Slomin Foundation & School of Autism Campus

Post on 20-May-2015

1.104 views 9 download

Tags:

description

Design for the Slomin Foundation & School of Autism Campus in Boynton Beach, Fl. This is a one of a kind facility in the USA for research, development and implementation of studies for ASD. The foundation will house 200 students and faculty with auxillary fuctions and playfields, gymnasium and natatorium along with the Foundation's Headquarters and research institute.

Transcript of Slomin Foundation & School of Autism Campus

ARCHITECTURE URBAN DESIGN PLANNING INTERIORS

The Palm Beach County

Sandra C. SlominSchool & Foundation for Autism3005 S Congress Ave. Boynton Beach, Fl.

Master Plan & Facility Design

July 2, 2009 2OCAMPO & ASSOCIATES

Autism is a brain development disordercharacterized by impaired social interactionand communication, and by restricted and repetitive behavior.

July 2, 2009 3OCAMPO & ASSOCIATES

MASTER SITE PLAN SCHEME B

July 2, 2009 4OCAMPO & ASSOCIATES

Existing Boynton Beach Site

July 2, 2009 5OCAMPO & ASSOCIATES

PROGRAM REQUIREMENTS:• SCHOOL FACILITY (MAX 200 STUDENTS) 25,000 SF• SLOMIN FOUNDATION HEADQUARTERS FACILITY 25,000 SF• GYMNASIUM BUILDING 8,500 SF• NATATORIUM BUILDING 6,000 SF• OUTDOOR FIELDS TBD• TOTAL 54,500 SF

FACILITIES PROVIDED:• SCHOOL FACILITY (MAX 200 STUDENTS) 35,198 SF• SLOMIN FOUNDATION HEADQUARTERS FACILITY 26,258 SF• GYMNASIUM BUILDING 8,500 SF• NATATORIUM BUILDING 6,000 SF• OUTDOOR FIELDS TBD• TOTAL 61,456 SF

July 2, 2009 6OCAMPO & ASSOCIATES

The CONCEPT AnalysisBefore 159 Parking Spaces Requirement

July 2, 2009 7OCAMPO & ASSOCIATES

The CONCEPT AnalysisPlus 159 Parking Spaces +/-

July 2, 2009 8OCAMPO & ASSOCIATES

The Master Plan CONCEPTAlternative A

July 2, 2009 9OCAMPO & ASSOCIATES

The Master Plan CONCEPTAlternative B

July 2, 2009 10OCAMPO & ASSOCIATES

The Master Plan CONCEPT (Alternative C)

July 2, 2009 11OCAMPO & ASSOCIATES

The Master Plan CONCEPT B

The Campus Design Concept Must:• Address the Uniqueness of the Autism School Program. • Address the Uniqueness of the Autism Campus Concept (One Stop

Shop) & the Connectivity of its functions.• Address the Need to Introduce Natural Light as a “special” benefit to

the Occupants.• Address the special spatial and orientation needs created by ASD.• Address Constraint of a “tight” site which must accommodate the very

high parking count required due to the unique teacher / student ratio.• Address the desire to develop a Concept that is environmentally

sensitive, sustainable (based on cost / benefit) and be “GREEN”. • Be capable of raising the community awareness (if not “national”

awareness) of ASD.

