ITEM JOB N0 Page N0
C EXISTING SITE /
OFFICE BUILDING BUILDINGS / SERVICES 2/1
BILL Nr. 2 - OFFICE BUILDING
C EXISTING SITE / BUILDINGS / SERVICES
The Contractor is advised to visit the site, carefully
examine the items to be demolished, types of
construction etc. and to study the implication of such
demolition and the clearing away of the debris
The Contractor shall allow in its prices the protection
of adjacent buildings during excavation and/or
construction, the protection and maintenance of all
pipes ducts, and cables met in excavation !eeping
all ditches, gullies and channels clear and
unobstructed and ma!ing good any damage caused topublic road, !erbs and drains and paying all cost and
and charges incurred
The wor!s in this section consists of demolition and
alteration of existing four storey concrete framed structure
with sandcrete bloc!wor! enclosure and partition. The
building measure 1".#$ x ".2% x 1&.$m high
C2$ '()*+T*-
'emolishing individual structures and dispose
tem
0
tem
C#$ +T(T*- 3*T T()
emoving fittings and fixtures and pac! on site for client
C
tem
'
tem
( tem
-ote4 alvaged materials shall be set aside and shall onlybe disposed of upon receipt of instructions from the rchitect. n no case shall the credit value of salvagedmaterials be deducted from the rates of items in demolitionsto show a net figure
2$$mm thic! sandcrete bloc! wall [ 539 m2 ]
einforced concrete staircase, gutter and slab
[ 27 m3
]
hardwood panelled door and frame si5e #$$mm21$$mm high [ 32 Nr ]
6la5ed aluminium door and attached window and si5e2$$$mm x 12$$mm high [ 3 Nr ]
'itto si5e 1$$$mm x 7%$mm high [ 20 Nr ]
8/20/2019 The Headoffice - Bill - Blank
2/44
C!rr"#$ %& C&''#(%"&)
ITEM JOB N0 Page N0
OFFICE BUILDING SUBSTRUCTURE 2/2
C#$ lteration pot tems 8Cont9d:
emoving fittings and fixtures and pac! on site for client
tem
0 tem
C
tem
emoving finishings and dispose
' tem
emoving covering and pac! on site for client
(
tem
; tem
Cutting openings or recess, ma!e good all wor! disturbed
2$$mm thic! solid sandcrete bloc!wall, si5e
6 tem
< tem
= tem
C!rr"#$ %& C&''#(%"&)
C*++(CT*-
3age -r. 2/1
3age -r. 2/2
C EXISTING SITE / BUILDINGS / SERVICES
To ummary of 0ill -r. 2
>ater closet complete with cistern [ * Nr ]
>ash hand basin [ * Nr ]
(lectrical switches, soc!ets and light fittings includingwiring point [ +, Nr ]
Ceramic ;loor tiling including screeding [ 9, m2 ]
luminium sheet roofing with hardwood carcassing[ 237 m2 ]
3lywood ceiling and noggings [ *75 m2 ]
2$$$mm x 1%$$mm high [ + Nr ]
1$$$mm x 7%$mm high [ * Nr ]
1$$$mm x 21$$mm high [ *2 Nr ]
8/20/2019 The Headoffice - Bill - Blank
3/44
ITEM JOB N0 Page N0
OFFICE BUILDING GROUND OR 2/?
SUBSTRUCTURE
GROUND OR
'2$ (@CAT*- -' ;++-6
(xcavating
3its
maximum depth not exceeding 1.$$m B " -r. "
Trenches
0 width exceeding ?$$mm depth not exceeding 2.$$m ?
'isposal
C (xcavated materials off site 7
;illing to excavations
' average thic!ness D $.2%m arising from excavations E
;illing to )a!e up +evels
(
2
urface treatment
;
%2
GROUND OR
To ummary of 0ill -r. 2
m?
m?
m?
m?
average thic!ness D $.2%m imported laterite depositedin layers 1%$mm maximum thic! and compacted m?
3repare and apply dieldrex antitermite treatmentsolution to surfaces of excavations m2
8/20/2019 The Headoffice - Bill - Blank
4/44
ITEM JOB N0 Page N0
E IN-SITU CONCRETE/
OFFICE BUILDING LRGE RECST 2/ECONCRETE
E. IN-SITU CONCRETE /LRGE RECST CONCRETE
(.1$ -TF C*-C(T(
0linding bed
1
solated foundations
0 generally 2
6round beams
C generally E
labs
' thic!ness 1%$ E%$mm E
0eams
( isolated 7
; attached 2
Columns
6 generally 2
(.2$ ;*)>*G ;* -TF C*-C(T(
awn formwor! coating with release agent
ides of foundations
< height 2%$ %$$mm2# m
ides of ground beam and edges of bed
= height %$$ 1$$$mm ?& m
3lain insitu concrete 1$-/mm2ll in ggregate4
thic!ness H 1%$mm poured on or against earth orunblinded hardcore m?
einforced insitu concrete 2%-/mm22$mm ggregate4
m?
m?
m?
m?
m?
m?
