Willard Bay Diesel Spill

Post on 24-Feb-2016

72 views 0 download

Tags:

description

Willard Bay Diesel Spill. Curtis Kimbel Joyel Dhieux US EPA Region 8 Emergency Response Program . To Report a Spill. Call the National Response Center (NRC) at 1-800-424-8802 One-stop call center for assistance and spill reporting . Willard Bay Diesel Spill. Willard Bay Diesel Spill. - PowerPoint PPT Presentation

Transcript of Willard Bay Diesel Spill

Willard BayDiesel Spill

Curtis KimbelJoyel Dhieux

US EPA Region 8Emergency Response Program

2

To Report a Spill

Call the National Response Center (NRC) at

1-800-424-8802 – One-stop call center for assistance and spill

reporting

Willard Bay Diesel Spill

3

Willard Bay Diesel Spill

4

Metro Waste Water Plant

Suncor Refinery

Seep

Spill occurred March 18, 2013 at 8:45 PM

74” split in an 8 inch diesel pipeline

A “significant amount of diesel” was reported to be spilled – 485 bbls (20,370 gals)

Willard Bay Diesel Spill

5

Metro Waste Water Plant

Suncor Refinery

Seep

Diesel accumulated in a wetland area created by a series of beaver dams

OSC, STARTS and EPA PIO arrived on scene morning of March 19 2013

Countermeasures implemented immediately and formal Unified Command established– Press conference 3:00 PM March 19th

Willard Bay Diesel Spill

6

Willard Bay Diesel Spill

7

Metro Waste Water Plant

Suncor Refinery

Seep

Unified Command initially met 9:30 AM and 5:30 PM each day

Incident Commander (Chevron)– International Spill Response Team and contractors

EPA – DOI, Bureau of Rec, US Fish and Wildlife

UDEQ Drinking Water Division– DNR, State Parks

Willard Bay Diesel Spill

8

Metro Waste Water Plant

Suncor Refinery

Seep

Approximately 130 personnel on site – Working 24/7

EPA coordinated Pollution Removal Funding Authorizations (PRFAs)– Bureau of Reclamation– US Fish and Wildlife Service

All inclusive, formal Unified Command worked very well – Lessoned learned from Red Butte Creek 1 and 2

Willard Bay Diesel Spill

9

Willard Bay Diesel Spill

10

Willard Bay Diesel Spill

11

Willard Bay Diesel Spill

12

Willard Bay Diesel Spill

13

Willard Bay Diesel Spill

14

Willard Bay Diesel Spill

15

Willard Bay Diesel Spill

16

Willard Bay Diesel Spill

17

The 6 Beavers were the stars

Scheduled to be released mid May

Willard Bay Diesel Spill

18

Incredible attention to detail:Frog Loggers

Game CamerasOver-the-top Safety Briefs

Willard Bay Diesel Spill

19

As of 30 April 2013:

– Estimated 482 bbls recovered, 3 bbls remaining

– Water control strategy approved by Unified Command, material ordered and prep work started

– Seed mix approved and ordered

Willard Bay Diesel Spill

20

As of 30 April 2013 (cont.):

– Groundwater and surface water sampling to continue (State lead)

– Emergency Response phase estimated to end mid-late summer 2013

– Area to remain closed to public until State completes risk assessment (3 months)

Willard Bay Diesel Spill

21

A Special Thank You to:

– Joyel

– Matthew Allen (EPA PIO)

– John Whitehead and Emily Bartusek UDEQ Division of Water Quality

22

To Report a Spill

Call the National Response Center (NRC) at

1-800-424-8802 – One-stop call center for assistance and spill

reporting.

Questions?