Shutdown Maintenance Turnaround Works in ExxonMobil
Plant Duration Jobs Completed Approx. Value
ExxonMobil July 07 - Aug 07 Furnace C Shutdown In progress
file:///tt/file_convert/55cf9bd9550346d033a79ad0/document.xls : Shell Page 2 of 16
Recent Shutdown Maintenance Turnaround Works in Shell Bukom, Singapore
Plant Duration Jobs Completed Approx. Value
LRCCU July 2006 Heat Exchangers S$ 1,000,000(Unplanned) Rotating & Stationary Equipment
Tower Tray RepairPiping ReplacementVessel CleaningFurnace / CO Boiler Repair RegeneratorMisc Hot & Cold Works
HCU 2006 Heat Exchangers S$ 800,000Tower Tray RenewalPiping ReplacementRotating EquipmentVessel Cleaning
LRCCU Dec 2005 Heat Exchangers S$ 500,000
Rotating & Stationary Equipment
Tower Tray Repair
Piping Replacement
Vessel Cleaning
Furnace / CO Boiler Repair
Regenerator
Misc Hot & Cold Works
LRCCU Nov 2004 Heat Exchangers S$ 6,500,000Rotating & Stationary EquipmentTower Tray RepairPiping ReplacementVessel CleaningFurnace / CO Boiler Repair RegeneratorMisc Hot & Cold Works
HCU 2003 Heat Exchangers S$ 300,000Tower Tray RenewalPiping ReplacementRotating EquipmentVessel Cleaning
CD4 LOC 2002 Heat Exchangers S$ 1,600,000Tower Tray RenewalPiping ReplacementRotating EquipmentVessel Cleaning
HCU 2001 Heat Exchangers S$ 1,500,000Tower Tray RenewalPiping ReplacementRotating EquipmentVessel Cleaning
LRCCU Nov 6’ 00 - Dec 3 ‘00 Heat Exchangers S$ 6,500,000Rotating EquipmentTower Tray RepairPiping ReplacementVessel CleaningFurnace Repair
CD5 Oct 3 - Nov 5 ‘99 Heat Exchangers S$ 689,000Tower Tray RepairPiping ReplacementRotating EquipmentVessel Cleaning
HCU Oct 1 - Oct 10 ‘98 Heat Exchangers S$ 910,000Tower Tray RenewalPiping ReplacementRotating EquipmentVessel Cleaning
LRCCU Nov 5 - Dec 3 ‘97 Reactor Cleaning & Modification S$2,500,000Regenerator Cleaning & ModificationPiping ReplacementRotating Equipment
file:///tt/file_convert/55cf9bd9550346d033a79ad0/document.xls : MBM Page 3 of 16
Shutdown Maintenance Turnaround Works in ExxonMobil (Jurong Refinery)
Plant Duration Jobs Completed Approx. Value
LHDC/NORTH FLARE/ Jan 06 - Jan 06 Mechanical repair works S$622,000
SRU/AMINE/VIS/VAC
SRU#4 Sept 05 - Sept 05 FinFan & Exchanger repair works S$38,000
Supply labour
MPHC Jul 05 - Aug 05 FinFan & Exchanger repair works S$250,000
Supply labour
SRU#4/CHD#2/CDU#1 Mar 05 - May 05 AFC Retubing & O/H Line Replacement S$2,800,000
VIS/LHDC/SRU#5/SWS#2 Heater,FG Ducting & A/Preheater
Drum Maintenance works
FinFan & Exchanger repair works
Supply labour
LHDC/NORTH FLARE/ Aug 04 - Sept 04 Mechanical repair works S$520,000
SRU/AMINE/VIS/VAC
AMINE/CHD/MIDW/SRU Apr 04 - Jun 04 Catalyst change out S$2,432,000.00SWS/CCR/SGP/XYL/BZ Metal repair worksSULF/PAREX/MHAI