8/20/2019 The Headoffice - Bill - Blank
5/44
(dges of suspended slabs plain vertical
G height H 2$$mm 22 m
C!rr"#$ %& C&''#(%"&)
ITEM JOB N0 Page N0E I)-1"% C&)(r#%#/
OFFICE BUILDING L!r# r#(!1% C&)(r#%# 2/%
4C&)%$6
(.2$ ;ormwor! for nsitu Concrete 8Cont9d:
awn formwor! coating with release agent
offits of slabs
21
0eams
0
21
C
12$
Columns
' isolated rectangular shaped B 2& -r 2#
(.?$ (-;*C()(-T ;* -TF C*-C(T(
0ars straight, bent and curved
( 2$mm diameter ground beam $.17 t
; 1&mm diameter ground beam $.1E t
6 1&mm diameter column bases $.17 t
< 1&mm diameter column $.?" t
= 1&mm diameter beam 1.E% t
G 12mm diameter slab $.%% t
+ 1$mm diameter lin!s ground beam $.1$ t
) 1$mm diameter lin!s beam $.%? t
- 1$mm diameter stirrups column $.11 t
thic!ness H 2$$mm height to soffit ?.$$ E.%$mhori5ontal m2
attached to slabs rectangular height to soffit 1.%$ ?.$$m B % -r m2
isolated rectangular height to soffit 1.%$ ?.$$mB ?7 -r m2
m2
einforcement 0 EEE# hot rolled deformed round hightensile steel yield strength E&$-/mm2
8/20/2019 The Headoffice - Bill - Blank
6/44
C!rr"#$ %& C&''#(%"&)
ITEM JOB N0 Page N0
E I)-1"% C&)(r#%#/
OFFICE BUILDING L!r# r#(!1% C&)(r#%# 2/&
4C&)%$6
C*++(CT*-
3age -r. 2/E
3age -r. 2/%
E. IN-SITU CONCRETE /LRGE RECST CONCRETE
To ummary of 0ill -r. 2
8/20/2019 The Headoffice - Bill - Blank
7/44
ITEM JOB N0 Page N0
OFFICE BUILDING F SONR8 2/7
F. SONR8
;1$ 0CG / 0+*CG >++-6
>alls
1%$mm thic! E?%
F. SONR8To ummary of 0ill -r. 2
8/20/2019 The Headoffice - Bill - Blank
8/44
ITEM JOB N0 Page N0
G STRUCTURL /
OFFICE BUILDING CRCSSING ETL / 2/"
TIBER
G. STRUCTURL / CRCSSING ETL / TIBER
61$ TFCTF+ T((+ ;)-6
;abricated pec 2%E x 1E& x ?1 F0 to 0 E?&$
6rade E?
Columns
weight not exceeding E$ !g/m 1.1E
0eams
0 weight not exceeding E$ !g/m 1."& t
;abricated pec 1$$ x 1$$ x " ngles to 0 E?&$
6rade E?
0racings
C weight not exceeding E$ !g/m $.2# t
6uard rails
' weight not exceeding E$ !g/m $.2$ t
;abricated pec &mm sheet plate to 0 E?&$
6rade E?
;loors
( weight not exceeding E$ !g/m $.&& t
3ermanent erection on site including supplying
and installing member connections
S%##' '") :r"$# 1;!))") 7.0m '&) < 2.0m ="$# <2.0m >"> !)$ >&"1%#$ 7.0m !:&?# r&)$ '#?#'
[ * Nr ]
;abricated pec E$mm diameter x ?.2mm galvanisedpipes to 0 E?&$ 6rade E?
