The Headoffice - Bill - Blank

download The Headoffice - Bill - Blank

of 17

Transcript of The Headoffice - Bill - Blank

  • 8/20/2019 The Headoffice - Bill - Blank

    1/44

     ITEM    JOB N0 Page N0

    C EXISTING SITE /

    OFFICE BUILDING BUILDINGS / SERVICES 2/1

    BILL Nr. 2 - OFFICE BUILDING  

    C EXISTING SITE / BUILDINGS / SERVICES

    The Contractor is advised to visit the site, carefully

    examine the items to be demolished, types of

    construction etc. and to study the implication of such

    demolition and the clearing away of the debris

    The Contractor shall allow in its prices the protection

    of adjacent buildings during excavation and/or 

    construction, the protection and maintenance of all

    pipes ducts, and cables met in excavation !eeping

    all ditches, gullies and channels clear and

    unobstructed and ma!ing good any damage caused topublic road, !erbs and drains and paying all cost and

    and charges incurred

    The wor!s in this section consists of demolition and

    alteration of existing four storey concrete framed structure

    with sandcrete bloc!wor! enclosure and partition. The

    building measure 1".#$ x ".2% x 1&.$m high

    C2$ '()*+T*-

    'emolishing individual structures and dispose

       tem

    0

     tem

    C#$ +T(T*- 3*T T()

    emoving fittings and fixtures and pac! on site for client

    C

     tem

    '

     tem

    (  tem

    -ote4 alvaged materials shall be set aside and shall onlybe disposed of upon receipt of instructions from the rchitect. n no case shall the credit value of salvagedmaterials be deducted from the rates of items in demolitionsto show a net figure

    2$$mm thic! sandcrete bloc! wall [ 539 m2 ]

    einforced concrete staircase, gutter and slab 

    [ 27 m3

     ]

    hardwood panelled door and frame si5e #$$mm21$$mm high [ 32 Nr ]

    6la5ed aluminium door and attached window and si5e2$$$mm x 12$$mm high [ 3 Nr ]

    'itto si5e 1$$$mm x 7%$mm high [ 20 Nr ]

  • 8/20/2019 The Headoffice - Bill - Blank

    2/44

    C!rr"#$ %& C&''#(%"&)

     ITEM   JOB N0 Page N0 

    OFFICE BUILDING SUBSTRUCTURE 2/2

    C#$ lteration pot tems 8Cont9d:

    emoving fittings and fixtures and pac! on site for client

       tem

    0  tem

    C

     tem

    emoving finishings and dispose

    '  tem

    emoving covering and pac! on site for client

    (

     tem

    ;  tem

    Cutting openings or recess, ma!e good all wor! disturbed

    2$$mm thic! solid sandcrete bloc!wall, si5e

    6  tem

    <  tem

    =  tem

    C!rr"#$ %& C&''#(%"&)

    C*++(CT*-

    3age -r. 2/1

    3age -r. 2/2

     

    C EXISTING SITE / BUILDINGS / SERVICES

    To ummary of 0ill -r. 2

    >ater closet complete with cistern [ * Nr ]

    >ash hand basin [ * Nr ]

    (lectrical switches, soc!ets and light fittings includingwiring point [ +, Nr ]

    Ceramic ;loor tiling including screeding [ 9, m2 ]

     luminium sheet roofing with hardwood carcassing[ 237 m2 ]

    3lywood ceiling and noggings [ *75 m2 ]

    2$$$mm x 1%$$mm high [ + Nr ]

    1$$$mm x 7%$mm high [ * Nr ]

    1$$$mm x 21$$mm high [ *2 Nr ]

  • 8/20/2019 The Headoffice - Bill - Blank

    3/44

     ITEM   JOB N0 Page N0 

    OFFICE BUILDING GROUND OR 2/?

    SUBSTRUCTURE

    GROUND OR

    '2$ (@CAT*- -' ;++-6

    (xcavating

    3its

      maximum depth not exceeding 1.$$m B " -r. "

    Trenches

    0 width exceeding ?$$mm depth not exceeding 2.$$m ?

    'isposal

    C (xcavated materials off site 7

    ;illing to excavations

    ' average thic!ness D $.2%m arising from excavations E

    ;illing to )a!e up +evels

    (

    2

    urface treatment

    ;

    %2

     

    GROUND OR

    To ummary of 0ill -r. 2

    m?

    m?

    m?

    m?

    average thic!ness D $.2%m imported laterite depositedin layers 1%$mm maximum thic! and compacted m?

    3repare and apply dieldrex antitermite treatmentsolution to surfaces of excavations m2

  • 8/20/2019 The Headoffice - Bill - Blank

    4/44

     ITEM    JOB N0 Page N0

    E IN-SITU CONCRETE/

    OFFICE BUILDING LRGE RECST 2/ECONCRETE

    E. IN-SITU CONCRETE /LRGE RECST CONCRETE 

    (.1$ -TF C*-C(T(  

    0linding bed  

     

    1

     

    solated foundations  

    0 generally 2

     

    6round beams  

    C generally E

     

    labs  

    ' thic!ness 1%$ E%$mm E

     

    0eams  

    ( isolated 7

     

    ; attached 2

     Columns  

    6 generally 2

     

    (.2$ ;*)>*G ;* -TF C*-C(T(  

    awn formwor! coating with release agent  

    ides of foundations  

    < height 2%$ %$$mm2# m

     

    ides of ground beam and edges of bed

    = height %$$ 1$$$mm ?& m

    3lain insitu concrete 1$-/mm2ll in ggregate4

    thic!ness H 1%$mm poured on or against earth orunblinded hardcore m?

    einforced insitu concrete 2%-/mm22$mm ggregate4

    m?

    m?

    m?

    m?

    m?

    m?

