Slater Family Ice Arena
Bowling Green State University
Location: Bowling Green, Ohio
Client: General Contractor, Mosser Construction
Type of Project: Renovation
Background:
The conversation surrounding the renovation of this
ice facility started with the age and condition of the
rink along with the need to replace the R22
refrigeration system (a federal mandate that says R22
must be phased out by the year 2020).
Becker Arena Products was chosen to build a new dasher
system partnering on this project with Mosser
Construction, Stevens Engineers, Cimco Refrigeration and
The Slater Family Ice Arena .
Project Highlights:
-200 x 85 6.0A Signature Series Aluminum frame dasher
system
-Goal judge boxes
-Powder coated shield supports
-Kevlar protective netting
-Specially fabricated LED display panels
800-234-5522 WWW.BECKERARENA.COM
Side Story:
The University decided to rename the BGSU Ice
Arena to the Slater Family Ice Arena after
receiving a very generous donation from Scott
Slater to help with the renovation.
Quoting from an article written by Nolan
Rosenkrans (The Blade Newspaper) …
“Through the years, they have made the
university central to their lives with support
of BGSU hockey and many community
programs such as high school hockey and
figure skating
Mr. Slater said he considered an education the
most valuable asset one can have, while
athletics is important for building character.
“I think together when you have both of them
you have a great chance at being successful at
life.