8/20/2019 The Headoffice - Bill - Blank
9/44
;
E.1% t
)ild steel round bar4
rought hardwood in 9*dum9 species or other approvedeJual treated with preservative
8/20/2019 The Headoffice - Bill - Blank
10/44
6 (aves and verge soffit boarding &1
C!rr"#$ %& C&''#(%"&)
C*++(CT*-
3age -r. 2/"
3age -r. 2/#
G. STRUCTURL / CRCSSING ETL / TIBER
To ummary of 0ill -r. 2
ITEM JOB N0 Page N0
OFFICE BUILDING @ CLDDING / COVERING 2/1$
@ CLDDING / COVERING
++-6
Curtain walling panel with narrow powdered coated
aluminium profiles flush mounted 3il!ington insulight
double gla5ing with &mm 3il!ington optitherm -
laminated inner pane and 3il!ington opitfloat grey body
tinted laminated outer pane and 1&mm air filled cavity
8opitfloat 7%/%#: llow for top hung projected vents in
locations shown in accompanied drawings
>all cladding fabricated to flat, smooth
3lain vertical 22"
*penings extra over the partitions in which they occur
0 3ivoted window overall si5e &$$ x &$$mm high 17-r
'esign, supply and install luminium composite cladding
of lucobond/ lstrong/'urabuilt or eJuivalent ma!e
in metallic colours using prefabricated aluminium extruded
profiles of lloy &$&? T& in achromati5ed finish to
withstand the design wind pressure as per . The
fastening brac!ets of luminium /
8/20/2019 The Headoffice - Bill - Blank
11/44
provided if reJuired. 3anel si5e &$$ x &$$mm
>all cladding fabricated to flat, smooth
C 3lain vertical E$1
C!rr"#$ %& C&''#(%"&)
ITEM JOB N0 Page N0@ C'!$$") / C&?#r")
OFFICE BUILDING 4C&)%$6 2/11
8/20/2019 The Headoffice - Bill - Blank
12/44
@ CLDDING / COVERING
To ummary of 0ill -r. 2
ITEM JOB N0 Page N0
OFFICE BUILDING J TERROOFING 2/12
J TERROOFING
=?1 +MF' 33+(' >T(3**; **; C*T-6
Tan!ing and damp proofing to concrete base
;lat hori5ontal 21
0 ;lat vertical ?
J TERROOFING
To ummary of 0ill -r. 2
'ecadex waterproofing 'ygate 6hana +td., Tel. $?$?227##$, one coat +3+ 0onding 3rimer $.1& litre/m2 covering with one coat embedment of NdecadexN membrane1litre/m2 eemat 6lass ;ibre )at one coat finishing coat of9decadex9 membrane $.7% litre/m2 or other eJual andapproved type
m2
m2
8/20/2019 The Headoffice - Bill - Blank
13/44
ITEM JOB N0 Page N0
LINING / S@ETING /
OFFICE BUILDING DR8 RTITIONING 2/1?
LININGS / S@ETING / DR8 RTITIONING
3roprietary partitions
8/20/2019 The Headoffice - Bill - Blank
14/44
'
( 'epth of suspension 1%$ %$$mm 1 -r
G?$ 3-(+ 3TT*-
6la5ed >all 3artitions
3artitions
; ?2$$mm high 1$ m
C!rr"#$ %& C&''#(%"&) 6#!%") /
OFFICE BUILDING DrA !r%"%"&)") 2/1E4C&)%$6
6la5ed >all 3artitions 8Cont9d:
*penings extra over the partitions in which they occur
1 -r
GE$ '()*F-T0+( F3(-'(' C(+-6
+inings
0 Ceilings, plain pattern %7
uspended circular bul!head comprising of 12.%mm thic!two level gypsum plasterboard suspended ceiling fixed onto7%mm wide galvanised iron main P furring channelframewor!. The finished ceiling should be taped, s!immed Psanded smooth for the final finishes. llow for recessedpelmets P cutouts for light fixtures, and all openingsreJuired for electrical, idth dimensions as per layout
with modular glass panel provide frosted vinylstic!er/sunguard with hori5ontal pattern.
6la5ed aluminium door in natural anodi5ed profiles andpregla5ed with &mm plain sheet glass overall si5e1,$$$ x 2,1$$mm high
3AC tongued and grooved strip ceiling 1$mm thic!,incorporating Fclips fixing into to hardwood framing8measured separately:
m2
(xposed grid suspension system, &$$ x &$$ x 1%mmmineral fibre panels, semi recessed regular edge profile,predecorated finish, white laying in position in galvani5edsteel grid on galvani5ed adjustable wire hangers includingperimeter trims
8/20/2019 The Headoffice - Bill - Blank
15/44
C 'epth of suspension 1%$ %$$mm %E7
C!rr"#$ %& C&''#(%"&)
C*++(CT*-
3age -r. 2/1?
