PROJECT:

CSR Autoclave VESSELS TAG NO:

TBA

CLIENT:

CSR HEBEL

L&A DOCUMENT No: LAP-3691-WD

CLIENT DOC. No:

15/12/17 B 2 off SAW Procedures added, issued for approval SC ES 21/11/17 A Issued for Review & Comment SC ES Issued Rev Description By Reviewed

LAP-3691-WD Revision Record

Welding Documentation Package Notes

Summary of Submitted Package The attached Weld Procedure Specifications (WPS) and Procedure Qualification Records (PQR) have been selected based on details provided in project specifications & requirements of AS-1210 and AS/NZS 3992-2015 for welding of pressure equipment. The following table itemises the procedures included in this Welding Documentation Package

Table of Contents

WPS’S INCLUDED IN WELDING PACKAGE

L&A Document # Description L&A

Revision

Tracking

Date

036-2 GTAW/GMAW

Or GMAW 0 21/11/17

160-1 SAW 0 15/12/17

078-2 SAW - Alternative 0 15/12/17

PQR’S INCLUDED IN WELDING PACKAGE

L&A Document # Description Status Revision Date

036 Butt Welds / Fillet Welds For review 0 21/11/17

160 Butt Welds For review 0 15/12/17

078 But Welds For review 0 15/12/17