  • 8/20/2019 The Headoffice - Bill - Blank

    5/44

     

    (dges of suspended slabs plain vertical  

    G height H 2$$mm 22 m

     

    C!rr"#$ %& C&''#(%"&)

     ITEM    JOB N0 Page N0E I)-1"% C&)(r#%#/

    OFFICE BUILDING L!r# r#(!1% C&)(r#%# 2/%

    4C&)%$6

    (.2$ ;ormwor! for nsitu Concrete 8Cont9d:  

    awn formwor! coating with release agent  

    offits of slabs  

     21

     

    0eams  

    0

    21

     

    C

    12$

     

    Columns  

    ' isolated rectangular shaped B 2& -r 2#

     

    (.?$ (-;*C()(-T ;* -TF C*-C(T(  

    0ars straight, bent and curved  

    ( 2$mm diameter ground beam   $.17 t

     ; 1&mm diameter ground beam   $.1E t

     

    6 1&mm diameter column bases   $.17 t

     

    < 1&mm diameter column   $.?" t

     

    = 1&mm diameter beam   1.E% t

     

    G 12mm diameter slab   $.%% t

     

    + 1$mm diameter lin!s ground beam   $.1$ t

     

    ) 1$mm diameter lin!s beam   $.%? t

     

    - 1$mm diameter stirrups column   $.11 t

    thic!ness H 2$$mm height to soffit ?.$$ E.%$mhori5ontal m2

    attached to slabs rectangular height to soffit 1.%$ ?.$$m B % -r m2

    isolated rectangular height to soffit 1.%$ ?.$$mB ?7 -r m2

    m2

    einforcement 0 EEE# hot rolled deformed round hightensile steel yield strength E&$-/mm2

  • 8/20/2019 The Headoffice - Bill - Blank

    6/44

     

    C!rr"#$ %& C&''#(%"&)

     ITEM    JOB N0 Page N0

    E I)-1"% C&)(r#%#/

    OFFICE BUILDING L!r# r#(!1% C&)(r#%# 2/&

    4C&)%$6

    C*++(CT*-

    3age -r. 2/E

    3age -r. 2/%

     

    E. IN-SITU CONCRETE /LRGE RECST CONCRETE

    To ummary of 0ill -r. 2

  • 8/20/2019 The Headoffice - Bill - Blank

    7/44

     ITEM    JOB N0 Page N0

    OFFICE BUILDING F SONR8 2/7

    F. SONR8  

    ;1$ 0CG / 0+*CG >++-6  

    >alls  

      1%$mm thic! E?%

     

    F. SONR8To ummary of 0ill -r. 2

  • 8/20/2019 The Headoffice - Bill - Blank

    8/44

     ITEM    JOB N0 Page N0

    G STRUCTURL /

    OFFICE BUILDING CRCSSING ETL / 2/"

    TIBER

    G. STRUCTURL / CRCSSING ETL / TIBER  

    61$ TFCTF+ T((+ ;)-6

    ;abricated pec 2%E x 1E& x ?1 F0 to 0 E?&$

    6rade E?

    Columns

      weight not exceeding E$ !g/m 1.1E 

    0eams

    0 weight not exceeding E$ !g/m 1."& t

     

    ;abricated pec 1$$ x 1$$ x " ngles to 0 E?&$

    6rade E?

    0racings

    C weight not exceeding E$ !g/m $.2# t

     

    6uard rails

    ' weight not exceeding E$ !g/m $.2$ t

     

    ;abricated pec &mm sheet plate to 0 E?&$

    6rade E?

    ;loors

    ( weight not exceeding E$ !g/m $.&& t

     3ermanent erection on site including supplying

    and installing member connections

    S%##' '") :r"$# 1;!))") 7.0m '&) < 2.0m ="$# <2.0m >"> !)$ >&"1%#$ 7.0m !:&?# r&)$ '#?#'

    [ * Nr ]

    ;abricated pec E$mm diameter x ?.2mm galvanisedpipes to 0 E?&$ 6rade E?

  • 8/20/2019 The Headoffice - Bill - Blank

    9/44

    ;

    E.1% t

     

    )ild steel round bar4

    rought hardwood in 9*dum9 species or other approvedeJual treated with preservative

  • 8/20/2019 The Headoffice - Bill - Blank

    10/44

     

    6 (aves and verge soffit boarding &1

     

    C!rr"#$ %& C&''#(%"&)

    C*++(CT*-

    3age -r. 2/"