July 2, 2009 12OCAMPO & ASSOCIATES

MASTER SITE PLAN SCHEME B

PLAY FIELDS

SCHOOL HOUSE

SLOMIN FOUNDATION

GYM

NATATORIUM

FOUNDATIONPLAZA

PARENT DROP OFF

July 2, 2009 13OCAMPO & ASSOCIATES

MASTER SITE PLAN SCHEME C

PLAY FIELDS SCHOOL

HOUSE

SLOMIN FOUNDATION

SLOMIN FOUNDATION

OVERGYM

FOUNDATIONPLAZA

PARENT DROP OFF

July 2, 2009 14OCAMPO & ASSOCIATES

PHASE 1 PLANS

July 2, 2009 15OCAMPO & ASSOCIATES

FUNCTIONAL DIAGRAM

July 2, 2009 16OCAMPO & ASSOCIATES

July 2, 2009 17OCAMPO & ASSOCIATES

July 2, 2009 18OCAMPO & ASSOCIATES

July 2, 2009 19OCAMPO & ASSOCIATES

PHASE 1 ELEVATIONS

July 2, 2009 20OCAMPO & ASSOCIATES

July 2, 2009 21OCAMPO & ASSOCIATES

July 2, 2009 22OCAMPO & ASSOCIATES

July 2, 2009 23OCAMPO & ASSOCIATES

July 2, 2009 24OCAMPO & ASSOCIATES

PHASE 1 RENDERINGS

July 2, 2009 25OCAMPO & ASSOCIATES

School House Building SCHEME B

July 2, 2009 26OCAMPO & ASSOCIATES

Cross Section SCHEME B

July 2, 2009 27OCAMPO & ASSOCIATES

Transverse Section SCHEME B

July 2, 2009 28OCAMPO & ASSOCIATES

Cross Section SCHEME B

July 2, 2009 29OCAMPO & ASSOCIATES

Detail at Atrium SpaceSCHEME B

July 2, 2009 30OCAMPO & ASSOCIATES

PHASE 2 ELEVATIONS

July 2, 2009 31OCAMPO & ASSOCIATES

July 2, 2009 32OCAMPO & ASSOCIATES

PHASE 2 MASTER PLAN

July 2, 2009 33OCAMPO & ASSOCIATES

MASTER SITE PLAN SCHEME B

July 2, 2009 34OCAMPO & ASSOCIATES

MASTER SITE PLAN SCHEME B

July 2, 2009 35OCAMPO & ASSOCIATES

PHASE 2 RENDERINGS

July 2, 2009 36OCAMPO & ASSOCIATES

School House Entrance SCHEME B

July 2, 2009 37OCAMPO & ASSOCIATES

Campus Entrance SCHEME B

July 2, 2009 38OCAMPO & ASSOCIATES

View of Entry Plaza SCHEME B

July 2, 2009 39OCAMPO & ASSOCIATES

Cross Section of Foundation Building SCHEME B

July 2, 2009 40OCAMPO & ASSOCIATES

View of Natatorium Building SCHEME B

July 2, 2009 41OCAMPO & ASSOCIATES

Cross Section of Natatorium Building SCHEME B

July 2, 2009 42OCAMPO & ASSOCIATES

Cross Section of Natatorium & Gym Building SCHEME B

July 2, 2009 43OCAMPO & ASSOCIATES

View of Natatorium Building SCHEME B

July 2, 2009 44OCAMPO & ASSOCIATES

View of Natatorium Building SCHEME B

July 2, 2009 45OCAMPO & ASSOCIATES

Cross Section of Gymnasium Building SCHEME B

July 2, 2009 46OCAMPO & ASSOCIATES

Rear View of Foundation Building SCHEME B

July 2, 2009 47OCAMPO & ASSOCIATES

MASTER SITE PLAN SCHEME B

July 2, 2009 48OCAMPO & ASSOCIATES

ALTERNATE MASTER PLAN

July 2, 2009 49OCAMPO & ASSOCIATES

MASTER SITE PLAN SCHEME C

PLAY FIELDS SCHOOL

HOUSE

SLOMIN FOUNDATION

SLOMIN FOUNDATION

OVERGYM

FOUNDATIONPLAZA

PARENT DROP OFF

July 2, 2009 50OCAMPO & ASSOCIATES

MASTER SITE PLAN SCHEME C

July 2, 2009 51OCAMPO & ASSOCIATES

View of Entry Plaza SCHEME C

July 2, 2009 52OCAMPO & ASSOCIATES

View of Natatorium & Gym SCHEME C

July 2, 2009 53OCAMPO & ASSOCIATES

Cross Section of Natatorium & Gym SCHEME C

July 2, 2009 54OCAMPO & ASSOCIATES

View of Rear of CampusSCHEME C

July 2, 2009 55OCAMPO & ASSOCIATES

MASTER PLANRECOMMENDATION

July 2, 2009 56OCAMPO & ASSOCIATES

MASTER SITE PLAN SCHEME B

ARCHITECTURE URBAN DESIGN PLANNING INTERIORS

This Presentation and its Content are the property of OCAMPO & ASSOCIATES, INC. and are protected by common copyright

law. No portion of this presentation may be reproduced in part or in its entirety without the written permission of

OCAMPO & ASSOCIATES, INC.