LHDC/MSDW Oct - Nov 03 LHDC Reactor S$1,500,000 Charge HeaterTowers/Drums CleaningExchanger/Fin fan tube cleaningGas CompressorPiping replacementService PSV
CCR Apr - May 03 Change/Repair Reactor S$210,000
MPHC/CYCLOHEX Apr - May 03 Repair/Replace/Hydrojet cleaning S$100,000 & Hydrotest of Exchanger
SRU 5 May - June 03 Metals Works Activities S$100,000
Benzene Tower Jan - Feb 03 Feet distributor S$200,000
Replace 5 beds of packing
file:///tt/file_convert/55cf9bd9550346d033a79ad0/document.xls : MBM Page 4 of 16
Solfolane S/D Oct - Nov 02 Clean internal rain deck extractor S$210,000
Repair Trays/Recovery column
CDU 2/VAC S/D June - July 02 Repair/Replace B/v/Gasket S$1,200,000
CDU Plant Revamp Feb - Apr 97 Pipings Revamp S$7,000,000 Towers/Drums Furnaces
Additional Work For Above
CDU Plant S/D Maintenance Mar - Apr 97 Furnace Repair S$5,000,000
Pipings Replacement
Towers/Drums Cleaning And
Trays Supports Replacement
file:///tt/file_convert/55cf9bd9550346d033a79ad0/document.xls : PAC Page 5 of 16
Shutdown Maintenance Turnaround Works in ExxonMobil (Pulau Ayer Charwan)
Plant Duration Jobs Completed Approx. Value
Lubes S/D 03 Mar15 - Apr 25 ' 03 Piping Works S$ 1,647,000
Exchangers
Tower
Drum
Manpower Supply
APS I TAR 00 Oct 9 - Nov 5 ‘00 Heat Exchangers S$ 4,000,000
High Pressure Jet Cleaning Exchangers
AirFin Coolers / Retube Exchangers
Towers/Drums / Furnace Up Grading
Piping & Valves Replacement
Tower Internal Shell Side Weld Overlay
APS I TAR 99 Jun 13 - Oct 31 ‘99 Heat Exchangers S$ 1,300,000
High Pressure Jet Cleaning Exchangers
AirFin Coolers / Retube Exchangers
Towers/Drums / Furnace Up Grading
Piping & Valves Replacement
APS II TAR 98 Sep 7 - Oct 6 ‘98 Heat Exchangers S$4,600,000
One Single Contractor’s AirFin Coolers
Concept On Lump Sum Basis Retube Exchangers
Managing Entire High Pressure Jet Cleaning Exchangers
Plant Turnaround Towers/Drums
Including Overall Furnance Up Grading
Planning & Scheduling Piping Replacement
Safety Management Valves Replacement
And Other Services Such As:
Scaffolding * Cranes 360 Ton - 20 Ton
Insulation Totaling 11 units
Blasting/Painting * Modules For TAR Meeting/Process
NDT * Portable Toilets etc.
Civil * Auto Weld Overlay on Shell Internal
Single Contracting Concept
APS I TAR 99 Jun 13 - Oct 31 ‘99 Heat Exchangers S$ 1,300,000 AirFin Coolers / Retube Exchangers
High Pressure Jet Cleaning Exchangers
Towers/Drums / Furnace Up Grading
Piping & Valves Replacement
APS I TAR 00 Oct 9 - Nov 5 ‘00 Heat Exchangers S$ 4,000,000 AirFin Coolers / Retube Exchangers
High Pressure Jet Cleaning Exchangers
Towers/Drums / Furnace Up Grading
Piping & Valves Replacement
Tower Internal Shell Side Weld Overlay
Logistics
file:///tt/file_convert/55cf9bd9550346d033a79ad0/document.xls : SRC Page 6 of 16
Shutdown Maintenance Turnaround Works in Singapore Refinery Co.