    3age -r. 2/#

    G. STRUCTURL / CRCSSING ETL / TIBER

    To ummary of 0ill -r. 2

     ITEM    JOB N0 Page N0

    OFFICE BUILDING @ CLDDING / COVERING 2/1$

    @ CLDDING / COVERING  

    ++-6  

    Curtain walling panel with narrow powdered coated

    aluminium profiles flush mounted 3il!ington insulight

    double gla5ing with &mm 3il!ington optitherm -

    laminated inner pane and 3il!ington opitfloat grey body

    tinted laminated outer pane and 1&mm air filled cavity

    8opitfloat 7%/%#: llow for top hung projected vents in

    locations shown in accompanied drawings

    >all cladding fabricated to flat, smooth

      3lain vertical 22"

     

    *penings extra over the partitions in which they occur   

    0 3ivoted window overall si5e &$$ x &$$mm high 17-r  

    'esign, supply and install luminium composite cladding

    of lucobond/ lstrong/'urabuilt or eJuivalent ma!e

    in metallic colours using prefabricated aluminium extruded  

    profiles of lloy &$&? T& in achromati5ed finish to

    withstand the design wind pressure as per . The

    fastening brac!ets of luminium /

  • 8/20/2019 The Headoffice - Bill - Blank

    11/44

    provided if reJuired. 3anel si5e &$$ x &$$mm  

    >all cladding fabricated to flat, smooth

    C 3lain vertical E$1

     

    C!rr"#$ %& C&''#(%"&)

     ITEM    JOB N0 Page N0@ C'!$$") / C&?#r")

    OFFICE BUILDING 4C&)%$6 2/11

  • 8/20/2019 The Headoffice - Bill - Blank

    12/44

     

    @ CLDDING / COVERING

    To ummary of 0ill -r. 2

     ITEM    JOB N0 Page N0

    OFFICE BUILDING J TERROOFING 2/12

    J TERROOFING  

    =?1 +MF' 33+(' >T(3**; **; C*T-6

     

    Tan!ing and damp proofing to concrete base  

      ;lat hori5ontal 21

     

    0 ;lat vertical ?

     

    J TERROOFING

    To ummary of 0ill -r. 2

    'ecadex waterproofing 'ygate 6hana +td., Tel. $?$?227##$, one coat +3+ 0onding 3rimer $.1& litre/m2 covering with one coat embedment of NdecadexN membrane1litre/m2 eemat 6lass ;ibre )at one coat finishing coat of9decadex9 membrane $.7% litre/m2 or other eJual andapproved type

    m2

    m2

  • 8/20/2019 The Headoffice - Bill - Blank

    13/44

     ITEM    JOB N0 Page N0

    LINING / S@ETING /

    OFFICE BUILDING DR8 RTITIONING 2/1?

    LININGS / S@ETING / DR8 RTITIONING  

    3roprietary partitions  

     

  • 8/20/2019 The Headoffice - Bill - Blank

    14/44

     

    ( 'epth of suspension 1%$ %$$mm   1 -r 

     

    G?$ 3-(+ 3TT*-

    6la5ed >all 3artitions  

    3artitions  

    ; ?2$$mm high 1$ m

     

    C!rr"#$ %& C&''#(%"&)  6#!%") /

    OFFICE BUILDING DrA !r%"%"&)") 2/1E4C&)%$6

    6la5ed >all 3artitions 8Cont9d:  

    *penings extra over the partitions in which they occur   

     

    1 -r 

     

    GE$ '()*F-T0+( F3(-'(' C(+-6

    +inings  

    0 Ceilings, plain pattern   %7

    uspended circular bul!head comprising of 12.%mm thic!two level gypsum plasterboard suspended ceiling fixed onto7%mm wide galvanised iron main P furring channelframewor!. The finished ceiling should be taped, s!immed Psanded smooth for the final finishes. llow for recessedpelmets P cutouts for light fixtures, and all openingsreJuired for electrical, idth dimensions as per layout

    with modular glass panel provide frosted vinylstic!er/sunguard with hori5ontal pattern.

    6la5ed aluminium door in natural anodi5ed profiles andpregla5ed with &mm plain sheet glass overall si5e1,$$$ x 2,1$$mm high

    3AC tongued and grooved strip ceiling 1$mm thic!,incorporating Fclips fixing into to hardwood framing8measured separately:

    m2

    (xposed grid suspension system, &$$ x &$$ x 1%mmmineral fibre panels, semi recessed regular edge profile,predecorated finish, white laying in position in galvani5edsteel grid on galvani5ed adjustable wire hangers includingperimeter trims

  • 8/20/2019 The Headoffice - Bill - Blank

    15/44

     

    C 'epth of suspension 1%$ %$$mm   %E7

    C!rr"#$ %& C&''#(%"&)

     

    C*++(CT*-  

    3age -r. 2/1?

     

    3age -r. 2/1E

    LININGS / S@ETING / DR8 RTITIONINGTo ummary of 0ill -r. 2

     ITEM    JOB N0 Page N0L INDOS / DOORS /

    OFFICE BUILDING STIRS 2/1%

    L INDOS/DOORS/STIRS  

    +1$ >-'*> / **;+6indows in (xtruded luminium profile and glass  

    liding  

      Two bays overall si5e 2$$$ x 1%$$mm high " -r 

     

    0 Two bays overall si5e 2$$$ x 7%$mm high ? -r

    C *ne bay overall si5e #$$ x 12$$mm high 1 -r

    ' 'itto overall si5e #$$ x 7%$mm high 1& -r

    Ceilings fixing hangers at 12$$mm centres both ways totimber 

    m2

     luminium windows and window frames white colourprofiles factory gla5ed with &mm tinted sheet glass fixing inposition including fixtures and subframe in galvani5ed steelstandard fitting

