Project Profile Slater Family Ice Arena Bowling Green State University Location: Bowling Green, Ohio Client: General Contractor, Mosser Construction Type of Project: Renovation Background: The conversation surrounding the renovation of this ice facility started with the age and condition of the rink along with the need to replace the R22 refrigeration system (a federal mandate that says R22 must be phased out by the year 2020). Becker Arena Products was chosen to build a new dasher system partnering on this project with Mosser Construction, Stevens Engineers, Cimco Refrigeration and The Slater Family Ice Arena . Project Highlights: -200 x 85 6.0A Signature Series Aluminum frame dasher system -Goal judge boxes -Powder coated shield supports -Kevlar protective netting -Specially fabricated LED display panels Side Story: The University decided to rename the BGSU Ice Arena to the Slater Family Ice Arena after receiving a very generous donation from Scott Slater to help with the renovation. Quoting from an article written by Nolan Rosenkrans (The Blade Newspaper) … “Through the years, they have made the university central to their lives with support of BGSU hockey and many community programs such as high school hockey and figure skating Mr. Slater said he considered an education the most valuable asset one can have, while athletics is important for building character. “I think together when you have both of them you have a great chance at being successful at life.

Transcript of Slater Family Ice Arena Bowling Green State...

Page 1: Slater Family Ice Arena Bowling Green State Universityfiles.constantcontact.com/f157d35e501/11a262ba-a94d-41f9-b1de-d… · Bowling Green State University Location: Bowling Green,

Project Profile

Slater Family Ice Arena

Bowling Green State University

Location: Bowling Green, Ohio

Client: General Contractor, Mosser Construction

Type of Project: Renovation

Background:

The conversation surrounding the renovation of this

ice facility started with the age and condition of the

rink along with the need to replace the R22

refrigeration system (a federal mandate that says R22

must be phased out by the year 2020).

Becker Arena Products was chosen to build a new dasher

system partnering on this project with Mosser

Construction, Stevens Engineers, Cimco Refrigeration and

The Slater Family Ice Arena .

Project Highlights:

-200 x 85 6.0A Signature Series Aluminum frame dasher

system

-Goal judge boxes

-Powder coated shield supports

-Kevlar protective netting

-Specially fabricated LED display panels

800-234-5522 WWW.BECKERARENA.COM

Side Story:

The University decided to rename the BGSU Ice

Arena to the Slater Family Ice Arena after

receiving a very generous donation from Scott

Slater to help with the renovation.

Quoting from an article written by Nolan

Rosenkrans (The Blade Newspaper) …

“Through the years, they have made the

university central to their lives with support

of BGSU hockey and many community

programs such as high school hockey and

figure skating

Mr. Slater said he considered an education the

most valuable asset one can have, while

athletics is important for building character.

“I think together when you have both of them

you have a great chance at being successful at

life.

Page 2: Slater Family Ice Arena Bowling Green State Universityfiles.constantcontact.com/f157d35e501/11a262ba-a94d-41f9-b1de-d… · Bowling Green State University Location: Bowling Green,

Slater Family Ice Arena page 2