3age -r. 2/1E
LININGS / S@ETING / DR8 RTITIONINGTo ummary of 0ill -r. 2
ITEM JOB N0 Page N0L INDOS / DOORS /
OFFICE BUILDING STIRS 2/1%
L INDOS/DOORS/STIRS
+1$ >-'*> / **;+6indows in (xtruded luminium profile and glass
liding
Two bays overall si5e 2$$$ x 1%$$mm high " -r
0 Two bays overall si5e 2$$$ x 7%$mm high ? -r
C *ne bay overall si5e #$$ x 12$$mm high 1 -r
' 'itto overall si5e #$$ x 7%$mm high 1& -r
Ceilings fixing hangers at 12$$mm centres both ways totimber
m2
luminium windows and window frames white colourprofiles factory gla5ed with &mm tinted sheet glass fixing inposition including fixtures and subframe in galvani5ed steelstandard fitting
8/20/2019 The Headoffice - Bill - Blank
16/44
ooflights in 6lass and and stainless steel
(
1 -r
+2$ '** / rot hardwood in 9*dum9 species or other approved eJualtreated with preservative
;lush doors comprising hardwood s!eleton framing with&mm thic! internal Juality veneered plywood 8selected forclear varnish measured separately: covering on both sides
and hardwood lipping on all edges
>rot hardwood in 9*dum9 species or other approved eJualtreated with preservative
3anelled doors 1$$mm wide stiles and top rail 1%$mm wideintermediate rail 2$$mm wide bottom rail all open rebatedand filled with 2$mm thic! hardwood panel
>rot hardwood in 9*dum9 species or other approved eJualtreated with preservative
8/20/2019 The Headoffice - Bill - Blank
17/44
0 E% x 1E%mm =ambs 1&" m
C E% x 1E%mm +G>I / 0+FT'(
tainless teel
solated balustrades ra!ing 1$$$mm high 2" m
0 solated balustrades level ditto ? m
C!rr"#$ %& C&''#(%"&)
;actory doorsets finished in spray oil paint finish externalfire rated purpose metal frames 1.&mm double rebated,standard extension pieces butt hinges mortice loc!sreference 8 from uperloc!, 3rimordial +td or other eJual:
1$$$ x 2$?2mm height unit, to 1%$mm thic! wall, solidflush panel door by shopfitter, 7"% x 1#"2mm
tainless steel balustrade 1$$$mm high overall consistingof &$mm diameter pipe top rail ? -r 2%mm diameter pipeintermediate rails %$mm diameter standards at 7%$mmcentres all welded together, ends plugged and screwed toconcrete
8/20/2019 The Headoffice - Bill - Blank
18/44
C*++(CT*-
3age -r. 2/1%
3age -r. 2/1&
3age -r. 2/17
L INDOS/DOORS/STIRS
To ummary of 0ill -r. 2
ITEM JOB N0 Page N0
OFFICE BUILDING SURFCE FINIS@ES 2/1"
SURFCE FINIS@ES
Cement and sand 814?: one coat floated
;loors
7%mm thic! level and to falls H 1%L from hori5ontal 7?2
Treads
0 ?$mm thic! ?$$mm width E% m
isers
C 12mm thic! 17$mm high %$ m
)1$ C()(-T 4 -' / C*-C(T( C((' /T*33-6
m2
8/20/2019 The Headoffice - Bill - Blank
19/44
trings
' 12mm thic! ?%$mm wide ra!ing 2" m
oofs
( %$mm thic! level and to falls H 1%L from hori5ontal 21
Cement and sand 814E: one coat trowelled
>alls
; 7"?
6 'itto width H ?$$mm do 2"? m
Ceiling
<
E2
solated column
= 2$mm thic! render width D ?$$mm on concrete 27&
C!rr"#$ %& C&''#(%"&)
ITEM JOB N0 Page N0
Sr!(# F")"1>#1
OFFICE BUILDING 4C&)%$6 2/1#
)2$ 3lastered / endered / oughcast Coatings 8Cont9d:
Cement and sand 814E: one coat floated
>alls
?%7
0 'itto width H ?$$mm do 1&% m
Cement and sand 814?: mixed with approved waterproofadditive one coat trowelled external
m2
)2$ 3+T((' / (-'((' / *F6
8/20/2019 The Headoffice - Bill - Blank
20/44
>alls
C 3lain width D ?$$mm ?%7
' 'itto width H ?$$mm do 1&% m
;loors
( +evel or to falls H 1%L from hori5ontal to concrete plain E2
;loors
; +evel or to falls H 1%L from hori5ontal to concrete plain $
!irting
6 1$$mm high 2#& m
Treads
< ?$$mm width with nonslip tile strip nosing E% m
isers
= 1%$mm high %$ m
C!rr"#$ %& C&''#(%"&)
ITEM JOB N0 Page N0
Sr!(# F")"1>#1
OFFICE BUILDING 4C&)%$6 2/2$
(xtra over
ccessories
luminium round cover strips to edges of tiles 2"? m
)&$ 3-T-6 / C+( ;-
8/20/2019 The Headoffice - Bill - Blank
21/44
6eneral surfaces
0 6irth D ?$$mm 1,?1#
6eneral surfaces
C >alls 6irth D ?$$mm 1,$$1
' Ceilings 6irth D ?$$mm E2
( Column 6irth D ?$$mm 27&
6eneral surfaces
; >alls 6irth D ?$$mm ?$2
6eneral surfaces
6 6irth H ?$$mm application on site prior to fixing 2#
6eneral surfaces
< 6irth D ?$$mm 1?#
= 6irth H ?$$mm E"
C!rr"#$ %& C&''#(%"&)
ITEM JOB N0 Page N0
Sr!(# F")"1>#1
OFFICE BUILDING 4C&)%$6 2/21
)&$ 3ainting / Clear ;inishing 8Cont9d:
3repare and apply two coats of enamel gloss oil paint
6eneral surfaces of structural metalwor!