  • 8/20/2019 The Headoffice - Bill - Blank

    16/44

     

    ooflights in 6lass and and stainless steel  

    (

    1 -r

    +2$ '** / rot hardwood in 9*dum9 species or other approved eJualtreated with preservative

    ;lush doors comprising hardwood s!eleton framing with&mm thic! internal Juality veneered plywood 8selected forclear varnish measured separately: covering on both sides

    and hardwood lipping on all edges

    >rot hardwood in 9*dum9 species or other approved eJualtreated with preservative

    3anelled doors 1$$mm wide stiles and top rail 1%$mm wideintermediate rail 2$$mm wide bottom rail all open rebatedand filled with 2$mm thic! hardwood panel

    >rot hardwood in 9*dum9 species or other approved eJualtreated with preservative

  • 8/20/2019 The Headoffice - Bill - Blank

    17/44

    0 E% x 1E%mm =ambs 1&" m

    C E% x 1E%mm +G>I / 0+FT'(  

    tainless teel

      solated balustrades ra!ing 1$$$mm high 2" m

    0 solated balustrades level ditto ? m

    C!rr"#$ %& C&''#(%"&)

    ;actory doorsets finished in spray oil paint finish externalfire rated purpose metal frames 1.&mm double rebated,standard extension pieces butt hinges mortice loc!sreference 8 from uperloc!, 3rimordial +td or other eJual:

    1$$$ x 2$?2mm height unit, to 1%$mm thic! wall, solidflush panel door by shopfitter, 7"% x 1#"2mm

    tainless steel balustrade 1$$$mm high overall consistingof &$mm diameter pipe top rail ? -r 2%mm diameter pipeintermediate rails %$mm diameter standards at 7%$mmcentres all welded together, ends plugged and screwed toconcrete

  • 8/20/2019 The Headoffice - Bill - Blank

    18/44

    C*++(CT*-

    3age -r. 2/1%

    3age -r. 2/1&

    3age -r. 2/17

    L INDOS/DOORS/STIRS

    To ummary of 0ill -r. 2

     ITEM    JOB N0 Page N0

    OFFICE BUILDING SURFCE FINIS@ES 2/1"

    SURFCE FINIS@ES  

    Cement and sand 814?: one coat floated  

    ;loors  

      7%mm thic! level and to falls H 1%L from hori5ontal 7?2

    Treads  

    0 ?$mm thic! ?$$mm width E% m

    isers  

    C 12mm thic! 17$mm high %$ m

    )1$ C()(-T 4 -' / C*-C(T( C((' /T*33-6

    m2

  • 8/20/2019 The Headoffice - Bill - Blank

    19/44

     

    trings  

    ' 12mm thic! ?%$mm wide ra!ing 2" m

    oofs  

    ( %$mm thic! level and to falls H 1%L from hori5ontal 21

    Cement and sand 814E: one coat trowelled  

    >alls

    ;   7"?

    6 'itto width H ?$$mm do   2"? m

    Ceiling

    <

      E2

    solated column

    = 2$mm thic! render width D ?$$mm on concrete 27&

    C!rr"#$ %& C&''#(%"&)  

    ITEM    JOB N0 Page N0

    Sr!(# F")"1>#1

    OFFICE BUILDING 4C&)%$6 2/1#

    )2$ 3lastered / endered / oughcast Coatings 8Cont9d:  

    Cement and sand 814E: one coat floated  

    >alls

     

      ?%7

    0 'itto width H ?$$mm do   1&% m

    Cement and sand 814?: mixed with approved waterproofadditive one coat trowelled external

    m2

    )2$ 3+T((' / (-'((' / *F6

  • 8/20/2019 The Headoffice - Bill - Blank

    20/44

     

    >alls  

    C 3lain width D ?$$mm   ?%7

    ' 'itto width H ?$$mm do   1&% m

    ;loors  

    ( +evel or to falls H 1%L from hori5ontal to concrete plain E2

    ;loors  

    ; +evel or to falls H 1%L from hori5ontal to concrete plain $

    !irting  

    6 1$$mm high 2#& m

    Treads  

    < ?$$mm width with nonslip tile strip nosing E% m

    isers  

    = 1%$mm high %$ m

    C!rr"#$ %& C&''#(%"&)  

    ITEM    JOB N0 Page N0

    Sr!(# F")"1>#1

    OFFICE BUILDING 4C&)%$6 2/2$

    (xtra over   

     ccessories  

       luminium round cover strips to edges of tiles 2"? m

    )&$ 3-T-6 / C+( ;-

  • 8/20/2019 The Headoffice - Bill - Blank

    21/44

     

    6eneral surfaces  

    0 6irth D ?$$mm 1,?1#

    6eneral surfaces  

    C >alls 6irth D ?$$mm 1,$$1

    ' Ceilings 6irth D ?$$mm E2

    ( Column 6irth D ?$$mm 27&

    6eneral surfaces  

    ; >alls 6irth D ?$$mm ?$2

    6eneral surfaces  

    6 6irth H ?$$mm application on site prior to fixing 2#

    6eneral surfaces  

    < 6irth D ?$$mm 1?#

    = 6irth H ?$$mm E"

    C!rr"#$ %& C&''#(%"&)  

    ITEM    JOB N0 Page N0

    Sr!(# F")"1>#1

    OFFICE BUILDING 4C&)%$6 2/21

    )&$ 3ainting / Clear ;inishing 8Cont9d:  

    3repare and apply two coats of enamel gloss oil paint  

    6eneral surfaces of structural metalwor!

