Post on 06-Apr-2016
description
PORTFOLIO
B Y
ARCHITECTURE + DESIGN
SHENG WU
INDEX
P R O J E C T S
INTERNSHIP
E N J O Y .
THE COURT COMPLEX
THE CRAFT ARCHIVE
ST. CATHERINE’S MONASTERY
TWO WOOD BOXES
RAMSA
CANNONDESIGN
CS&P
PARKIN ARCHITECTS
NKA
CURRICULUM VITAE
06
14
20
22
24
26
28
30
32
04
4
cuRRIcuLumVITAE
Candidate for Bachelor of Architectural Studies Co-OpUniversity of WaterlooCambridge, OntarioExcellent Acedemic Standing ‘10 - present
Bayview S.SRichmond Hill, OntarioPre-International BaccalaureateHonour Roll
Global Total Office Toronto Film Festival1st place Best Seat in the House Design Competition with Cannon Design
“Best Smile” at office Holiday Party votewith CS&P
St. Catherine’s MonasteryPublished in Archnet International Journal for Architecture Research
University of Waterloo Presidents Scholarship
Graduated High School as Ontario Scholar
Acadia Conference Exhibition Set-up | Food&Bar
Waterloo Entrance Interview Panel
Waterloo Architecture Student Association2A Class Representative
Choreographer Athru | 2A Iconography Class Play
Waterloo Open House Tour Guide
ADVENT TaiwanVolunteer English Teacher
Revit + DrofusRhinoceros + VrayAutoCadGoogle SketchUpAdobe Creative SuiteMicrosoft Office 3D PrintingLaser cuttingCNC
Model MakingDraftingFree Hand Sketching
EnglishMandarin
EDUCATION
Post-Secondary2010 -2015
Secondary2008-2010
2006-2008
RECOGNITION
2013
2012
2011
2010
INVOLVEMENT
2013
2012
2011
SKILLS
Digital
Analog
Language
Langstaff S.S.Richmond Hill, OntarioHonour Roll
shENg wu
cONTAcT
SHENG WU
sw3wu@uwaterloo.casheng.wu92@gmail.com1-647-648-8852
Phone
REsumé
NKArchitectsToronto, Canada | Apr-MayWorked on a private Toronto residence - Built physical and digital study models in SketchUp- Designed different facade options for client- Went on site visits to check construction progress
Parkin Architects IncToronto, Canada | May - Aug | Jan - April 2012Worked on schematic design for Milton Hospital and Joseph Brant Hospital P3 compeition (2014) Worked on New Oaskville Hospital (NOH) during DD and CD (2012)- Designed Main Entrance Lobby working closely with project architect- Developed interior details and renders of main public spaces
CS&P ArchitectsToronto, Canada | Sept - DecWorked on multiple projects of different scale with focus on recreational, judicial and educational use- Prepared working drawings in AutoCAD and Revit for various projects- Helped develop new Revit office standards for all subsequent projects- Created schematic drawings, models and graphic presentation material- Contacted consultants for coordination and various contract administration
Cannon DesignToronto, Canada | May - AugWorked on the renovation and redevelopment of Credit Valley Hospital in Mississauga, Ontario- Responsible for architectural phasing documents- Assisted in maintaining project consistency in Revit- Managed program changes and produced RDS in dRofus- Responsible for all typical room templates- Involved in Material &Finishes meeting and documentation
Robert A.M. SternNew York, USA | Jan - AprilCo-ordinator of physical project models for University of Nebraska, college of Business- Worked with internal model shop to decide on best method of fabrication- Created lasercut files and 3D print files using AutoCAD, Revit, Rhino and Makerware- Photographed and edited photos of physical models for use in presentation
D.More DesignTaipei, Taiwan | June - JulyWorked on an one storey office turned apartment renovation - Took on-site measurements and drew existing plans- Created different layout options for client- Redecorated office interior
WORK
2014
2013
2012
2011
6
ThEcOuRTcOmPLEXY E A RS I T ET Y P E
B R I E F
3A STUDIO FINAL - PROF. PHILIP BEESLEY201311WELLESLEY ST. TORONTO, CANADAMIXED - THEATRE/RESIDENTIAL/RETAIL
N
sTuDIO PROjEcTs
EMBLEMATIC RENDER
This project is meant to address the increasing need for public park space in the urban fabric of Toronto as the city continues its densification. The program also recognizes the need for more housing and the desire for a space for cultural events to take place. The approach was to create a “sanctuary courtyard” as the place of junction for the residents, theater school students, theatre patrons and for the general public. The project also seeks to further toronto’s underground pass system by layering public space vertically. It is an experiment in bringing greenery upward in the residential tower in a spiraling promenade of private communal space for the residents.