6irth D ?$$mm 1%$
C!rr"#$ %& C&''#(%"&)
m2
3repare and apply two undercoats, one finishing coat of99CoralplusN crylic (mulsion 3aint on cement render
m2
m2
m2
3repare and apply two undercoats, one finishing coat of99Coral wallguardN crylic (mulsion 3aint on cement render
m2
3repare and apply one coat of luminium primer onwoodwor!
m2
3repare and apply two coats of NCoral99 -itrocellulose sealer
and three coats of NCoralN Coramar 3olyurethane atin)arine varnish on woodwor!4
m2
m2
m2
8/20/2019 The Headoffice - Bill - Blank
22/44
C*++(CT*-
3age -r. 2/1"
3age -r. 2/1#
3age -r. 2/2$
3age -r. 2/21
SURFCE FINIS@ES
To ummary of 0ill -r. 2
ITEM JOB N0 Page N0
N FURNITURE /
OFFICE BUILDING EUIENT 2/22
N FURNITURE / EUIENT
)irrors 0..#%2, clear float, 6, silvered P protected with copper bac!ing, undercoat paint and stoved
enamel
-1$ 6(-(+ ;@TF( / ;F-
8/20/2019 The Headoffice - Bill - Blank
23/44
E%$ x &$$mm holes E edges bevelled 11 -r
3*T0+( ;( (@T-6F
8/20/2019 The Headoffice - Bill - Blank
24/44
1 -r
-1? -TI 33+-C( / ;TT-6
011 -r
C
11 -r
utomatic hand drier
'
11 -r
C!rr"#$ %& C&''#(%"&)
ITEM JOB N0 Page N0
N Fr)"%r# / E";m#)%
OFFICE BUILDING 4C&)%$6 2/2E
-1? anitary ppliances / ;ittings 8Cont9d:
'ouble bowl, single drain stainless steel cabinet sin! unitcomplete with 1?mm dia. )ixer flipup tap unit. E$mm dia.waste outlet with chain and plug E$mm dia. bottle trap. llfittings shall be chromium plated.
&$$ x 1?$$mm fixing to masonry sealing at bac! withmastic sealant
upply and nstall the following ;ixtures )a!e Twyfords, rmitage han!s or other approved eJuivalent
>ash basins white vitreous china to 0.?E$2 ?2mmchromium plated slotted waste, chain, stay and plug to0.??"$ ?2mm stainless steel bottle trap paintedcantilever brac!ets 1?mm chrome plated )ixer flipup tapsto 0.1$1$
%&$ x E1%mm fixing brac!ets to masonry with screwssealing at bac! with mastic sealant
Close coupled >C. suite, hori5ontal outlet white vitreouschina pan # litre wall hung white vitreous cistern to0.?E$2 plastic float operated valve with or 3 trap outletconnector plastics seat and cover with stainless steelhinges
fixing pan and cistern to masonry with screws beddingpan in mastic jointing pan to soil pipe with outletconnector
>hite thermoplastic outer case with class doubleinsulating Compact high performance fan with noiselevel not exceeding &"d0 at 1.%m. Q-o Touch afetyCutout and safety time. ating4 1.E Gw operation9
8/20/2019 The Headoffice - Bill - Blank
25/44
+iJuid soap dispenser as 06(++. Capacity4 2 +ts
fixing to masonry with screws 11 -r
Toilet roll holder stainless steel
0 1%$ x 7&mm fixing to masonry with screws 11 -r
Towel rail stainless steel
C &%$mm long fixing to masonry with screws 11 -r
C!rr"#$ %& C&''#(%"&)
C*++(CT*-
3age -r. 2/22
3age -r. 2/2?
3age -r. 2/2E
N FURNITURE / EUIENT
To ummary of 0ill -r. 2
ITEM JOB N0 Page N0
BUILDING FBRICOFFICE BUILDING SUNDRIES 2/2%
ccessories T=A&r$1 rm"%!# S>!)1 or approvedeJual,
8/20/2019 The Headoffice - Bill - Blank
26/44
BUILDING FBRIC SUNDRIES
*G - C*--(CT*- >T< 33('F33+I IT()
Cut chase in sandcrete bloc!wor! for pipe ma!e good allwor! disturbed
8/20/2019 The Headoffice - Bill - Blank
27/44
3?2
8/20/2019 The Headoffice - Bill - Blank
28/44
R DISOSL S8STES
1$ ->T( 33(>*G /6FTT(
3ipes staright supports at average 1$$$mm centres
1$1 m
0 (xtra shoes & -r
C 'itto bends 12 -r
oof outlets as ;ulbora or other approved eJual
' outlet spigot solvent welded joint to plastic & -r
6utters straight supports at average 1$$$mm centres
(
%# m
; (xtra angles E -r
11 ;*F+ '-6( 0*A( 6*F-'
3ipes straight
6
?" m
< 1$$mm diameter in concrete or bloc!wor! 1" m
=
%# m
G %$mm diameter in concrete or bloc!wor! 22 m
+ ?2mm diameter ditto 1% m
C!rr"#$ %& C&''#(%"&)
ITEM JOB N0 Page N0
B"'$") F!:r"(
F3AC sJuare section pipes and fittings, 0 E%1E solvent
welded joints ipewor! and supports self coloured white
"$ x "$mm in standard holderbats fixing to bloc!wor!with galvanised screws
F3AC box gutters and fittings push fit connector jointsgutterwor! and supports self coloured white
1%$ x 1$$mm in standard fascia brac!ets fixing totimber with galvanised screws
upply and install the following class 909 upvc pipes andfittings with solvent cement.
