    HQ USACE Planning for an Earthquake

    in the New Madrid Seismic Zone

    Rick Howley

    HQUSACE G-3

    8-10 March 2010

  • 8/7/2019 08. FINAL Presenation USACE OPLAN_Rick Howley

    2/14

    BUILDING STRONG2

    Purpose: To provide an update on

    development of the HQ USACE OPLAN for a

    catastrophic earthquake in the New MadridSeismic Zone

    Background: Planning began in March 2009

    4of 5 USACE Divisions had draft plans, developedHQ USACE plan from bottom up

    MAEC Report provided damage estimates perimpacted state

    Provided Mission Analysis, and follow on OPLANbrief to DCG-CW in June 2009

    Received FEMA draft OPLAN in August 2009,updated specified and implied tasks

    Clarified lead and supporting USG agencies for TF Riverine

  • 8/7/2019 08. FINAL Presenation USACE OPLAN_Rick Howley

    3/14

  • 8/7/2019 08. FINAL Presenation USACE OPLAN_Rick Howley

    4/14

    BUILDING STRONG4

    Specified/Implied Tasks

    Specified Tasks

    Support to FEMA under the NRF Repair and maintain flood control

    infrastructure under PL 84-99

    Continue on-going operating andconstruction projects

    Support TF Riverine

    Support ARNORTH/NORTHCOMJTFs with Engineer staff cells

    Implied Tasks

    Account for personnel in impactedareas

    Execute COOP for impacted USACEactivities

    Reestablish COMMS

    Coordinate access to impacted areaswith law enforcement agencies

    Support initial reconnaissance effortsto develop the common operatingpicture

    Deploy and establish C2 elements

    Assess and conduct immediate repairof USACE infrastructure

    Provide visible leadership to the

    citizens Support DoD efforts to restore

    Defense Critical Infrastructure

  • 8/7/2019 08. FINAL Presenation USACE OPLAN_Rick Howley

    5/14

  • 8/7/2019 08. FINAL Presenation USACE OPLAN_Rick Howley

    6/14

    BUILDING STRONG6

    Commanders IntentPurpose: Fully support local, state and federal efforts in order to save lives, provide services to citizens relateto public works, and re-establish infrastructure to support long-term economic recovery in the event of a

    catastrophic earthquake in the NMSZ.Key Tasks:- Conduct initial reconnaissance to support DHS/FEMA efforts to determine the scope of the impacted area

    - Conduct engineer reconnaissance of critical infrastructure and provide assessments to facilitate repair

    - Restore flood protection infrastructure

    - Restore Civil Work and navigation infrastructure

    - Support restoration of navigable waterways through the Riverine Task Force

    - Execute public works missions as directed by FEMA under ESF#3 and support to other Federal agencies

    under the NRF- Reconstitute Planning and Response Teams (PRT) as they deploy in anticipation of a response phase that is

    longer than typical emergency response

    - Ramp up training at the Readiness Support Center (RSC) in order to support training of additional PRTs,

    ESF#3 Team Leaders (TLs) and Assistant Team Leaders (ATLs)

    -Provide NORTHCOM/ARNORTH Joint Task Forces with initial task force engineering staff

    End state:- Immediate threats to life and safety for the earthquake and its aftermath have been removed

    - Basic services of physical and social infrastructure have been restored to a functional level

    - Damaged Civil Works infrastructure is restored to its authorized operational condition

    - Infrastructure is repaired to enable economic recovery

  • 8/7/2019 08. FINAL Presenation USACE OPLAN_Rick Howley

    7/14

    BUILDING STRONG7

    Areas of USACE Support

    Support to FEMA under the National Response

    Framework, USACE Main Effort is to Tennessee

    Support to USACE Civil Works Projects Will Be Within

    Current Civil-Works Boundaries, USACE Main Effort is to

    CW infrastructure on the Mississippi and Ohio Rivers

    Support TF Riverine, a USG interagency TF led by the US

    Coast Guard, in order to restore navigable waterways

    Provide initial JTF engineer augmentation to NORTHCOM

    JTFs

    Provide support to others (DA IMCOM, other federal

    agencies) as requested

    USACE Concept of Operations

  • 8/7/2019 08. FINAL Presenation USACE OPLAN_Rick Howley

    8/14

    BUILDING STRONG8

    USACE Support to FEMA

    LRD support to

    Tennessee isthe USACE

    Main Effort for

    support to

    FEMA.

    SPD and SAD are designated the supporting

    divisions to LRD

  • 8/7/2019 08. FINAL Presenation USACE OPLAN_Rick Howley

    9/14

    BUILDING STRONG9

    Description

    X - Few structures

    surviveIX - Heavy damage to

    most structures

    VIII - Major damage

    to ordinary

    structures

    VII - Slight to

    Moderate damage to

    ordinary structures

    VI - Slight damage

    X

    VI

    IX

    VIII VII

    MVDs efforts to restore

    flood control and civil

    works infrastructure along

    the Mississippi River is

    the Main Effort for Corps

    work within our own

    authorities. NAD is designated the supporting division to MVD

    or n s wn

    Authorities

    LRDs efforts to restoreflood control and civil

    works infrastructure along

    the Ohio River is the

    Main Effort for Corps

    work within our own

    authorities.

    SAD and SPD are the

    supporting divisions to LRD

  • 8/7/2019 08. FINAL Presenation USACE OPLAN_Rick Howley

    10/14

    BUILDING STRONG10

    Support to TF Riverine

    TF Riverine

    X

    Interagency TF

    TF Riverine

    Mission: Restore

    navigation on the

    Mississippi River.

    TF Riverine will be

    an Interagency

    Task Force

    composed of the

    Coast Guard, DOT,

    USACE, other

    federal agencies,

    and state and localgoverning bodies.TF Riverine operations:

    Hazardous Materials

    Debris clearance

    Bridging

    Ferrying

    Opening Ports

    Navigation

  • 8/7/2019 08. FINAL Presenation USACE OPLAN_Rick Howley

    11/14

    BUILDING STRONG11

    Support to ARNORTH/NORTHCOM JTFS

    MCPXXX

    ARNORTH

    FWDJTF CS

    XX

    JTF 1

    XX

    USACE will support

    ARNORTH/NORTHCOMJTFs with engineer staff

    augmentation cells:

    NWD supports the MCP

    LRD supports JTF CS

    POD supports a third

    JTF that is established.

  • 8/7/2019 08. FINAL Presenation USACE OPLAN_Rick Howley

    12/14

    BUILDING STRONG12

    Command and Control

    The USACE TF Commander will initially

    deploy to Jackson, TN and co-locate with the

    LRD forward command post to provide

    national level command and control.

    The USACE Director of Contingency

    Operations will operate from HQ USACE to

    facilitate national level coordination withDHS/FEMA.

  • 8/7/2019 08. FINAL Presenation USACE OPLAN_Rick Howley

    13/14

    BUILDING STRONG13

    Concerns

    Trigger to move in the event there is no

    communications

    Expeditionary communications capabilities

    in the impacted area Adjudication of resources, how resources