12
10
11
121
2
4
5
3
6
788 99
1.THEATRE LOBBY 2.COAT ROOM 3.PRODUCTION CONFERENCE ROOM 4.STAGE LOADING ELEVATOR
ThE cOuRT cOmPLEX
RENDERED GROUND FLOOR PLAN5.THEATRE OFFICES 6.RESIDENTIAL LOBBY 7.BIKE STORAGE/WORKSHOP 8.RETAIL
9.RESTAURANT 10.UNDERGROUND PARKING ENTRANCE 11.LIVE-WORK UNITS 12.LIVE-WORK GALLERY
CIRCULATION1.SPIRALING THEATRE ROUTE TO ROOF TOP2.DIRECT VERTICAL CIRCULATION TO ROOF TERRACES 3.STREET ACCESS POIINTS TO COURTYARD
1 2 3
8
RETAILWELLESLEY ST
BREADALBANE ST
RESI
DENT
IAL
FLY
ART
LIVE-WORK
THEATRE
N
MORPHOLOGY
WORKSHOP
DRESSING
LOBBY
UNDERGROUND LOBBY/GALLERY
BOARDWALK
ROOFTOP
COURTYARD
REHEARSAL
RETAILWELLESLEY ST
BREADALBANE ST
RESI
DENT
IAL
FLY
ART
LIVE-WORK
THEATRE
N
MORPHOLOGY
RETAILWELLESLEY ST
BREADALBANE ST
RESI
DENT
IAL
FLY
ART
LIVE-WORK
THEATRE
N
MORPHOLOGY
RETAILWELLESLEY ST
BREADALBANE ST
RESI
DENT
IAL
FLY
ART
LIVE-WORK
THEATRE
N
MORPHOLOGY
THEATRE LOBBY SECTIONRHINO + PHOTOSHOP + ILLUSTRATOR
sTuDIO PROjEcTs
1 2 3 4
RETAILWELLESLEY ST
BREADALBANE ST
RESI
DENT
IAL
FLY
ART
LIVE-WORK
THEATRE
N
MORPHOLOGY
RETAILWELLESLEY ST
BREADALBANE ST
RESI
DENT
IAL
FLY
ART
LIVE-WORK
THEATRE
N
MORPHOLOGY
ThE cOuRT cOmPLEX
RETAILWELLESLEY ST
BREADALBANE ST
RESI
DENT
IAL
FLY
ART
LIVE-WORK
THEATRE
N
MORPHOLOGY
NORTH-SOUTH SECTIONREVIT + ILLUSTRATOR
STUDIO OPEN STUDIOSTUDIO
LOBBYLOBBY
DRESSING
WORKSHOP WORKSHOP WORKSHOPSTORAGELOAD
WORKSHOP
DRESSING DRESSING DRESSING WARDROBEPARKING
LIVE
SHARE
SHAREDSPACE
LOUNGE
PODIUM MORPHOLOGY1.PROGRAM ORGANIZATION(THEATRE AND PARKING UNDERGROUND)2.ALLOW FLYTOWER AND GALLERY PEEK THROUGH FROM UNDERNEATH3.CREATE POCKETS OF TIGHT PUBLIC SPACE ALONG STREET PERIMETERS4.FUNNEL OPENINGS FOR PEDESTRIANS + BICYCLES5.RECONNECT WITH CONTINUOUS GREEN ROOF TOP6.REFLECT BUILDING ANGLES AND LEVELS ON PUBLIC SURFACES
5 6
10
WELLESLEY STREET ELEVATION
sTuDIO PROjEcTs
SECOND FLOOR PLAN
1
1
1
5
4
3
2
1
1
2
2
3
456
8
7
2
ThE cOuRT cOmPLEX
SECOND FLOOR PLAN
BASEMENT FLOOR PLAN
ROOF TOP FLOOR PLAN
1.WORKSHOPS2.SECOND THEATRE LOBBY3.AUDITORIUM 4.STAGE5.PARKING
TOWER COMMUNAL SPACESCONNECTED BY SPIRALING STAIRWAY1.ROOFTOP LOUNGE2.GARDEN LOUNGE3.PLAYGROUND4.FITNESS/YOGA5.COMMUNAL DINING6.READING
1.LARGE REHEARSAL STUDIO2.SMALL REHEARSAL STUDIO3.LOUNGE 4.CONDO BAR5.POOL6.RETAIL7.LIVE-WORK8.UPPER LEVEL BOARDWALK
1.CONDO ACCESS TO ROOFTOP/MULTI-PURPOSE ROOM2.BOARDWALK3.SEATING AREA
1
3
3
COMMUNAL DINNING
PLAYGROUND
GARDENLOUNGE
ROOFTOPLOUNGE
FITNESS/YOGA
READING
1
2
3
5
4
6
12 sTuDIO PROjEcTs
ThE cOuRT cOmPLEX
THE COURT RENDERRHINO + VRAY + PHOTOSHOP
14
ThEcRAFTARchIVEY E A RS I T ET Y P E
B R I E F
1B STUDIO FINAL - PROF. MAYA PRZYBYLSKI2010
48 McCAUL ST. TORONTO, CANADA
ARCHIVE