1$$mm diameter fixed to concrete with aluminium clipsat 1.1$m centres in ducts
%$mm diameter fixed to concrete with aluminium clips at1.1$m centres in ducts
8/20/2019 The Headoffice - Bill - Blank
29/44
OFFICE BUILDING S)$r"#1 2/2"
4C&)%$6
11 ;oul 'rainage bove 6round
tems extra over
E$ -r
0 1% -r
C 2$ -r
' fittings, pipe D &%mm diameter three ends 12 -r
( ?2 -r
; fittings, pipe D &%mm diameter swept tee, three ends ? -r
C!rr"#$ %& C&''#(%"&)
C*++(CT*-
3age -r. 2/27
3age -r. 2/2"
R DISOSL S8STES
To ummary of 0ill -r. 2
ITEM JOB N0 Page N0
upply and install the following class 909 upvc pipes andfittings with solvent cement.
fittings, pipe H &%mm diameter two ends
fittings, pipe H &%mm diameter three ends
fittings, pipe H &%mm diameter floor drains
fittings, pipe D &%mm diameter #$$ bend, two ends
8/20/2019 The Headoffice - Bill - Blank
30/44
OFFICE BUILDING S IED SUL8 S8STE 2/2#
S IED SUL8 S8STES
1$ C*+' >T(
3ipes straight
E$mm diameter in concrete or bloc!wor! ?& m
0 ?2mm diameter ditto #" m
C 2%mm diameter ditto EE m
' 2$mm diameter ditto E" m
( 1%mm diameter ditto E7 m
tems extra over
; %2 -r
6 17 -r
< ;lexible connector 2% -r
3ipewor! ancillaries
=
? -r
G
& -r
+
7 -r
)1 -r
-
# -r
3
2& -r
M
2& -r
C!rr"#$ %& C&''#(%"&)
upply and install the following class 9C9 upvc pipes andfittings with solvent cement.
fittings, pipe H &%mm diameter two ends
fittings, pipe H &%mm diameter three ends
top valves nominal si5e E$mm fixed to pvc pipe inconcrete/bloc!wor!
top valves nominal si5e ?2mm fixed to pvc pipe inconcrete/bloc!wor!
top valves nominal si5e 2%mm fixed to pvc pipe inconcrete/bloc!wor!
-on return valve nominal si5e E$mm fixed to pvc pipein concrete/bloc!wor!
top valves nominal si5e 2$mm fixed to pvc pipe inconcrete/bloc!wor!
Chec! valves nominal si5e 1%mm fixed to pvc pipe inconcrete/bloc!wor!
-on return valve nominal si5e 1%mm fixed to pvc pipein concrete/bloc!wor!
