Slab Construction With Tar Paper. Linear Geometric Fast Construction.

Post on 28-Mar-2015

220 views 0 download

Tags:

Transcript of Slab Construction With Tar Paper. Linear Geometric Fast Construction.

Slab Construction

With Tar Paper

• Linear• Geometric• Fast Construction

Tar Paper Process

Templates to Construction

Assembling

Assembling the Top

Foot

Cleaning

Now-SKETCH

• Start sketching your design-MINOR grade– (lots of detail, size specifications*, etc.)

• Important to have measurements. – Minimum size 6 inches tall or wide.

• Important to have surface decoration that compliments form. – Can be carved, additive, done with other objects

etc.