Transcript of The Time Is Now For Modular Construction

PREBUILT POWER SOLUTIONS

PCX CORPORATION | ROB COYLE

M O D U L A RC O N S T R U C T I O N

T H E T I ME I S N O W F O R

PCX CORPORATION | ROB COYLE

PREBUILT POWER SOLUTIONS

C H A N G ETODAY' S CONSTRUCTION INDUSTRY NEEDS

“68% [of labor] is wasted on transportation delays, travelwithin job site, late starts and early quits, personnelbreaks and sundry of other delays.”

­ Barry LePatner, How to Fix America’s Construction Industry

PCX CORPORATION | ROB COYLE

PREBUILT POWER SOLUTIONS

P R O B L E M ST O D A Y S

L A B O R S H O R T A G EWe will continue to seegrowing demand andshrinking workforce.

S C H E D U L I N GTighter budgets requirecustomers to be faster torevenue.

R E G U L A T I O N SConstantly changingregulations requires attentiondevoted to compliance

.

PCX CORPORATION | ROB COYLE

PREBUILT POWER SOLUTIONS

L I M I T A T I O N SS T I C K B U I L T

I N C O N S I S T E N TQ U A L I T YCertain regions lack the skilledlabor required for complexinstallations

S C H E D U L E D E L A Y SPoor weather, late deliveries,unreliable labor, and changesall contribute to missed dates

S I T E WA S T ECommon overestimation ofmaterial requires handlingand disposal of extra goods

PCX CORPORATION | ROB COYLE

PREBUILT POWER SOLUTIONS

C O S TT H E

"The industry has become almostimmune to the fact that most

construction in this nation will resultin serious cost overruns and

schedule delays".

­ Barry LePatner, Broken Buildings,Busted Budgets

PCX CORPORATION | ROB COYLE

PREBUILT POWER SOLUTIONS

M O D U L A RC O N S T R U C T I O N

THE SOLUTION

The smart way to address:

The labor shortageCost overrunsSafety risk

PCX CORPORATION | ROB COYLE

PREBUILT POWER SOLUTIONS

P R E D I C T I V E C O S T SMODULAR CONSTRUCTI ON PROVI DES

"The controlled shop environment for construction, assembly, andprewiring offered cost savings to the project while increasing quality..."

­The Ruhlin Company

PCX CORPORATION | ROB COYLE

PREBUILT POWER SOLUTIONS

P R E D I C T I V E S C H E D U L EMODULAR CONSTRUCTI ON PROVI DES

PCX CORPORATION | ROB COYLE

S A V ETHE MORE COMPLEX, THE MORE YOU

Reduce construction cycle timeReduce skilled field laborReduce site wasteMaximize integrity of designMinimize safety risks onsite

PREBUILT POWER SOLUTIONS

PCX CORPORATION | ROB COYLE

PREBUILT POWER SOLUTIONS

PCX builds to order prefabricated electrical power distributionsystems including integrated switchboards for the commercial

construction, data center, and industrial/utility industries worldwide

CLIENTS

Over 10,000 systemsshipped throughoutNorth America and

Europe

BUILD

Built to spec compyingwith NEC using UL, ETL,

and CSA certs

DESIGN

In house engineeringprovides custom

solutions for yourproject

PCX CORPORATION | ROB COYLE

PREBUILT POWER SOLUTIONS

PCX CORPORATION | ROB COYLE

PREBUILT POWER SOLUTIONS

B E N E F I T ?HOW COULD YOUR NEXT PROJ ECT

please visit our websitepcxcorp.com