Duplex Filter RemovalFor Lube Oil Flush.

Engine 6

Page 4: 02 12 09 Site Progress

Duplex Filter Removal & Inspection. Engine 6

02-06-09

Page 5: 02 12 09 Site Progress

Crank Web Deflection/Engine 6 02-06-09

Page 6: 02 12 09 Site Progress

Engine Alignment/Engine 6 02-09-09

Page 7: 02 12 09 Site Progress

Alignment/Engine 6

Page 8: 02 12 09 Site Progress

Alternator Alignment/Engine 6

Page 9: 02 12 09 Site Progress

Alternator Alignment/Engine 6

Page 10: 02 12 09 Site Progress

Alternator Alignment/Engine 6

Page 11: 02 12 09 Site Progress

Lube Oil Flush ConnectionEngine 6

Page 12: 02 12 09 Site Progress

Power Block ABuilding Erection

Page 13: 02 12 09 Site Progress

Sub Transformer

Page 14: 02 12 09 Site Progress

Station Transformer A

Page 15: 02 12 09 Site Progress

Neutral Grounding Resistor

Page 16: 02 12 09 Site Progress

Station Transformer AMedium Line Termination

Page 17: 02 12 09 Site Progress

Power Block A

Page 18: 02 12 09 Site Progress

Power Block A Radiator Cooling Water Piping Fabrication

Page 19: 02 12 09 Site Progress

HT/LT Cooling Water Piping

Page 20: 02 12 09 Site Progress

Inside Block A

Page 21: 02 12 09 Site Progress

Power Block AEngine 6 Side

Page 22: 02 12 09 Site Progress

Engine 6 IntakeExhaust

Page 23: 02 12 09 Site Progress

Power Block A

Page 24: 02 12 09 Site Progress

Overall Site 02-11-09

Page 25: 02 12 09 Site Progress

Sub Station 02-11-09

Page 26: 02 12 09 Site Progress

Tank Farm Fabrication Shop 02-11-09

Page 27: 02 12 09 Site Progress

Paint Shops & Steel Lay Down Yard 02-11-09

Page 28: 02 12 09 Site Progress

West Side of Power Block A 02-11-09

Page 29: 02 12 09 Site Progress

Security Headquarters 02-11-09

Page 30: 02 12 09 Site Progress

Road Detour To Keep Civilian Traffic Away FromFront Entrance To Site. 02-11-09

Page 31: 02 12 09 Site Progress
Page 32: 02 12 09 Site Progress

Power Block B ExhaustStack Foundations 02-12-09

Page 33: 02 12 09 Site Progress

Covering for Sub Base Pourof Thermal Boilers. 02-12-09

Page 34: 02 12 09 Site Progress

West Wall Construction forPower Block C 02-12-09

Page 35: 02 12 09 Site Progress

North Wall ConstructionPower Block C 02-12-09

Page 36: 02 12 09 Site Progress

Shelter Being Erected for the 5th Engine FoundationPour for Power Block C. 02-12-09

Page 37: 02 12 09 Site Progress

Afghan Water Truck 02-12-09

Page 38: 02 12 09 Site Progress

Tower Erection 02-08-09

Page 39: 02 12 09 Site Progress

Tower Erection 02-01-09

Page 40: 02 12 09 Site Progress

Tower Erection 02-02-09

Page 41: 02 12 09 Site Progress

Material Air DropAt 100MW Site

Page 42: 02 12 09 Site Progress

Aborted Air Drop Due To Ground Conditions

Page 43: 02 12 09 Site Progress

Golf In Kabul For The Adventurous Type

Page 44: 02 12 09 Site Progress

Local Fruit Stand

Page 45: 02 12 09 Site Progress

Local Village NearSite

Page 46: 02 12 09 Site Progress

Local Vegetable Shop

Page 47: 02 12 09 Site Progress

Local School HouseNear The Site

Page 48: 02 12 09 Site Progress

Local Transport Plenty Of Room

Page 49: 02 12 09 Site Progress

WOW