Zero Energy Buildings - American Council for an Energy ... · ZERO ENERGY PERFORMANCE TARGET...

Post on 19-Oct-2020

1 views 0 download

Transcript of Zero Energy Buildings - American Council for an Energy ... · ZERO ENERGY PERFORMANCE TARGET...

Accelerate PerformanceScaling the Outcome-Based Procurement Approach

Ben Heymer, PEApril 3, 2017

2

FUTURE PROOF

ZERO ENERGY

PERFORMANCE TARGET

“SUSTAINABLE”OR CERTIFIED

CODE-COMPLAINT

ALL NEW BUILDINGS

4

Corporate Average Fuel Economy (CAFE) Standards

195210 mpg

198121 mpg

6

Energy Codes

7

Buildings Lag Automotive By 30 Years

Buildings(ASHRAE Std. 90)

8

Chicago Benchmarking Data

9

“The greatest opportunity to identify and influence deep savings is pre-schematic design, where the program supports quick early simulations and EUI targeting.”–ACEEE New Horizons for Energy Efficiency: Major Opportunities to Reach Higher Electricity Savings by

2030; Dan York, Steven Nadel, Ethan Rogers, Rachel Cluett, Sameer Kwatra, Harvey Sachs, Jennifer

Amann, and Meegan Kelly; September 2015.

3 year Department of Energy initiative

to scale performance-based procurement

TEAM

Seventhwave

National Renewable Energy Laboratory

Institute for Sustainable Energy

UTILITY PARTNERS

ComEd

Eversource

United Illuminating

Xcel Energy

OWNER PARTNERS

University of Chicago

PARTNERS

Center for Sustainable Building Research Photos courtesy of University of Chicago

New Construction Program Benchmarking

Motivators

• Develop an industry leading program

• Premium customer service

• Support projects with aggressive goals

• Meet increasing savings goals despite advancing codes

• Prepare for outcome-based codes (and pay for performance)

OWNERS UTILITIES

• Have campus/portfolio carbon goals

• Disappointed with new buildings

• Understand investment opportunity, need to manage risk

• Want zero energy, need a process

• Keep design and contractor team focused on measurable goals

$0.14/kWh

PROJECT DELIVERY

Before Design Contract

Equipment Purchased

$0.10/kWh

Before50% DD

$0.07/kWh

6 WeeksTo Equipment

Comprehensive

Accelerate Performance

Expedited Assistance

Too Latefor Incentives

PROJECT DELIVERY

INC

ENTI

VE

$ /

kW

h

ComEd New Construction Incentives

Review Design Team Submissions

Review M&VData

EarlyOutreachOwner &

DeveloperFocus

BenchmarkingConcept Modeling

RFPContracts

PayIncentive

Model vs. Code Baseline

16

17

0.00 0.05 0.10 0.15 0.20 0.25

Lighting

Plug Loads

Cooling Efficiency

Daylight Harvesting

Glass U-Value

Glass Area

Glass SHGC

HVAC Controls

Infiltration

Exterior Shading

Heating Efficiency

Wall Insulation

Hot Water Efficiency

Exterior Lighting

Roof Insulation

Demand Ventilation Controls

Energy Cost Savings (∆$/ft2∙yr)

18

19

20

21

U n i v e r s i t y o f C h i c a g o

New hospital$600 millionEnergy Star Score: 19

Energy Retrofits to Historic Buildings

22

EUI Target

75 kBtu/gsf∙yr (site)

23

Campus North Residence Hall

24

25

Image used with permission of Structured Development

Big DeahlMixed Use Development

EUI Target

36 kBtu/gsf∙yr (site)

Thank youBen Heymer, PEbheymer@seventhwave.org

608.210.7187

www.seventhwave.org/accelerateperformance