8/20/2019 The Headoffice - Bill - Blank
31/44
ITEM JOB N0 Page N0
S ";#$ S;;'A SA1%#m
OFFICE BUILDING 4C&)%$6 2/?$
1$ Cold >ater 8Cont9d:
upply and install the following4
(Juipment
Cold water storage cistern plastic
-ominal Capacity 4 &,$$$ +itres with the ff4 accessories
i: 2%mm dia. nlet connector with ballvalve
iii: 2%mm dia. *utlet connector
iii: %$mm dia. drain / overflow connectors 1 -r
0 Cold water storage cistern plastic
-ominal Capacity 4 &,$$$ +itres with the ff4 accessoriesi: 2%mm dia. nlet connector with ballvalve
iii: 2%mm dia. *utlet connector
iii: %$mm dia. drain / overflow connectors 2 -r
C utomatic Cold >ater 0ooster 3umpset complete
with float switch as '0 2=et 2%1) or approved eJual
'ischarge 4 1.$ l/s
8/20/2019 The Headoffice - Bill - Blank
32/44
ITEM JOB N0 Page N0
S ";#$ S;;'A SA1%#m
OFFICE BUILDING 4C&)%$6 2/?1
&$ ;(
8/20/2019 The Headoffice - Bill - Blank
33/44
S IED SUL8 S8STES
To ummary of 0ill -r. 2 -
ITEM JOB N0 Page N0
U VENTILTION / IR
OFFICE BUILDING CONDITIONING S8STES 2/?2
U VENTILTION / IR CONDITIONING S8STES
F1$ 6(-(+ A(-T+T*-
Capacity 4 %$cfm
3ower 4 ;ractional hp 3- %$
8/20/2019 The Headoffice - Bill - Blank
34/44
6 'itto
+ength 4 11 m 2 -r
C!rr"#$ %& C&''#(%"&)
ITEM JOB N0 Page N0
U V#)%"'!%"&) / "r
OFFICE BUILDING C&)$"%"&)") SA1%#m1 2/??4C&)%$6
F&$ ir Conditioning Fnits 8Cont9d:
efrigerant 3iping 8Cont9d:
uction +ine i5e4 1&mm *'
+iJuid +ine i5e 4 &mm *'+ength 4 1$ m ? -r
0 'itto
+ength 4 & m 7 -r
'itto
+ength 4 E m " -r
C*-'(-T( '-6(
upply and install the following class 909 upvc pipes
and fittings
C 2$mm dia. upvc pipe %E -r
' 1%mm dia. 'itto 72 -r
( ? -r
; 1%mm dia. ditto E" -r
6 2$mm x 2$mm x 1%mm reducing tee 22 -r
< 2$mm dia. running trap with %$mm water seal 2E -r
(+(CTC+ >-6
upply and install the following4
=
?&" m
G
2E& m
upply and install the following precharged and insulatedrefrigerant as before described
2$mm dia. x #$* elbow
(lectrical wiring from building solator to condensing unitCable i5e4 ? x E.$mm2
3ac!aged electrical cabling from condensing unit to fancoil units Cable si5e4 ? x 2.%mm2
8/20/2019 The Headoffice - Bill - Blank
35/44
C!rr"#$ %& C&''#(%"&)
ITEM JOB N0 Page N0U V#)%"'!%"&) / "r
OFFICE BUILDING C&)$"%"&)") SA1%#m1 2/?E
4C&)%$6
C*++(CT*-
3age -r. 2/?2
3age -r. 2/??
U VENTILTION / IR CONDITIONING S8STES
To ummary of 0ill -r. 2 6
8/20/2019 The Headoffice - Bill - Blank
36/44
ITEM JOB N0 Page N0
V ELECTRICL SUL8 /
OFFICE BUILDING OER LIG@TING 2/?%
S8STES
V ELECTRICL SUL8 / OER LIG@TING S8STES
A2$ +A 'T0FT*-
LV C!:'#1 !)$ "r")
3olyvinylchloride material jointed in solvent cement in
%$mm diameter rigid straight in concrete floor
or bloc! wall 71 m
0 (xtra over the conduit in which they occur
1%$mm x 1%$mm junction boxes % -r
N3ilcaN type swa/pvc insulated copper in
CablesC 7% m
' "" m
( ?1E
Connections
; 1& -r
6 & -r
< E -r
= 2 -r
LV S="%(>#!r !)$ D"1%r":%"&) :&!r$1
G
1 -r
+ 2$$ T3- switch with
8/20/2019 The Headoffice - Bill - Blank
37/44
)
E -r
- 2$$ T3- cutout unit 1 -r
3 &?, T3 )CC0, c/w (nclosure 8F3 ncomer: E -r
M 2$$ utomatic Change over witch 1 -r
C!rr"#$ %& C&''#(%"&)
ITEM JOB N0 Page N0
V E'#(%r"(!' S;;'A /
OFFICE BUILDING &=#r L">%") SA1%#m1 2/?&
4C&)%$6
A21 6(-(+ +6all 0rac!et compact fluorescent c/w *pal'iffuser
2 x "w 9T+9' fluorescent selfcontained, nonmaintained?hour prismatic diffuser emergency fittings, c/w N(@TN3ictogram
8/20/2019 The Headoffice - Bill - Blank
38/44
((#11&r"#1 &r E'#(%r"(!' S#r?"(#1
8/20/2019 The Headoffice - Bill - Blank
39/44
C!rr"#$ %& C&''#(%"&)
C*++(CT*-
3age -r. 2/?%
3age -r. 2/?&
3age -r. 2/?7
V ELECTRICL SUL8 / OER LIG@TING S8STES
To ummary of 0ill -r. 2 -
ITEM JOB N0 Page N0
COUNICTION /
OFFICE BUILDING SECURIT8 / CONTROL 2/?"
