01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51...

55
Progress Energy – NRC Meeting Levy Nuclear Plant Geotechnical Review 01-10-08

Transcript of 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51...

Page 1: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Progress Energy – NRC MeetingLevy Nuclear Plant

Geotechnical Review

01-10-08

Page 2: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Meeting Objectives

Introduce Levy site and project timeline

Review foundation conditions at Levy

Review foundation concepts under consideration

2

Page 3: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Site Location

Levy County

3

Page 4: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Levy County Nuclear Plant

4

Page 5: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

5

Page 6: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Levy Nuclear Plant Project Schedule

NRC COL Application July 2008

Limited Work Authorization (LWA) May 2010

NRC COL Issued 1st Quarter 2012

Plant On-line 2016

6

Page 7: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Regional Physiographic Map

7

Page 8: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Regional Geology

8

Page 9: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Boring Layout

9

Page 10: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Summary of Field Investigations

10

Boring Program (SPT & Coring)51 borings under Safety Related structures65 additional borings for site characterization/Non-Safety Related structuresDepths - 45 feet to 500 feet

Seismic Geophysical Testing (to 500 ft)DownholeSuspension logging

Acoustic Televiewer and Caliper SurveysPerformed in open mud-rotary holes where P-S logging was performed

Geophysical LoggingNatural gamma, gamma-gamma, neutron-neutron, and induction

Pressuremeter TestingLaboratory Testing Program

Page 11: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

North Plant Profile Locations

11

Page 12: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

North Plant Preliminary North-South Profile

12

Page 13: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

North Plant Preliminary East-West Profile

13

Page 14: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

South Plant Profile Locations

14

Page 15: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

South Plant Preliminary North-South Profile

15

Page 16: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

South Plant Preliminary East-West Profile

16

Page 17: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Summary of Engineering Parameters for Soil and Rock

17

Preliminary Mean Soil/Rock Parameters of North Reactor LNP‐2

Layer Type

Mean Unconfined Compressive Strength (psi)

Typical Shear Wave Velocity 

(ft/sec)S‐1 Soil ‐ 2,000S‐2 Soil ‐ 2,200S‐3 Soil ‐ 3,000

NAV‐1 Rock 2,573 3,500NAV‐2 Rock 3,200 4,800NAV‐3 Rock 1,046 3,000

Preliminary Mean Soil/Rock Parameters of South Reactor LNP‐1

Layer Type

Mean Unconfined Compressive Strength (psi)

Typical Shear Wave Velocity 

(ft/sec)S‐1 Soil ‐ 2,000S‐2 Soil ‐ 2,200S‐3 Soil ‐ 2,800

SAV‐1 Rock 3,978 3,500SAV‐2 Rock 1,046 2,500

Page 18: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

LNP Foundation Concept I

EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE

EL -24 GEOLOGIC UNCONFORMITY

CEMENTITIOUS FILL

fc’ > 500 psiVs > 1000 ft/sec

RCCfc’ = 2,300 psiVs ≥ 3,500 ft/sec

ROLLER COMPACTED CONCRETEBRIDGING MAT

AVON PARK(MIDDLE EOCENE LIMESTONE AND

DOLOSTONE)UCS ≈ 1,000‐4,000 psi; Vs ≈ 3,000‐4,500 ft/sec

REINFORCED DIAPHRAGM WALL (NON-SAFETY)

18

ANGLED GROUT HOLES

Page 19: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

LNP Foundation Concept II

EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE

EL -24 GEOLOGIC UNCONFORMITY

CEMENTITIOUS FILL

fc’ 500 psiVs > 1000 ft/sec

RCCfc’= 2,300 psiVs ≥ 3,500 ft/sec

AVON PARK(MIDDLE EOCENE LIMESTONE AND

DOLOSTONE)UCS ≈ 1,000‐4,000 psi; Vs ≈ 3,000‐4,500 ft/sec

ROLLER COMPACTED CONCRETEBRIDGING MAT

CUTOFF WALL (NON-SAFETY)

19

ANGLED GROUT HOLES

Page 20: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Line 1 – AP1000 Basemat

Line 2 – 35-foot thick RCC Bridging Mat

Line 3 – 75-foot thick Grouted Zone

Line 4 – Long-Term Monitoring Program

LNP Foundation Concepts – A “Defense in Depth with Multiple Lines” Approach

20

Page 21: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

LNP Foundation Concepts

RCC Bridging Mat: ~35-ft thick RCC MatBasic Function

Bridge over postulated solution-induced irregularities in the Avon Park that may develop in the futureProvide a “bedrock” foundation for the AP1000 BasematA Safety Related feature

Basic Propertiesfc’ > 2,300 psiVs > 3,500 fps

21

Page 22: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

LNP Foundation Concepts

Approximately 75-foot thick Grouted Zone (upper Avon Park)

Basic FunctionsProvide a “bottom for the bathtub”Prevents future solution activity by inhibiting the flow of water through porous zones and fracturesNot a Safety Related feature

