© 2014 HDR, Inc., all rights reserved. COUNCIL BLUFFS INTERSTATE SYSTEM MODEL Jon Markt Source:...
-
Upload
loreen-quinn -
Category
Documents
-
view
218 -
download
1
Transcript of © 2014 HDR, Inc., all rights reserved. COUNCIL BLUFFS INTERSTATE SYSTEM MODEL Jon Markt Source:...
© 2014 HDR, Inc., all rights reserved.
Picture or Color BlockPicture or Color Block
Picture or Color Block
COUNCIL BLUFFS INTERSTATE SYSTEM MODEL
Jon Markt
Picture or Color Block
Source: FHWA
Picture or Color Block
Picture or Color Block
Picture or Color Block
CBIS Project Overviewo Project challengeso Project solutions
CBIS Modelo Applications
• Construction Phasing• Construction Alternatives• Traffic Impacts / User Costs
o Innovations• Large Sub-area Microsimulation• Dynamic Traffic Assignment• Perpetually refined
PREVIEW
Picture or Color Block
By the numberso 18 - miles of interstate system reconstructedo 32 – number of bridges reconstructedo 5 – number of lanes on existing I-80 / I-29o 12 – number of lanes on future I-80 / I-29o 50+ - number of years since the original
construction of the CBISo 130,000 – projected 2030 daily traffic volume
on I-80 / I-29
CBIS PROGRAM
Picture or Color Block
Picture or Color Block
Picture or Color Block
o Traffic simulation model of Council Bluffso Applications
• Construction Phasing Analysis• Construction Alternatives Analysis• Traffic Impacts / User Cost
o Innovative Features• Dynamic Traffic Assignment• Large Sub-area Microsimulation• Perpetually refined
CBIS MODEL
Picture or Color Block
o Goal: Reduce overall program costso Strategy: Accelerate Constructiono Baseline Schedule
• Final work in fiscal year 2023• Cumulative construction cost: $734 million
o Accelerate Schedule• Final work in fiscal year 2020• Cumulative construction cost: $706 million
o User benefits of accelerated schedule?o User cost of concurrent work zones?
CONSTRUCTION PHASING
Daily Vehicle Miles Traveled (VMT) Daily Vehicle Hours Traveled (VHT) Primary road user costs for economic evaluation
USER COST
Picture or Color Block
Base 2 Lane US 275 NB OffRamp Closure
NB OnRamp Closure
SB On and Off Closure
9,850,000
9,855,000
9,860,000
9,865,000
9,870,000
9,875,000
Base 2 Lane US 275 NB OffRamp Closure
NB OnRamp Closure
SB On and Off Closure
234,000
234,500
235,000
235,500
236,000
236,500
237,000
Picture or Color Block
Limited to particular strategies
Small models, suited for localized impacts
Projects evaluated in isolation
WORK ZONE ANALYSIS
Source: Oregon DOT
Source: FHWA
o Large Sub-area Microsimulation• Addresses network impacts• Inclusion of boundary effects• Couples with DTA to show spatial
impacts of congestion on traffic flow and user costs
CBIS MODEL
o Dynamic Traffic Assignment (DTA)• Time-sensitive routing tool• Greater sensitivity to congestion than traditional assignment methods (permits queuing)
CBIS MODEL
Picture or Color Block
IDENTIFYING IMPACTS Union Pacific Railroad Bridge
Reconstructiono Single lane vs. full closureso Ramp closureso Extent of impacts?
Picture or Color Block
Picture or Color Block
Picture or Color Block
Dual calibration – before & “after” constructiono Before
• AirSage origin-destination data• INRIX speed data
o After• Iowa DOT sensor data and video• INRIX speed data
Sub-area refinement and analysiso Refined input values incorporated in the
regional model
PERPETUALLY REFINED
Picture or Color Block
Picture or Color Block
Picture or Color Block
Key insightso DTA and larger microsimulation networks
address gaps in traffic analysis and are becoming more practical for day-to-day use
o Model calibration is changing due to innovative new forms of data, better data collection infrastructure, advances in traffic models
o Model as an asset, rather than single use
CBIS INNOVATIONS