      6irth D ?$$mm 1%$

    C!rr"#$ %& C&''#(%"&)

    m2

    3repare and apply two undercoats, one finishing coat of99CoralplusN crylic (mulsion 3aint on cement render 

    m2

    m2

    m2

    3repare and apply two undercoats, one finishing coat of99Coral wallguardN crylic (mulsion 3aint on cement render 

    m2

    3repare and apply one coat of luminium primer onwoodwor!

    m2

    3repare and apply two coats of NCoral99 -itrocellulose sealer

    and three coats of NCoralN Coramar 3olyurethane atin)arine varnish on woodwor!4

    m2

    m2

    m2

  • 8/20/2019 The Headoffice - Bill - Blank

    22/44

     

    C*++(CT*-  

    3age -r. 2/1"

    3age -r. 2/1#

    3age -r. 2/2$

    3age -r. 2/21

     

    SURFCE FINIS@ES

    To ummary of 0ill -r. 2

     ITEM    JOB N0 Page N0

    N FURNITURE /

    OFFICE BUILDING EUIENT 2/22

    N FURNITURE / EUIENT  

    )irrors 0..#%2, clear float, 6, silvered P protected  with copper bac!ing, undercoat paint and stoved

    enamel  

    -1$ 6(-(+ ;@TF( / ;F-

  • 8/20/2019 The Headoffice - Bill - Blank

    23/44

     

      E%$ x &$$mm holes E edges bevelled 11 -r

    3*T0+( ;( (@T-6F

  • 8/20/2019 The Headoffice - Bill - Blank

    24/44

     

     

    1 -r

    -1? -TI 33+-C( / ;TT-6  

    011 -r

    C

    11 -r

     utomatic hand drier   

    '

    11 -r

    C!rr"#$ %& C&''#(%"&)  

    ITEM    JOB N0 Page N0

    N Fr)"%r# / E";m#)%

    OFFICE BUILDING 4C&)%$6 2/2E

    -1? anitary ppliances / ;ittings 8Cont9d:  

    'ouble bowl, single drain stainless steel cabinet sin! unitcomplete with 1?mm dia. )ixer flipup tap unit. E$mm dia.waste outlet with chain and plug E$mm dia. bottle trap. llfittings shall be chromium plated.

    &$$ x 1?$$mm fixing to masonry sealing at bac! withmastic sealant

    upply and nstall the following ;ixtures )a!e Twyfords, rmitage han!s or other approved eJuivalent

    >ash basins white vitreous china to 0.?E$2 ?2mmchromium plated slotted waste, chain, stay and plug to0.??"$ ?2mm stainless steel bottle trap paintedcantilever brac!ets 1?mm chrome plated )ixer flipup tapsto 0.1$1$

    %&$ x E1%mm fixing brac!ets to masonry with screwssealing at bac! with mastic sealant

    Close coupled >C. suite, hori5ontal outlet white vitreouschina pan # litre wall hung white vitreous cistern to0.?E$2 plastic float operated valve with or 3 trap outletconnector plastics seat and cover with stainless steelhinges

    fixing pan and cistern to masonry with screws beddingpan in mastic jointing pan to soil pipe with outletconnector 

    >hite thermoplastic outer case with class doubleinsulating Compact high performance fan with noiselevel not exceeding &"d0 at 1.%m. Q-o Touch afetyCutout and safety time. ating4 1.E Gw operation9

  • 8/20/2019 The Headoffice - Bill - Blank

    25/44

     

    +iJuid soap dispenser as 06(++. Capacity4 2 +ts

      fixing to masonry with screws 11 -r

    Toilet roll holder stainless steel  

    0 1%$ x 7&mm fixing to masonry with screws 11 -r

    Towel rail stainless steel  

    C &%$mm long fixing to masonry with screws 11 -r

    C!rr"#$ %& C&''#(%"&)  

    C*++(CT*-

    3age -r. 2/22

    3age -r. 2/2?

    3age -r. 2/2E

    N FURNITURE / EUIENT

    To ummary of 0ill -r. 2

     ITEM   JOB N0 Page N0 

      BUILDING FBRICOFFICE BUILDING SUNDRIES 2/2%

     

     ccessories T=A&r$1 rm"%!# S>!)1 or approvedeJual,

  • 8/20/2019 The Headoffice - Bill - Blank

    26/44

    BUILDING FBRIC SUNDRIES

     

    *G - C*--(CT*- >T< 33('F33+I IT()

    Cut chase in sandcrete bloc!wor! for pipe ma!e good allwor! disturbed

  • 8/20/2019 The Headoffice - Bill - Blank

    27/44

     

    3?2

  • 8/20/2019 The Headoffice - Bill - Blank

    28/44

     

    R DISOSL S8STES  

    1$ ->T( 33(>*G /6FTT(  

    3ipes staright supports at average 1$$$mm centres  

     

