO) YesSpain-France: 30(W) / 50 (S)

France-Spain: 100

2.1 Initial Planning 2.2 Updated forecast

Starting operation date 2009 Sep/Oct-09

Administrative milestones A) Application Date B) Concession Date

3.1 Initial (promoter choice) Mar-2006 Feb-2007

3.2 Environmental Assessment Mar-2007 Apr-2009

3.3 Final (Authorisation for starting construction) Mar-2007 Oct-2009

Current project advance A) In previous review (%) B) Total (%)

4.1 Engineering 100% 100%

4.2 Procurement 100% 100%

4.3 Construction 0% 100%

4.4 Commissioning 0% 100%

Causes of delays (if applied)

1

2

3

4

5

COMMISSIONED

1. Larrau investments

Page 5: 1 1.1 Name of the infrastructure: Navarra CS Technical characteristics 38 MW 1.2 Name of the responsible TSO: Enag á s S.A 1.3 Additional capacity from.

5

1.1 Name of the infrastructure: Villar de Arnedo CSTechnical characteristics 35 MW

1.2 Name of the responsible TSO: Enagás S.A1.3 Additional capacity from existing infrastructure (GWh/day)

1.4 Investment approved by TSO (YES/NO) YesSpain-France: 110(W) / 100 (S)

France-Spain: 100

2.1 Initial Planning 2.2 Updated forecast

Starting operation date 2010 Feb-11

Administrative milestones A) Application Date B) Concession Date

3.1 Initial (promoter choice) Apr-2006 Feb-2008

3.2 Environmental Assessment Nov-2008

3.3 Final (Authorisation for starting construction) Jul-2008 Mar-2010

Current project advance A) In previous review (%) B) Total (%)

4.1 Engineering 81% 100%

4.2 Procurement 61% 100%

4.3 Construction 0% 100%

4.4 Commissioning 0% 100%

Causes of delays (if applied)

1

2

3

4

5

COMMISSIONED

1. Larrau investments

Page 6: 1 1.1 Name of the infrastructure: Navarra CS Technical characteristics 38 MW 1.2 Name of the responsible TSO: Enag á s S.A 1.3 Additional capacity from.

6

1.1 Name of the infrastructure: Pipeline Tivisa – Paterna (loop)Technical characteristics 235 km / 40"

1.2 Name of the responsible TSO: Enagás S.A1.3 Additional capacity from existing infrastructure (GWh/day)

1.4 Investment approved by TSO (YES/NO) YesSpain-France: 30(W) / 50 (S)

France-Spain: 100

2.1 Initial Planning 2.2 Updated forecast

Starting operation date 2009 Nov-2011

Administrative milestones A) Application Date B) Concession Date

3.1 Initial (promoter choice) Mar-2006 May-2007

3.2 Environmental Assessment Jun-2007 Jul-2009

3.3 Final (Authorisation for starting construction) Jun-2007 Jan-2011

Current project advance A) In previous review (%) B) Total (%)

4.1 Engineering 100% 100%

4.2 Procurement 98% 100%

4.3 Construction 69% 100%

4.4 Commissioning 100% 100%

Causes of delays (if applied) The pipeline is divided in 3 tranches (i.e North, Central, South). The 3 tranches are already commissioned

1

2

3

4

5

COMMISSIONED

1. Larrau investments

Page 7: 1 1.1 Name of the infrastructure: Navarra CS Technical characteristics 38 MW 1.2 Name of the responsible TSO: Enag á s S.A 1.3 Additional capacity from.

7

1.1 Name of the infrastructure: Pipeline Zarza de Tajo - YelaTechnical characteristics 106 km / 30"

1.2 Name of the responsible TSO: Enagás S.A1.3 Additional capacity from existing infrastructure (GWh/day)

1.4 Investment approved by TSO (YES/NO) YesSpain-France: 110(W) / 100 (S)

France-Spain: 100

2.1Initial Planning 2.2 Updated forecast

Starting operation date 2010 4Q2013

Administrative milestones A) Application Date B) Concession Date

3.1 Initial (promoter choice) Apr-2006 Dec-2007

3.2 Environmental Assessment Apr-2011 Nov-2011

3.3 Final (Authorisation for starting construction) May-2008 pending

Current project advance A) In previous review (%) B) Total (%)

4.1 Engineering 70% 70%

4.2 Procurement 35% 95%

4.3 Construction 0% 0%

4.4 Commissioning 0% 0%

Causes of delays (if applied) Pending Final Authorisation for starting construction

1

2

3

4

5

1. Larrau investments

Page 8: 1 1.1 Name of the infrastructure: Navarra CS Technical characteristics 38 MW 1.2 Name of the responsible TSO: Enag á s S.A 1.3 Additional capacity from.

8

1.1 Name of the infrastructure: Pipeline Yela – Villar de ArnedoTechnical characteristics 251 km / 30"

1.2 Name of the responsible TSO: Enagás S.A1.3 Additional capacity from existing infrastructure (GWh/day)

1.4 Investment approved by TSO (YES/NO) YesSpain-France: 110(W) / 100 (S)

France-Spain: 100

2.1Initial Planning 2.2 Updated forecast

Starting operation date 2010 Dec-12

Administrative milestones A) Application Date B) Concession Date

3.1 Initial (promoter choice) Apr-2006 Jun-2008

3.2 Environmental Assessment May-2006 Nov-2010

3.3 Final (Authorisation for starting construction) Jul-2008 Dec-2010

Current project advance A) In previous review (%) B) Total (%)

4.1 Engineering 100% 100%

4.2 Procurement 22% 90%

4.3 Construction 0% 63%

4.4 Commissioning 0% 0%

Causes of delays (if applied)

1

2

3

4

5

1. Larrau investments

Page 9: 1 1.1 Name of the infrastructure: Navarra CS Technical characteristics 38 MW 1.2 Name of the responsible TSO: Enag á s S.A 1.3 Additional capacity from.

9

1.1 Name of the infrastructure: CS at the borderTechnical characteristics To be defined

1.2 Name of the responsible TSO: Application made by Enagás S.A for authorisation1.3 Additional capacity from existing infrastructure (GWh/day)

1.4 Investment approved by TSO (YES/NO) YesSpain-France: 60

France-Spain: 0

2.1 Initial Planning 2.2 Updated forecast

Starting operation date 2015 2015

Administrative milestones A) Application Date B) Concession Date

3.1 Initial (promoter choice) Jun-2008

3.2 Environmental Assessment

3.3 Final (Authorisation for starting construction)

Current project advance A) In previous review (%) B) Total (%)

4.1 Engineering 0% 0%

4.2 Procurement 0% 0%

4.3 Construction 0% 0%

4.4 Commissioning 0% 0%

Causes of delays (if applied)

1

2

3

4

5

1. Biriatou investments