After visiting various Toronto archives and realizing the wealth of information that is stored in hidden away places, I wanted to generate spaces that would engage the public in visiting an archive. By allowing the public to glimpse into the private archive storage area and curating a route that wraps around the main exhibition, the building become one big display case for crafts. Emphasizing that crafts are often the intimate creation of our hands, vistors are made more aware of their bodies in space as they move through the building in an everchanging viewpoint to the centre. Furthermore, a direct viewing relationship amoung the different users (general public, researchers, staff) makes each visitor feel on display as well. The centre stage concept was developed from the idea of putting the craft under the spotlight.
sTuDIO PROjEcTs
1:100 BASSWOOD MODEL
CONTEXT
ThE cRAFT ARchIVE
‘AUDIENCE’(CAFE)
‘BACK OFHOUSE’(OFFICE)
‘CENTRE STAGE’
FRONT LOBBY
STORAGE SPACE
‘BALCONY SEATS’‘RESEARCH SPACE)
1:100 BASSWOOD MODEL
CRAFT AS STAGE THEATRE CONCEPT DIAGRAM
STREET ELEVATIONRHINO + VRAY + PHOTOSHOP
McC
AUL
STRE
ET
STEPHANIE STREET
GRANGE ROAD
CONTEXT
STREET ELEVATIONRHINO + VRAY + PHOTOSHOP
16
3
1
2
TOP FLOOR PLAN
3
1
2
42
1
3
B1 FLOOR PLAN
1.MAIN EXHIBITION SPACE2.SECONDARY GALLERY3.CAFE4.SERVICE
1.RESEARCHER SPACE2.MEETING ROOM3.SERVICE
1.ARCHIVE2.RENT-OUT STUDIO SPACE3.SERVICE
2ND FLOOR PLAN
sTuDIO PROjEcTs
B1 FLOOR PLAN
Main Exhibition Platform Lifts UpGround Floor Public Realm + Basement Storage Public Route Pushed Down to Further Reveal Storage Upward Public Route Made Continuous
Main Exhibition Platform Lifts UpGround Floor Public Realm + Basement Storage Public Route Pushed Down to Further Reveal Storage Upward Public Route Made Continuous
S TORAGE
P U B L I C
S TORAGE
P U B L I C
S TORAGE
P U B L I C
S TORAGE
P U B L I C
Main Exhibition Platform Lifts UpGround Floor Public Realm + Basement Storage Public Route Pushed Down to Further Reveal Storage Upward Public Route Made Continuous
Main Exhibition Platform Lifts UpGround Floor Public Realm + Basement Storage Public Route Pushed Down to Further Reveal Storage Upward Public Route Made Continuous
S TORAGE
P U B L I C
S TORAGE
P U B L I C
S TORAGE
P U B L I C
S TORAGE
P U B L I C
Main Exhibition Platform Lifts UpGround Floor Public Realm + Basement Storage Public Route Pushed Down to Further Reveal Storage Upward Public Route Made Continuous
Main Exhibition Platform Lifts UpGround Floor Public Realm + Basement Storage Public Route Pushed Down to Further Reveal Storage Upward Public Route Made Continuous
S TORAGE
P U B L I C
S TORAGE
P U B L I C
S TORAGE
P U B L I C
S TORAGE
P U B L I C
Main Exhibition Platform Lifts UpGround Floor Public Realm + Basement Storage Public Route Pushed Down to Further Reveal Storage Upward Public Route Made Continuous