Plant Duration Jobs Completed Approx. Value
19/08 to 03/09/2004 Furnace, Tower, Drums S$1,975,000
Air Preheaters
Heat Exchanger Servicing
Piping Repairs
Cooling Tower
Air Fin Coolers
LRCCU July 2006 Heat Exchangers S$ 1,000,000(Unplanned) Rotating & Stationary Equipment
Tower Tray RepairPiping ReplacementVessel CleaningFurnace / CO Boiler Repair RegeneratorMisc Hot & Cold Works
HCU 2006 Heat Exchangers S$ 800,000Tower Tray RenewalPiping ReplacementRotating EquipmentVessel Cleaning
LRCCU Dec 2005 Heat Exchangers S$ 500,000
Rotating & Stationary Equipment
Tower Tray Repair
Piping Replacement
Vessel Cleaning
Furnace / CO Boiler Repair
Regenerator
Misc Hot & Cold Works
LRCCU Nov 2004 Heat Exchangers S$ 6,500,000Rotating & Stationary EquipmentTower Tray RepairPiping ReplacementVessel CleaningFurnace / CO Boiler Repair RegeneratorMisc Hot & Cold Works
HCU 2003 Heat Exchangers S$ 300,000
CDU-II/VBU/VFU TAR 2004
file:///tt/file_convert/55cf9bd9550346d033a79ad0/document.xls : SRC Page 7 of 16
Tower Tray RenewalPiping ReplacementRotating EquipmentVessel Cleaning
CD4 LOC 2002 Heat Exchangers S$ 1,600,000Tower Tray RenewalPiping ReplacementRotating EquipmentVessel Cleaning
file:///tt/file_convert/55cf9bd9550346d033a79ad0/document.xls : Seraya Page 8 of 16
Shutdown Maintenance Turnaround Works in Seraya Chemicals
Plant Duration Jobs Completed Approx. Value
2005
U3100 Apr 04 - May 04 MPG De- Bottlenecking Project $206,000.00 Relocate 3 reboilerModify platformModify connection pipingChange out column internal
PODU SMPO2 Jul 03 - Dec 03 Boiler/Cogen Mom Inspection $90,000.00 Open Man HolesInternal CleaningRemoval Of Steam Drum AndMud Drum InternalsHot Works Support For Chemical Cleaning
PODU SMPO2 Sep 02 - Dec 02 Boiler/Cogen Mom Inspection $60,000.00 Open Man HolesInternal CleaningRemoval Of Steam Drum AndMud Drum InternalsHot Works
SMPO TURN AROUND SD June 01 Support Fitters For Spading Work $400,000.00 Steam Header Piping $30,000.00 Misc Works $100,000.00
SMPO - UNIT 1300/600 Feb 01 - Mar 01 Replacement of F-1301 Gas Ducts $50,000.00 C-605 Repair Works
Over hauling works of Sea water intake $15,000.00 Pump -5604
CW intake system/Basin March 00 - Ap 00 Inspection and cleaning of CW intake $35,000.00 PipeInspection and cleaning of CW basinAssistance to Divers to do under water welding works
SMPO 1 U-600 Feb 00 - March 00 C-602 replacement of corroded CS $50,000.00 nozzles to SSE-613A/B/C draw bundles repair works
file:///tt/file_convert/55cf9bd9550346d033a79ad0/document.xls : Seraya Page 9 of 16
Shutdown Maintenance Turnaround Works in Seraya Chemicals
Plant Duration Jobs Completed Approx. Value
SMPO1 U-900 Sep 00 - Oct 00 Steam Condenser E-952A/B leaking $150,000.00 Draw Bundles,Repair Shell cracksStatutory inspection
March 00 - Apr 00 Over hauling works of Sea water intake $20,000.00 Pump -5603
SMPO plant All units April 99 -May 99 SD spading works.Support to operations $120,000.00 C-602 open man holes,entry and repair works,replacement of corroded nozzlesC-401 internal repair worksU-900 Misc works,safety valves removalF-1301 Furnace duct leak- repair worksK-1303 atomising compressor open airvessels,coolers for statutory inspection
SMPO U-100 April 99 -May 99 Upgrade Caustic Loop $200,000.00 Replacement of CS line to SS
Replace V-109 with new SS vessel
Replace E-111 tube bundle
Remove shell and sent for heat treatment
PODU (MPG plant) April 99 -May 99 Inspection of Reboilers C-3201/02/03 $15,000.00
SMPO And Utilities May 18 - June 5 ‘98 Heat Exchangers S$1,800,000Planning & Scheduling Vessel CleaningWarehouse & Material M&R PipingMgt Supply of Field Rotating Equipment
Supervision To Client
SMPO sea cooling water Sep 97 - Dec 97 Open exchangers,pull bundle and $300,000.00
exchangers inspection and repair works overlay works for
repair works covers,tube sheet
file:///tt/file_convert/55cf9bd9550346d033a79ad0/document.xls : Invista Page 10 of 16