Basic PropertiesUCS ≈ 2,500 psiVs ≈ 3,000-4,500 ft/sec

22

Page 23: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

LNP Foundation Concept

Mid-Eocene Avon Park is the founding mediaBasic Function

Support the overlying RCC Bridging MatLocation of the FIRS

Basic PropertiesUCS ≈ 2,500 psiVs ≈ 3,500 ft/sec

23

Page 24: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Planned Excavation Bottom

2424

Approximate El. -24 feetErosion Surface

Undifferentiated Quaternary Sediments

Avon Park (Eocene)

Page 25: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

LNP Foundation Media

…the Avon Park Formation is cream to light brown or tan, poorly indurated to well-indurated, variably fossiliferous, limestone (grainstone, packstone, and wackstone, with rare mudstone)……the uppermost part of the Avon Park Formation…varies between limestone and dolostone…dolostone predominates deeper within the unit…

25

Page 26: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Solution Activity Risk Map

2626

Page 27: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Solution Activity Potential

2727

Page 28: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Recharge and Discharge Areas

2828

Page 29: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Approach – Potential Solution Activity under Grouted Zone (~150 feet below grade)

Assess probability and volume of potential solution activity

Literature ReviewSite-specific data review

Rod drops, drill fluid lossesCore recovery, RQD’s acoustic televiewer and caliper surveys

Using Statistics of data, estimate volume, frequency and depths of potential solution activityShow that Foundation Concepts will “bridge” over potential solution activity without distress to AP1000 Basemat

2929

Page 30: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

LNP Foundation Concepts

Long-term Monitoring Program ConsiderationsRate of Solution ActivityChanges in Porosity / Permeability of the Grouted ZoneChanges in Groundwater QualitySettlement of the RCC Bridging MatSettlement of the AP1000 Basemat

30

Page 31: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Other Planned Activities

Test PadsRCC Placement/PropertiesFlowable Fill Placement/Properties

Field TestingGrout Program

AnalysesAssessment of Potential Deep Solution ActivitySoil-Structure Interaction

31

Page 32: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Concept I - Plan

32

Page 33: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Concept I - Section

33

Page 34: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Concept II - Plan

34

Page 35: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Concept II - Section

35

Page 36: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

LNP Foundation Construction Sequence

Stage 1Construct Groundwater Cutoff for the “walls of the bathtub”Conduct Grouting Program to form the “bottom of the bathtub”Install the Shallow wells to “drain the bathtub”Install the Deep wells to relieve the uplift pressure

36

Page 37: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Cutoff Wall Construction

37

Page 38: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Secant Pile Cutoff Wall Construction

38

Page 39: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Cutoff Wall Sequence for Secant Piles

39

Page 40: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Grouting Program

Step ADrill & Grout with Low Mobility Grout (LMG)

Depth 75 ft (approximate)Spacing 8 ft (subject to confirmation)Concentric Pattern starting on perimeter and working inward toward centerComputerized monitoring of pressures and takes

40

Page 41: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Grouting Program(Cont’d)

Step BDrill & Grout with High Mobility Grout (HMG)Depth 75 ft (approximate)Split spacing with LMG HolesComputerized monitoring of pressures and takes

41

Page 42: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

LNP Foundation Construction Sequence

Stage 2Excavate the soil in the “bathtub” down to the Avon ParkPrepare the top of the Avon Park

Remove soil pockets and soil-filled fractures & replace with dental concreteClean & remove surface to receive RCC

42

Page 43: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

LNP Foundation Construction Sequence

Stage 3Construct the RCC Bridging Mat

Stage 4Install the Waterproofing on the RCC Bridging MatConstruct the Upper half of mudmat to protect the membraneConstruct the AP1000 BasematBackfill as Required

43

Page 44: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

What is RCC?(Stage 3)

RCC = Roller Compacted ConcreteDeveloped in the 1970sPlaced with Earth-Moving EquipmentStrength Same as Conventional Concrete

Same Basic Ingredients (increased fly ash)Extensive Pre-Construction TestingLower Heat of Hydration

Suitable for Site Conditions at LNP

44

Page 45: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Example RCC Projects

Saluda Dam (SCE&G) [ASCE OPAL Award, 2006]

Taum Sauk Dam (AmerenUE)Olivenhain Dam (SDCWA)San Vicente Dam Raise (SDCWA)Bear Creek Dam (TVA)Bellefonte NPP (TVA)

45

Page 46: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

RCC Placement by Truck

46

Page 47: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

RCC Placement by Conveyor

47

Page 48: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

RCC Placement by Conveyor

48

Page 49: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

RCC Placement by Conveyor

49

Page 50: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Spreading RCC with Dozer

50

Page 51: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Compacting RCC

51

Page 52: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Typical RCC Test Pad

52

Page 53: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Typical RCC Sample Cutting

53

Page 54: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Typical RCC Sample from Test Pad

54

Page 55: 01/10/2008 Meeting Handout 'Progress Energy Levy Nuclear ... · LNP Foundation Concept I EL 51 PROPOSED PLANT GRADEEL 42 EXISTING GRADE ... LNP Foundation Media z…the Avon Park

Summary Comments

55