Main Exhibition Platform Lifts UpGround Floor Public Realm + Basement Storage Public Route Pushed Down to Further Reveal Storage Upward Public Route Made Continuous
S TORAGE
P U B L I C
S TORAGE
P U B L I C
S TORAGE
P U B L I C
S TORAGE
P U B L I C 6
4
2
1
3
5
1.LOBBY2.MAIN EXHIBITION3.ARCHIVE VIEWING SPACE4.ADMINISTRATIVE OFFICE5.LOADING6.SERVICE
1.BASIC PROGRAM ELEMENTS- PUBLIC GROUND FLOOR-BASEMENT ARCHIVE
2.CENTRAL AREA LIFTS UP TO BECOME MAIN EXHIBITION PLATFORM
3.PUBLIC ROUTE PUSHED DOWN TO FURTHER REVEAL ARCHIVE
4.UPWARD PUBLIC ROUTE MADE CONTINUOUS TO BRING VISITORS TO SECOND GALLERY AND CAFE
1
2
3
4
GROUND FLOOR PLAN
ThE cRAFT ARchIVE
18 sTuDIO PROjEcTs
12
34
5
EMBLEMATIC DIAGRAM OF VIEWS OF CENTRE EXHIBITION1.ARCHIVE VIEWING AREA2.VIEW FROM FRONT OF BUILDING 3.VIEW FROM SECOND GALLERY4.VIEW FROM CAFE5.VIEW FROM RESEARCH AREA
EMBLEMATIC DIAGRAM OF VIEWS OF CENTRE EXHIBITION1.ARCHIVE VIEWING AREA2.VIEW FROM FRONT OF BUILDING 3.VIEW FROM SECOND GALLERY4.VIEW FROM CAFE5.VIEW FROM RESEARCH AREA
ThE cRAFT ARchIVE
20
sT. cAThERINE’s mONAsTERy Y E A RS I T ET Y P E
B R I E F
2A ICONOGRAPHY - PROF. TAMMY GABER2011MOUNT SINAI, EGYPTRELIGIOUS SPACE
Built on the holy site of Mount Sinai where Moses saw the burning bush, The Holy Monastery of the God-trodden Mount Sinai (now known as St. Catherine’s Monastery) symbolizes a peaceful point of encouter between three great monotheistic religions: Christianity, Islam, and Judaism. The monastery and fortification was commissioned in the 560’s to enclose the chapel of the burning bush and now also hosts a mosque within its walls. The project included physical modeling at 1:100 and accompanying research essay. Details of the space were interpreted from drawings and photographs. Entire model dimensions 2m x 2m x 0.8m, drawn in autocad and laser cut in millboard. Made in collaboration with Louis-Pierre Belec, James Banks, Danielle Rosen, Sheelah Tolton. Project was Published in Archnet International Journal for Architecture Research
sTuDIO PROjEcTs
sT. cAThERINE’s
SECTION CUT MODEL TO REVEAL INTERIORS OF BOTH CHURCH AND MOSQUE MILLBOARD
22
TwOwOODBOXEs Y E A R
B R I E F
WORKING WITH WOOD - PROF. HEINZ KOLLER & DAN JESSEL2012
The end products of the architecture woodshop elective that focuses on thinking and working with real materials and understanding the process of construction. The course greatly increased my appreciation of using materials and an iterative process as the source of design. Mistakes made during construction and the subsequent solutions defines the final box below.The puzzle box is the result of my experiments in different wood joinery and modern marquetry.