    1$1 m

    0 (xtra shoes & -r

    C 'itto bends 12 -r

    oof outlets as ;ulbora or other approved eJual  

    ' outlet spigot solvent welded joint to plastic & -r

    6utters straight supports at average 1$$$mm centres  

    (

    %# m

    ; (xtra angles E -r

    11 ;*F+ '-6( 0*A( 6*F-'  

    3ipes straight

    6

    ?" m

    < 1$$mm diameter in concrete or bloc!wor! 1" m

    =

    %# m

    G %$mm diameter in concrete or bloc!wor! 22 m

    + ?2mm diameter ditto 1% m

    C!rr"#$ %& C&''#(%"&)  

    ITEM    JOB N0 Page N0

    B"'$") F!:r"(

    F3AC sJuare section pipes and fittings, 0 E%1E solvent

    welded joints ipewor! and supports self coloured white

    "$ x "$mm in standard holderbats fixing to bloc!wor!with galvanised screws

    F3AC box gutters and fittings push fit connector jointsgutterwor! and supports self coloured white

    1%$ x 1$$mm in standard fascia brac!ets fixing totimber with galvanised screws

    upply and install the following class 909 upvc pipes andfittings with solvent cement.

    1$$mm diameter fixed to concrete with aluminium clipsat 1.1$m centres in ducts

    %$mm diameter fixed to concrete with aluminium clips at1.1$m centres in ducts

  • 8/20/2019 The Headoffice - Bill - Blank

    29/44

    OFFICE BUILDING S)$r"#1 2/2"

    4C&)%$6

    11 ;oul 'rainage bove 6round  

    tems extra over

      E$ -r

    0 1% -r

    C 2$ -r

    ' fittings, pipe D &%mm diameter three ends 12 -r

    ( ?2 -r

    ; fittings, pipe D &%mm diameter swept tee, three ends ? -r

    C!rr"#$ %& C&''#(%"&)

     

    C*++(CT*-  

    3age -r. 2/27

     

    3age -r. 2/2"

     

    R DISOSL S8STES

    To ummary of 0ill -r. 2

     ITEM    JOB N0 Page N0

    upply and install the following class 909 upvc pipes andfittings with solvent cement.

    fittings, pipe H &%mm diameter two ends

    fittings, pipe H &%mm diameter three ends

    fittings, pipe H &%mm diameter floor drains

    fittings, pipe D &%mm diameter #$$ bend, two ends

  • 8/20/2019 The Headoffice - Bill - Blank

    30/44

    OFFICE BUILDING S IED SUL8 S8STE  2/2#

    S IED SUL8 S8STES  

    1$ C*+' >T(  

    3ipes straight

      E$mm diameter in concrete or bloc!wor! ?& m

    0 ?2mm diameter ditto #" m

    C 2%mm diameter ditto EE m

    ' 2$mm diameter ditto E" m

    ( 1%mm diameter ditto E7 m

    tems extra over

    ; %2 -r

    6 17 -r

    < ;lexible connector 2% -r

    3ipewor! ancillaries

    =

    ? -r

    G

    & -r

    +

    7 -r

    )1 -r

    -

    # -r

    3

    2& -r

    M

    2& -r

    C!rr"#$ %& C&''#(%"&)  

    upply and install the following class 9C9 upvc pipes andfittings with solvent cement.

    fittings, pipe H &%mm diameter two ends

    fittings, pipe H &%mm diameter three ends

    top valves nominal si5e E$mm fixed to pvc pipe inconcrete/bloc!wor!

    top valves nominal si5e ?2mm fixed to pvc pipe inconcrete/bloc!wor!

    top valves nominal si5e 2%mm fixed to pvc pipe inconcrete/bloc!wor!

    -on return valve nominal si5e E$mm fixed to pvc pipein concrete/bloc!wor!

    top valves nominal si5e 2$mm fixed to pvc pipe inconcrete/bloc!wor!

    Chec! valves nominal si5e 1%mm fixed to pvc pipe inconcrete/bloc!wor!

    -on return valve nominal si5e 1%mm fixed to pvc pipein concrete/bloc!wor!

  • 8/20/2019 The Headoffice - Bill - Blank

    31/44

     ITEM    JOB N0 Page N0

    S ";#$ S;;'A SA1%#m

    OFFICE BUILDING 4C&)%$6 2/?$

    1$ Cold >ater 8Cont9d:  

    upply and install the following4

    (Juipment

      Cold water storage cistern plastic

    -ominal Capacity 4 &,$$$ +itres with the ff4 accessories

    i: 2%mm dia. nlet connector with ballvalve

    iii: 2%mm dia. *utlet connector

    iii: %$mm dia. drain / overflow connectors 1 -r

    0 Cold water storage cistern plastic

    -ominal Capacity 4 &,$$$ +itres with the ff4 accessoriesi: 2%mm dia. nlet connector with ballvalve

    iii: 2%mm dia. *utlet connector

    iii: %$mm dia. drain / overflow connectors 2 -r

    C  utomatic Cold >ater 0ooster 3umpset complete

    with float switch as '0 2=et 2%1) or approved eJual

    'ischarge 4 1.$ l/s

  • 8/20/2019 The Headoffice - Bill - Blank

    32/44

     ITEM    JOB N0 Page N0

    S ";#$ S;;'A SA1%#m

    OFFICE BUILDING 4C&)%$6 2/?1

    &$ ;(

  • 8/20/2019 The Headoffice - Bill - Blank

    33/44

     

