The content of TAF TSI: RU functions and Legal Obligations ERA ...

Post on 12-Feb-2017

222 views 0 download

Transcript of The content of TAF TSI: RU functions and Legal Obligations ERA ...

The content of TAF TSI: RU functions and Legal Obligations

ERA Telematics Team

Rome, 7th and 8th June 2016

4th ERA TAF TSI Regional Workshop (Italy, Slovenia and Croatia)

TAF TSI Regulation:

RU functions

4th ERA TAF TSI Regional Workshop (Italy, Slovenia and Croatia)

COMMISSION REGULATION (EU) No 1305/2014 of 11 December

2014 on the technical specification for interoperability relating to

the telematics applications for freight subsystem of the rail system

in the European Union and repealing the Regulation (EC) No

62/2006

Commission Regulation (EU) No 1305/2014: TSI TAF

4th ERA TAF TSI Regional Workshop (Italy, Slovenia and Croatia)

TAF TSI process

Consignment Note

Wagon trip plan

Path Allocation

Train Preparation

Train Running Forecast

Wagon Movement

Post-Trip

-Wagon loads

-Wagon release

-Price and

transit times

-Wagon

status and

location

-Open

Access

-One Stop

Shop

-Train

Composi-

tion

-Train

Running

-Service

Disruption

-To improve

the quality

and

producti-

vity

TAF TSI published on EU Journal: COMMISSION REGULATION

(EU) No 1305/2014

-Estimated

Time of

Arrival

(ETA)

-Estimated

Time for

Interchange

(ETI)

Planning… Operation… After…

4th ERA TAF TSI Regional Workshop (Italy, Slovenia and Croatia)

TAF TSI – EU 1305/2014 -> Process?

› Processes for Railway Undertakings:

› 4.2.1. Consignment Note data (ERA-TD-100 – Annex A.5 -http://www.era.europa.eu/Document-Register/Pages/TAF-TSI.aspx )

› 4.2.6. Shipment ETI/ETA (ERA-TD-100 – Annex A.5 -http://www.era.europa.eu/Document-Register/Pages/TAF-TSI.aspx )

4th ERA TAF TSI Regional Workshop (Italy, Slovenia and Croatia)

TAF TSI – EU 1305/2014 -> Wagon Movement

› 4.2.7. Wagon Movement : For the reporting of the movementof a wagon:

Wagon Release notice Wagon Departure notice Wagon Yard arrival Wagon Yard departure Wagon Exceptions message Wagon Arrival notice Wagon Delivery notice

4th ERA TAF TSI Regional Workshop (Italy, Slovenia and Croatia)

TAF TSI – EU 1305/2014 -> Interchange Reporting

› 4.2.8. Interchange Reporting : transfer ofresponsibility for a wagon between two railwayundertakings at interchange points:

Wagon Interchange Notice Wagon Interchange Sub Notice Wagon Received At Interchange Wagon Refused At Interchange

4th ERA TAF TSI Regional Workshop (Italy, Slovenia and Croatia)

TAF TSI – EU 1305/2014 -> Other Databases

› 4.2.11.2. Other Databases - Wagon and Intermodal UnitOperational Database:

It shows the movement of a wagon and of an Intermodal unitfrom departure through to final delivery at customer sidings.

ETIs and actual times at different locations until the finaldelivery time ETA.

Different status of the rolling stock (loading of the rolling stock, empty wagon on journey, …).

4th ERA TAF TSI Regional Workshop (Italy, Slovenia and Croatia)

TAF TSI – EU 1305/2014 -> Other Databases

› 4.2.11.2. Other Databases - Wagon Trip Plan Databases:

For each wagon the Lead RU (RU acting as ServiceIntegrator) must establish and update a trip plan whichcorresponds to the train path at train level.

New train paths for a train in case of service interruptions.

The Wagon Trip Plans must be stored by each LRU in adatabase.

4th ERA TAF TSI Regional Workshop (Italy, Slovenia and Croatia)

TAF TSI – EU 1305/2014 -> Wagon Tracking

Wagon Data + Train Location -> Wagon Tracking

WIMO

Train Running Forecast

Train Composition message

4th ERA TAF TSI Regional Workshop (Italy, Slovenia and Croatia)

› Better management of the wagon fleet: improvements in its utilisation &potential reduction of the fleet.

› Direct benefits due to the reduced wagon prices.

› Empty wagon movement reduction from 45 to 20% -> reduce operationcosts for RUs.

› Increase in system maintenance.

Expected Benefits for RUs!

4th ERA TAF TSI Regional Workshop (Italy, Slovenia and Croatia)

Thank you! Хвала вам! Teşekkür ederim! Ačiū! Vielen Dank!

ERA TELEMATICS TEAM

: rodrigo.gutierrez@era.europa.eu

mickael.varga@era.europa.eu

4th ERA TAF TSI Regional Workshop (Italy, Slovenia and Croatia)

Back – Up Slides

4th ERA TAF TSI Regional Workshop (Italy, Slovenia and Croatia)

Architecture to exchange data?

› Communication « Peer to peer » (Internet – IP network) CentralRepository and an individual Common Interface (CI)

RU

IM

WK -RSRD

4th ERA TAF TSI Regional Workshop (Italy, Slovenia and Croatia)

TAF TSI – EU 1305/2014 -> Wagon Movement

› 4.2.7. Wagon Movement (ERA-TD-100 – Annex A.5 -http://www.era.europa.eu/Document-Register/Pages/TAF-TSI.aspx ):

4th ERA TAF TSI Regional Workshop (Italy, Slovenia and Croatia)

TAF TSI – EU 1305/2014 -> Process ?

› 4.2.1. Consignment Note data (ERA-TD-100 – Annex A.5 -http://www.era.europa.eu/Document-Register/Pages/TAF-TSI.aspx ):

4th ERA TAF TSI Regional Workshop (Italy, Slovenia and Croatia)

TAF TSI – EU 1305/2014 -> Shipment ETI/ETA

› 4.2.6. Shipment ETI/ETA (ERA-TD-100 – Annex A.5 -http://www.era.europa.eu/Document-Register/Pages/TAF-TSI.aspx ):

4th ERA TAF TSI Regional Workshop (Italy, Slovenia and Croatia)