JAPANESE INSPIRED BOX MADE OF GONCALO ALVES AND CURLY MAPLE
sTuDIO PROjEcTs
PUZZLE BOX MADE OF PLY AND LASERCUT VENEER
TwO wOOD BOXEs
24
RAmsAARchITEcTsY E A RLOCALET Y P E
B R I E F
R O L E
3B WORKTERM CO-OPJAN - APRIL 2014NEW YORK, USAEDUCATION | INSTITUTIONAL
Worked on Univeristy of Nebraska, college of Business as co-ordinator and main maker of physical project models. Knowledge of Revit, Rhino, AutoCAD, lasercutting, 3D printing and traditional modeling methods allowed me to act as mediator between project design team and model shop team.
- Mixed medium physical modeling - Digital modeling- Revit and Photoshop rendered sections + elevations- Photographed models for presentation- Document and archive meetings
INTERNshIP
1/16 SCALE WORKING MODEL
CANNON DESIGN
UNIVERSITY OF NEBRASKA MODELS
26
cANNONDEsIgNY E A RLOCALET Y P E
B R I E F
R O L E
3A WORKTERM CO-OPMAY - AUGUST 2012TORONTO, CANADAHEALTHCARE|OTHER COMPETITIONS
Member of an international team (Boston, Toronto, New York) working on the renovation and redevelopment of Credit Valley Hospital in Mississauga, Ontario, Canada. Active member on other office initiatives and competitions. - Assisted BIM leader in maintaining project consistency of Revit Model- Managed program changes and produced room data sheets in dRofus- Responsible for all typical room templates- Involved in Material &Finishes meeting and documentation- Responsible for architectural phasing documents- Modeled existing building and new building exterior+interior- Coordinate project equipment, accessory, plumbing standards- Created graphics for Doors Open Toronto at Cannon Design- Created graphics for Global Total Office TIFF Chair Competition and responsible for execution of final chair design
INTERNshIP
ARA TIFF - WINNER OF GLOBAL OFFICE ‘BEST SEAT IN THE HOUSE’
x-122
x-123
3242
3249
3247
3245
3243wc115
wc116
wc117
wc118wc119
wc120
wc121
wc122
3252
3254
3256
3258
wc112 wc111
3225
wc110wc109wc108
x-121
322332213219
wc107
3217
wc113
3235
3238
wc114
3261
wc106
wc105
3262
3265
wc104wc103
3271
3273
3270
wc102
3279 3281
wc101 wc100
3283 3285
wc99
wc97
wc96
wc98
3289
3292
wc95
3212
3234
3201
3205
3204
wc86
3208
3200
3207
3206
3295wc85
3294
3269
3260
3179 3181 3183 3185
3173
wc241 wc240 wc239 wc238 3187
wc212 wc213
3170
3169
3189
3192
wc236
wc237
3165
wc214
wc215
3162
3171
3194
wc2353195
3105
3104
3103
3102
3101 3100
3106
3107
3108wc234
3115
3117 3119 3121 3123
31313133
3134
wc225
3135
3138
wc224
3141
3142
3143wc223
3145wc222
wc2213147
3149wc220
3152wc219
3154wc218
3156
3158wc216
wc217
3160
31513251
3125
R25
RJ
RH
RG
RF
RE
F
L
K
N1x N1 N2 N3
NFx
NG
NH
NJ
NK
NL
NLx
H
N25
9y 10 11 12 13 14 15 16 17 18 19 20
21
23 24 25 26 27
Ax
A
Dx
Ex
G
N25
25x
Fx
N25
AC
AB
AD
AE
D
E
N4 N4x
NT
NU
N5 N5x
N5y
N6 N7 N8
NS
NR
NQ
NP
NN
NM
NS
NR
NQ
NP
NN
NM
N17N17x
N17y
N18N19 N20