Shutdown Maintenance Turnaround Works in Invista (Previously known as Dupont)
Plant Duration Jobs Completed Approx. Value
June 04 - July 04 Control Valves, Roof Tank Repair, S$ 500,000Boiler, Painting, PSM Non MOM Listfor Inspection Works and ManpowerSupply
file:///tt/file_convert/55cf9bd9550346d033a79ad0/document.xls : Fab Page 11 of 16
Shutdown Maintenance Turnaround Works by FAB shop
Plant Duration Jobs Completed Approx. Value
IPG Jun' 2005 Mechanical Works & Motor S$ 250,000
Replacement
Soxal Hypo Plant Oct' 2004 - Dec' 2004 Mechanical Works & Motor S$ 170,000Replacement
Soxal Hypo Plant Jul' 2004 Mechanical Works & TCR Bundle S$ 232,000Change Out
IPG Oct' 2003 - Dec' 2003 Mechanical Works & Motor S$ 150,000Replacement
Soxal Hypo Plant Oct' 2003 Mechanical Works & TCR Bundle S$ 180,000Change Out
IPG Nov' 2002 - Dec' 2002 Mechanical Works & Motor S$ 193,000Replacement
Soxal Hypo Plant Oct' 2002 Mechanical Works & TCR Bundle S$ 350,000Change Out
file:///tt/file_convert/55cf9bd9550346d033a79ad0/document.xls : Typical SD Work - Manpower Page 12 of 16
Typical Turnaround Maintenance Work ExperiencePlant Duration Jobs Completed Peak Manpower
ExxonMobil (Jurong) Oct - Nov 03 LHDC Reactor 400LHDC/MSDW Charge Heater
Towers/Drums CleaningExchanger/Fin fan tube cleaningGas CompressorPiping replacementService PSV
SRC Aug 03 - Sept. 03 Furnaces 350HCU2 - TAR AUG 2003 Air-Preheaters
Towers (Exclude 4151 E)Heat ExchangersBreechlock Exchnagers & Neutralisation WorkAirfin Coolers, Drums, Rvs, Cvs, Pipings,System Blind, Additional Heat Exchangers1042 L Dereactor1041 L Cooler Tower2141 L HCU 2 Flare Stack2101 L Unplug CRU Flare Pilot Gas Line
Petrochemical Singapore Jul 03 - Aug 03 Heat Exchangers 280Aromatics / MTBE Plant-1 Retube Exchangers
High Pressure Jet Cleaning ExchangersTowers/DrumsReactor/FurnancePiping & Valves ReplacementTower Internal Shell Side Weld Overlay
Shell Nov 99 - Dec 00 Heat Exchangers 600LRCCU Rotating Equipment
Tower Tray RepairPiping ReplacementVessel CleaningFurnace Repair
ESPL Sep 98 - Oct 98 Heat Exchangers 500APS II TAR 98 AirFin CoolersOne Single Contractor’s Retube ExchangersConcept On Lump Sum Basis High Pressure Jet Cleaning ExchangersManaging entire Plant Towers/DrumsTurnaround including overall Furnance Up Gradingplanning & scheduling, safety Piping Replacementmanagement & other services Valves Replacementsuch as: Scaffolding, Insulation,Blasting/Painting, NDT & Civil * Crane and heavy equipment services
Mobil Feb - Apr 97 Pipings Revamp 1000CDU Plant Revamp Towers/Drums Furnaces CDU Plant S/D Maintenance Additional Work For Above
Trays Supports Replacement
Logistics
EPC Jobs Summary
Project Name
HP Steam & Associated High Pressure Boiler Feedwater
16 nos of Metering Skid for China Project
Operation Streamlining Project - EPC
SCC Hydrogen and Steam Line
One Unit of Waste Water Equalization Tank
SER-DUP:8" FRP High Grade Industrial Water to Dupont - Phase 1 & 2
Gray & Black Water Tank Fabrication Work for Singapore Olefins Project
Ethoxylation Plant (Detailed Engineering, Procurement And Construction)
EPC Jobs Summary
Client Year
SUT Sakra2002
SUT Sakra Pte Ltd 2002
Fisher-Rosemount 2002
ExxonMobil 2002
ExxonMobil 2001
Infinieum 2000
Exxon/KOCJV1999-2000
Witco1998
Construction Jobs Summary
Project Name
Electronic Polish Plant
Piping Works for PCS II Project
Crude Splitter Unit Project
Pfizer, Bulk Pharmaceuticals Facility Organic Synthesis Plant
Styrene Monomer Propylene Oxide 2 Project - Area X Piping Works
Piping Erection Work for ISBL Area on Singapore Olefins Project
Construction Jobs Summary
Client Constrn PeriodJacobs Lend Lease Pte Ltd Feb' 2001 - Aug'2002
Jan' 2000 - Apr'2002
Exxon Chemical / KOCJV 1998 / 2000
Shell Apr' 2000 - Aug' 2000
PCS / JGC Singapore Jan' 2001 - Sep' 2001
Shell Eastern Petroleum Pte Ltd 1999-2000
ABB Lummus Global/JGC Corp. Singapore JV