The Windsor Siding Masterplan [DRAFT]The key features of this master plan
Legend
The design principlesImproved access & sight-linesEstablish a main connection through the siteProvide secondary connections to both Henry and Union StreetsProvide inviting gateway entrances that are legible and navigable
Functional spaces with minimal conflictEstablish a Central Hub that overlooks all spacesDefine activity spaces that cater for the different user groups
A safe place to enjoyIncreased lighting to improve safety at nightRemoval of low lying vegetation to improve sightlinesAdditional passive surveillance from increased activity
Ecological retention and improvementIncreased canopy cover and the retention of existing trees Removal shrub vegetation to establish a landscape character
Proposed primary entrances
Proposed secondary entrances
Primary connection
Secondary connections
Central Hub
Activity Hubs
A masterplan with seamless connectionsThe masterplan will improve the primary connection to and from Windsor Station on main path which is wide, well lit and accessible. Secondary connections will provide unrestricted access based on pedestrian desire lines.
A masterplan with legible entrancesThe masterplan has identified two primary entrances and two secondary entrances to Windsor Siding. These will be visually open to improve legibility and sight-lines to and from the site. Their positioning will provide improved wayfinding via signage and identification.
A masterplan with improved functionalityThe masterplan has used the pedestrian desire lines and access points to determine the definition of spaces in Windsor Siding. Through the programming of activities and use of underutlised space the masterplan achieves more functional spaces with fewer conflicts of use.
note: the following images used are reference images only. Further concept development work will determine the final look of each space.
Central Hub
Primary Movement Axis
Eastern Precinct
Southern Precinct
Western Precinct
Northern Precinct
Station Interface
union stunion st
peel st
henry st
01
A
B
C
D
04
03
07
05
06
02
01
02
03
04
05
06
07
union st
peel st
stonnington childrens centre
will sampson
hall
henry st
jubi
lee s
t
Shelter Plaza forecourt Garden Bed
Lawn Sculptural play Existing Trees
Gravel Carpark / drop-off zone
Proposed Trees
Play Area Entry Plaza
Toilet facility
Amphitheatre seating
Avenue Trees
Picnic Facilities
Hard surface paving
Play Area / Multi-use zone
Multi-use zone
0 10 20 30 50 70m
1:800 @ A3
For more information on this project go to: www.stonnington.vic.gov.au/windsorsiding
Windsor Station
How the masterplan spaces will function
Legend
01 – Central HubThe Central Hub will be a meeting place for the community. An epicenter of activity that overlooks the various precincts and activities in the park.
02 – Primary Movement AxisThe Primary Movement Axis will provide unimpeded access directly through the site between Windsor Station and Union Street.
03 – Eastern PrecinctThe Eastern Precinct will incorporate a reconfigured professionally designed BMX circuit.
04 – Southern PrecinctThe Southern Precinct will provide a large expanse of open grass for ball sports, picnics and a run-around space for dogs. The space will be large enough to be shared amongst the variety of uses required with minimal conflicts.
05 – Western PrecinctThe Western Precinct will provide a functional plaza space for community uses assoicated with the Stonnington Children’s Centre and the Will Sampson Hall users. It will function as a meeting place and forecourt to the existing civic buildings.
06 –Northern PrecinctThe Northern Precinct will be a linear activity space with multi-functional uses. Facilities will include basketball, netball, tennis wall, playground and skateable elements.
07 –Station InterfaceAn opportunity exists to work with PTV and VicTrack (owners of this parcel of land) to transform this area into an open and inviting entry to Windsor Station, with DDA compliant entry and direct access to Windsor Station. The gateway entry should be legible, open and safe.
01
04
05
06
03
02
07