NT
NU
N9 N10 N11 N12N13 N14 N15 N16N16x
NF
N8NE
ND
NC
NB
NA
H
NF
NE
ND
NC
NB
NA
H
N20xN21N22 N23 N24N24N24
NG
NK
x-90
x-89
3302
3301
x-119
x-116
x-117
3403
3514
x-118
3448
3320
3310
3308
3306
33053304
x-242
3316
3321
3416
3570
3572
3573
Closet 6
35843585
3586358335823581
3576 3577
3587
x-225
3410 3408 34063401
3412
x-223
x-222
x-221 x-220 x-218x-219
3546
3547
3544
3542
3540
3537
3538
3539
3531
3518
3515
x-217
3513
3520
x-208 x-209 x-210 x-211 x-213
x-214
x-215
x-216
x-212
3324
3342
3326
3323
3321
3325 3341
33303338
3340
3345
3341
3339
3337
3336
33353333
3331
3329
3349
3334
3332
x-227
3424
3440
3438
3422
454325430543644344432443
3445 3449 34513443x-228
3439 3453
346134633459
34553457
3400x-2293402
x-224
x-226
x-230x-231
3542
wc-242
wc-243
wc-244 wc-246
sh
wc-248
wc-245
FHC
wc-247
pipes
ACT @ 2.7m
SH
FHC
x-206
x-205
3100CONFERENCE
ROOM
3101CRITICAL
3102OFFICE
3103OFFICE
3100NOURISHMENT
3105ENVIRONMENTAL
SERVICES
3106STAFFLOUNGE
3107SOILEDUTILITY
3108PATIENTROOM
3108PATIENTROOM
3112PATIENTROOM
3115PATIENTROOM
3117PATIENTROOM
3119PATIENTROOM
3121PATIENTROOM
3123PATIENT
3125PATIENTROOM
3131PATIENTROOM
3133PATIENTROOM
3134SHOWERROOM
3135PATIENTROOM
3138PATIENTROOM3141
SHOWERROOM
3142CLEANUTILITY
3143PATIENTROOM
3145PATIENTROOM
3147PATIENTROOM
3149PATIENTROOM
3160MEDICATION
ROOM
3158PATIENTROOM
3156PATIENTROOM
3154PATIENTROOM
3152PATIENTROOM
3151PATIENT &FAMILY
3162PATIENTROOM
3165PATIENTROOM
3169
ROOM
3170OFFICE
3171PATIENTROOM
3173PATIENTROOM
3179PATIENTROOM
3181PATIENTROOM
3183PATIENTROOM
3185PATIENTROOM
3189PATIENTROOM
3192PATIENTROOM
3195PATIENTROOM
3108a
3112a
3115a
a3213a1213a9113a7113
3125a3131a
3135a
3138a
3143a
3145a
3147a
3149a
3156a
3154a
3152a
3158a
3200OR
BOOKING
3206OFFICE
3207SOILEDHOLDING
3208PATIENTROOM
3205ENVIRO.SERVICES
3205NOURISHMENT
CENTRE
3201WAITINGAREA
3213CRITICALCARE
3213a
3213b
3217PATIENTROOM
3217a
3219PATIENTROOM
3219a
3221PATIENTROOM
3221a
3223PATIENTROOM
3223a
3235PATIENTROOM
3235a
3238PATIENTROOM
3238a
3242PATIENTROOM
3243PATIENTROOM
3245PATIENTROOM
3247PATIENTROOM
3249PATIENTROOM
3242PATIENTROOM
3258PATIENTROOM
3256PATIENTROOM
3254PATIENTROOM
3252aPATIENTROOM
3243a
3245a
3247a
3249a
3258a
3256a
3254a
3252a
3261STAFF
3262PATIENTROOM
3265PATIENTROOM
3270JIT
SUPPLES
3271PATIENTROOM
3273PATIENTROOM
3279PATIENTROOM
3281PATIENTROOM
3283PATIENTROOM
3285PATIENTROOM
3262a
3262a
326932713273
a5823a5823a3823a1823a9723
3289a
3289PATIENTROOM
3292PATIENTROOM
3292a
3294a
3295a
3294aPATIENT ROOM
3234
3225SATELLITE
CARDIAC CARE UNIT
3225a 3225b
X-231O.R.
RECEPTION
###OFFICE
3328
3345
3347
3330
3340
3338
33363334
3332
3331
3331a
3329
3325
3323
3323a 3321 3416FEMALELOCKERS
3412O.R.
RECEPTION
3412PACU
3436SOILEDUTILITY
3438NURSING STATION
(RECOVERY)
3440OFFICE
M NLK
333733353333
3326
3442REC. ISO.ROOM
3444STORAGE
3446STAFFLOUNGE
3448CLEANSUPPLY
3450ANAE.