S8STES
COUNICTION / SECURIT8 / CONTROL S8STES
>1$ T(+(C*))F-CT*-
2$mm 3vc pipe ?&& m
0 2$mm 3vc Circular box E$ -r
C 7%mm x 7%mm 6alvani5ed conduit box &$ -r
' %$pair wall mounted Telephone 0T
8Terminal 0loc!: 2 -r
( 2E 3ort 3atch 3anel 1 -r
; Category %e 'ata Cable E71 m
6 2 6ang =11 Telephone soc!et outlet 21 -r
< ?$$mm x 1%$mm 3vc =unction 0ox with cover E -r
>2$ '* / TA / CCTA
CCTV INSTLLTIONS
upply and install the following CCTA system
= 2E Channel tream 'A 1 -r
G +ow lux 'ay P -ight Camera " -r
+ 'ome Camera E -r
upply and install internal and external TelephoneCommunication eJuipment and accessories as follows4
8/20/2019 The Headoffice - Bill - Blank
40/44
) 2&99 )onitor 8+(': 1 -r
- 3ower supply units 1 -r
3 Coaxial P 3ower supply cable %&" m
M 2$mm 3AC pipe E%% m
EF >all mounted cabinet 1 -r
Testing, Commissioning P 3rogramming
C!rr"#$ %& C&''#(%"&) 6
8/20/2019 The Headoffice - Bill - Blank
41/44
M Category &e 'ata Cable EE2 m
?$$mm x 1%$mm 3vc =unction 0ox with cover 2 -r
C!rr"#$ %& C&''#(%"&)
ITEM JOB N0 Page N0
C&mm)"?!%"&) /OFFICE BUILDING S#(r"%A / C&)%r&' SA1%#m1 2/E$
4C&)%$6
>%$ ;( '(T(CT*- -' +)
&Rone conventional control panel complete with
integral battery, charger and other reJuisite
accessories. 1 -r
0 *ptical mo!e ensor complete with
mounting base ?$ -r
C 'itto but %1 (T
8/20/2019 The Headoffice - Bill - Blank
42/44
G
?" m
+
" -r
)
1 -r
- (arth nspection chamber, c/w concrete cover. 1 -r
C!rr"#$ %& C&''#(%"&)
ITEM JOB N0 Page N0 C&mm)"?!%"&) /
OFFICE BUILDING S#(r"%A / C&)%r&' SA1%#m1 2/E1
4C&)%$6
>%2 +6++ Cat -o. )3C 1&: 2 -r
0 2$$$m +ong 1&mm thread diameter copper
elevation rod. 8ef4 .-. >++ Cat -o. (17$: 2 -r
C 2%mm x ?mm 6unmetal sJuare tape clamp " -r
' 2%mm x ?mm Copper tape down conductor
8ef4 .-. >++ Cat -o. T+2%?: 1$$ m
( -aval 0rass metallic 'C tape clip complete
with clip and plug 1$$ -r
; #$$mm x #$$mm ++ Cat -o. ()+#$?: 2 -r
6 1&mm diameter, 12$$mm long copper bonded
earth electrode cad welded to four corners of
earth mat
8ef4 .-. >++ Cat -o. (012: " -r
< 2%mm x ?mm 6unmetal screw down test
clam 8ef4 .-. >++ Cat -o. =6 2%?: 2 -r
?%mm2, bonded to the main switch or maindistributionboard and an earth electrode 8distribution board andelectrode measured separately:
1&mm diameter, 1%$$mm long copper bonded earthelectrode c/w clamps
&mm x E$mm x ?$$mm (arth 0ar mounted on nsulators
on wall.
upply and install a lightning protection system comprisingeJuipment and materials manufactured by )essrs . -.>++ or any other approved manufacturer as follows4
8/20/2019 The Headoffice - Bill - Blank
43/44
C!rr"#$ %& C&''#(%"&)
C*++(CT*-
3age -r. 2/?7
3age -r. 2/?"
3age -r. 2/?#
3age -r. 2/E1
COUNICTION / SECURIT8 / CONTROL S8STES
To ummary of 0ill -r. 2
ITEM JOB N0 Page N0
OFFICE BUILDING SUR8 2/E2
GE BILL Nr. 2 - SUR8
NR
2/2 C (@T-6 T( / 0F+'-6 / (AC(
2/? 6*F-' >*G
2/& (. -TF C*-C(T( / +6( 3(CT C*-C(T(
2/7 ;. )*-I
2/1$ < C+''-6 / C*A(-6
2/12 = >T(3**;-6
2/1? G +--6 / /'**/T
2/1# ). F;C( ;-
8/20/2019 The Headoffice - Bill - Blank
44/44
2/2& 3 0F+'-6 ;0C F-'(
2/2" . '3*+ IT()
2/?1 33(' F33+I IT()
2/?E F A(-T+T*- / C*-'T*--6 IT()
2/?7 A. (+(CTC+ F33+I / 3*>( +6 C*))F-CT*- / (CFTI / C*-T*+ IT()
BILL Nr. 2 - OFFICE BUILDING
Carried to 6eneral ummary -