    S IED SUL8 S8STES

    To ummary of 0ill -r. 2   -

    ITEM    JOB N0 Page N0

    U VENTILTION / IR

    OFFICE BUILDING CONDITIONING S8STES 2/?2

    U VENTILTION / IR CONDITIONING S8STES  

    F1$ 6(-(+ A(-T+T*-  

      Capacity 4 %$cfm

    3ower 4 ;ractional hp 3- %$

  • 8/20/2019 The Headoffice - Bill - Blank

    34/44

    6 'itto

    +ength 4 11 m 2 -r

    C!rr"#$ %& C&''#(%"&)  

    ITEM    JOB N0 Page N0

    U V#)%"'!%"&) / "r

    OFFICE BUILDING C&)$"%"&)") SA1%#m1 2/??4C&)%$6

    F&$ ir Conditioning Fnits 8Cont9d:  

    efrigerant 3iping 8Cont9d:

      uction +ine i5e4 1&mm *'

    +iJuid +ine i5e 4 &mm *'+ength 4 1$ m ? -r

    0 'itto

    +ength 4 & m 7 -r

    'itto

    +ength 4 E m " -r

    C*-'(-T( '-6(

    upply and install the following class 909 upvc pipes

    and fittings

    C 2$mm dia. upvc pipe %E -r

    ' 1%mm dia. 'itto 72 -r

    ( ? -r

    ; 1%mm dia. ditto E" -r

    6 2$mm x 2$mm x 1%mm reducing tee 22 -r

    < 2$mm dia. running trap with %$mm water seal 2E -r

    (+(CTC+ >-6

    upply and install the following4

    =

    ?&" m

    G

    2E& m

    upply and install the following precharged and insulatedrefrigerant as before described

    2$mm dia. x #$* elbow

    (lectrical wiring from building solator to condensing unitCable i5e4 ? x E.$mm2

    3ac!aged electrical cabling from condensing unit to fancoil units Cable si5e4 ? x 2.%mm2

  • 8/20/2019 The Headoffice - Bill - Blank

    35/44

    C!rr"#$ %& C&''#(%"&)  

    ITEM    JOB N0 Page N0U V#)%"'!%"&) / "r

    OFFICE BUILDING C&)$"%"&)") SA1%#m1 2/?E

    4C&)%$6

    C*++(CT*-

    3age -r. 2/?2

    3age -r. 2/??

     

    U VENTILTION / IR CONDITIONING S8STES

    To ummary of 0ill -r. 2  6

  • 8/20/2019 The Headoffice - Bill - Blank

    36/44

     ITEM    JOB N0 Page N0

    V ELECTRICL SUL8 /

    OFFICE BUILDING OER LIG@TING 2/?%

    S8STES

    V ELECTRICL SUL8 / OER LIG@TING S8STES

     

    A2$ +A 'T0FT*-  

    LV C!:'#1 !)$ "r")

    3olyvinylchloride material jointed in solvent cement in

      %$mm diameter rigid straight in concrete floor

    or bloc! wall 71 m

    0 (xtra over the conduit in which they occur

    1%$mm x 1%$mm junction boxes % -r

    N3ilcaN type swa/pvc insulated copper in

    CablesC 7% m

    ' "" m

    ( ?1E

    Connections

    ; 1& -r

    6 & -r

    < E -r

    = 2 -r

    LV S="%(>#!r !)$ D"1%r":%"&) :&!r$1  

    G

    1 -r

    + 2$$ T3- switch with

  • 8/20/2019 The Headoffice - Bill - Blank

    37/44

    )

    E -r

    - 2$$ T3- cutout unit 1 -r

    3 &?, T3 )CC0, c/w (nclosure 8F3 ncomer: E -r

    M 2$$ utomatic Change over witch 1 -r

    C!rr"#$ %& C&''#(%"&)  

    ITEM    JOB N0 Page N0

    V E'#(%r"(!' S;;'A /

    OFFICE BUILDING &=#r L">%") SA1%#m1 2/?&

    4C&)%$6

    A21 6(-(+ +6all 0rac!et compact fluorescent c/w *pal'iffuser 

    2 x "w 9T+9' fluorescent selfcontained, nonmaintained?hour prismatic diffuser emergency fittings, c/w N(@TN3ictogram

  • 8/20/2019 The Headoffice - Bill - Blank

    38/44

    ((#11&r"#1 &r E'#(%r"(!' S#r?"(#1  

  • 8/20/2019 The Headoffice - Bill - Blank

    39/44

    C!rr"#$ %& C&''#(%"&)

    C*++(CT*-

    3age -r. 2/?%

    3age -r. 2/?&

    3age -r. 2/?7

     

    V ELECTRICL SUL8 / OER LIG@TING S8STES

    To ummary of 0ill -r. 2   -

    ITEM    JOB N0 Page N0

    COUNICTION /

    OFFICE BUILDING SECURIT8 / CONTROL 2/?"

