WELDING DOCUMENTATION PACKAGE CSR Autoclave...L&A PRESSURE WELDING WELDING DOCUMENTATION PACKAGE...
Transcript of WELDING DOCUMENTATION PACKAGE CSR Autoclave...L&A PRESSURE WELDING WELDING DOCUMENTATION PACKAGE...
L&A PRESSURE WELDING
WELDING DOCUMENTATION PACKAGE
PROJECT:
CSR Autoclave VESSELS TAG NO:
TBA
CLIENT:
CSR HEBEL
L&A DOCUMENT No: LAP-3691-WD
CLIENT DOC. No:
15/12/17 B 2 off SAW Procedures added, issued for approval SC ES 21/11/17 A Issued for Review & Comment SC ES Issued Rev Description By Reviewed
LAP-3691-WD Revision Record
Welding Documentation Package Notes
Summary of Submitted Package The attached Weld Procedure Specifications (WPS) and Procedure Qualification Records (PQR) have been selected based on details provided in project specifications & requirements of AS-1210 and AS/NZS 3992-2015 for welding of pressure equipment. The following table itemises the procedures included in this Welding Documentation Package
Table of Contents
WPS’S INCLUDED IN WELDING PACKAGE
L&A Document # Description L&A
Revision
Tracking
Date
036-2 GTAW/GMAW
Or GMAW 0 21/11/17
160-1 SAW 0 15/12/17
078-2 SAW - Alternative 0 15/12/17
PQR’S INCLUDED IN WELDING PACKAGE
L&A Document # Description Status Revision Date
036 Butt Welds / Fillet Welds For review 0 21/11/17
160 Butt Welds For review 0 15/12/17
078 But Welds For review 0 15/12/17