    S8STES

    COUNICTION / SECURIT8 / CONTROL S8STES

     

    >1$ T(+(C*))F-CT*-  

      2$mm 3vc pipe ?&& m

    0 2$mm 3vc Circular box E$ -r

    C 7%mm x 7%mm 6alvani5ed conduit box &$ -r

    ' %$pair wall mounted Telephone 0T

    8Terminal 0loc!: 2 -r

    ( 2E 3ort 3atch 3anel 1 -r

    ; Category %e 'ata Cable E71 m

    6 2 6ang =11 Telephone soc!et outlet 21 -r

    < ?$$mm x 1%$mm 3vc =unction 0ox with cover E -r

    >2$ '* / TA / CCTA  

    CCTV INSTLLTIONS  

    upply and install the following CCTA system

    = 2E Channel tream 'A 1 -r

    G +ow lux 'ay P -ight Camera " -r

    + 'ome Camera E -r

    upply and install internal and external TelephoneCommunication eJuipment and accessories as follows4

  • 8/20/2019 The Headoffice - Bill - Blank

    40/44

    ) 2&99 )onitor 8+(': 1 -r

    - 3ower supply units 1 -r

    3 Coaxial P 3ower supply cable %&" m

    M 2$mm 3AC pipe E%% m

    EF >all mounted cabinet 1 -r

    Testing, Commissioning P 3rogramming

     

    C!rr"#$ %& C&''#(%"&)  6

  • 8/20/2019 The Headoffice - Bill - Blank

    41/44

     

    M Category &e 'ata Cable EE2 m

    ?$$mm x 1%$mm 3vc =unction 0ox with cover 2 -r

    C!rr"#$ %& C&''#(%"&)  

    ITEM    JOB N0 Page N0

    C&mm)"?!%"&) /OFFICE BUILDING S#(r"%A / C&)%r&' SA1%#m1 2/E$

    4C&)%$6

    >%$ ;( '(T(CT*- -' +)

      &Rone conventional control panel complete with

    integral battery, charger and other reJuisite

    accessories. 1 -r

    0 *ptical mo!e ensor complete with

    mounting base ?$ -r

    C 'itto but %1 (T

  • 8/20/2019 The Headoffice - Bill - Blank

    42/44

    G

    ?" m

    +

    " -r

    )

    1 -r

    - (arth nspection chamber, c/w concrete cover. 1 -r

    C!rr"#$ %& C&''#(%"&)  

    ITEM    JOB N0 Page N0 C&mm)"?!%"&) /

    OFFICE BUILDING S#(r"%A / C&)%r&' SA1%#m1 2/E1

    4C&)%$6

    >%2 +6++ Cat -o. )3C 1&: 2 -r

    0 2$$$m +ong 1&mm thread diameter copper

    elevation rod. 8ef4 .-. >++ Cat -o. (17$: 2 -r

    C 2%mm x ?mm 6unmetal sJuare tape clamp " -r

    ' 2%mm x ?mm Copper tape down conductor

    8ef4 .-. >++ Cat -o. T+2%?: 1$$ m

    ( -aval 0rass metallic 'C tape clip complete

    with clip and plug 1$$ -r

    ; #$$mm x #$$mm ++ Cat -o. ()+#$?: 2 -r

    6 1&mm diameter, 12$$mm long copper bonded

    earth electrode cad welded to four corners of

    earth mat

    8ef4 .-. >++ Cat -o. (012: " -r

    < 2%mm x ?mm 6unmetal screw down test

    clam 8ef4 .-. >++ Cat -o. =6 2%?: 2 -r

    ?%mm2, bonded to the main switch or maindistributionboard and an earth electrode 8distribution board andelectrode measured separately:

    1&mm diameter, 1%$$mm long copper bonded earthelectrode c/w clamps

    &mm x E$mm x ?$$mm (arth 0ar mounted on nsulators

    on wall.

    upply and install a lightning protection system comprisingeJuipment and materials manufactured by )essrs . -.>++ or any other approved manufacturer as follows4

  • 8/20/2019 The Headoffice - Bill - Blank

    43/44

    C!rr"#$ %& C&''#(%"&)  

    C*++(CT*-

    3age -r. 2/?7

    3age -r. 2/?"

    3age -r. 2/?#

    3age -r. 2/E1

     

    COUNICTION / SECURIT8 / CONTROL S8STES

    To ummary of 0ill -r. 2

     ITEM    JOB N0 Page N0

    OFFICE BUILDING SUR8 2/E2

    GE BILL Nr. 2 - SUR8

    NR

     2/2 C (@T-6 T( / 0F+'-6 / (AC(

     2/? 6*F-' >*G  

    2/& (. -TF C*-C(T( / +6( 3(CT C*-C(T(  

    2/7 ;. )*-I  

    2/1$ < C+''-6 / C*A(-6  

    2/12 = >T(3**;-6  

    2/1? G +--6 / /'**/T  

    2/1# ). F;C( ;-

  • 8/20/2019 The Headoffice - Bill - Blank

    44/44

     2/2& 3 0F+'-6 ;0C F-'(  

    2/2" . '3*+ IT()  

    2/?1 33(' F33+I IT()  

    2/?E F A(-T+T*- / C*-'T*--6 IT()  

    2/?7 A. (+(CTC+ F33+I / 3*>( +6 C*))F-CT*- / (CFTI / C*-T*+ IT()

     

    BILL Nr. 2 - OFFICE BUILDING

    Carried to 6eneral ummary   -