WORK ROOM
3452EQUIP.STORAGE
3454DEPT. OF
ANAESTHESIA
3451OPERATING ROOM
#05
3449OPERATING ROOM
#04
3449OPERATING ROOM
#03
3447OPERATING ROOM
#2
3439OPERATING ROOM
#11
3453MAIN
CLEAN SUPPLY
3463OPERATING ROOM
#09
3463OPERATING ROOM
#08
3457OPERATING ROOM
#07
3455OPERATING ROOM
#06
###STERIL.RM.
3459INSTRU.CLEAN
3410SURGICAL
CARE CENTRE
3962OPERATING ROOM
#01
3406CARTROOM
3402ENDO MECH.
ROOM
3402EVS
3402ENDO MECH.
ROOM
CARTROOM
X-229STORAGE
3301OFFICE
3302LOCKERROOM
3303LOCKERROOM
3304W/R
3305ENV.SER.
3316O.R.
STORAGE
X-242
X-119
3310IP
LEARNING LAB
3308IP
LEARNING LAB
3306IP
LEARNING LAB
3320OFFICE
3547CONFERENCE
ROOM
3544SOILEDUTILITY
X-224
3539NOURISHMENT
ROOM
X-117CLEANSUPPLY
###ENV.SER.
3541W/R
3546CLEANSUPPLY
3542ELEC.
CLOSET #09
###ANTEROOM
3518OFFICE
3514SOILEDUTILITY
3515CLEANSUPPLY
X-217STAFFLOUNGE
X-118CLEANSUPPLY
X-212ANTEROOM
3513STAFF
3512ENV.SER.
3540CRITICAL CARE
B
3520CRITICAL CARE
A
1
2
3
13
14
15
16
3570W/R
3572PHYSICIAN
W/R
3573CLOSET #06
W/R
3581TREATMENTROOM
3582INTERVIEWROOM #01
3583INTERVIEWROOM #02
3584W/R
3585INTERVIEWROOM #03
3586INTERVIEWROOM #04
3587W/R
3587RECOVERY
20272018
20092000
2036
2009.8
993.7 1000.0 1010.0
166.34
174.34
178.1
FHC
SPRINK.
FHC
FHC
FHC
FHC
MED GAS
FHC
FHC
DAY SURGERY A
PACU H
BIRTHING SUITE
CCB CCA
PACU SURGICAL SUITES
67
101112
2
3
1
8
6 488
#18#17
#21
EXISTING PENTHOUS
EXISTING ROOF
EXISTING ELEC.RM. EXISTING
MECHANICALRM.
EXISTINGMECHANICAL
RM.
EXISTING ROOF
9101112
9101112
9101112
9101112
2
3
1
6 7
9 10
5
11 128
EXPANSION JOINT
EXISTING COURTYARDBELOW
#1
#3
#4
#5
#6
#7
3B CARDIO/MED3C
ACT
ACT
ACT
GYP CEILING, TERRAZZO FLOOR
ACT
ACT
ACT
ACT
ACTACT
ACT
ACT
ACT
ACT
ACT
GYP CEILING, TERRAZZO FLOOR
ACT
GYP
ACT
ACTACTACTACT
ACT
ACT
ACT
MTL PANEL
ACT
ACT
GYP
ACT
ACT
ACT
ACT ACT
ACT
ACT ACTACT ACT
ACT
ACT
ACT
ALUM CEILING
ACT
MTL PANEL
ALUM CEILING
ACTACT
ACTACT
ACTACT
ACTACT
ACTACT ACT
ACT
ACTACT
ACTACT
ACT ACT
ACTACT
Handwash
Handwash
DN
SS COUNTER SS COUNTER
skylight above
OR10
XXX
TWO-BED
1 0023
THREE-BED
1 0043
1 0053
1 0033
TWO
1 03
ONE-BED
1 1013
1 1023
1 1043
ONE-BEDBARRIER-FREE
1 1033
SOILEDWASH-UP/ UTILITY
1 2163
CLEANROOM
1 2173
CLEANROOM
1 2183 CYSTOSCOPY
1 2203
URODYNAMICS
1 2213
OPERATINGROOM A1
1 2223
OPERATINGROOM A2
1 2233
SCRUBAREA
1 2243
CORRIDOR
1 2253
CORRIDOR
1 2263
CLEAN UTILITYROOM
1 2193
CHANG
1
CHANGE
1 23
STORAGE RM
1 2043
W/C
1 2063
SOILEDHSE-KEE
1 2293
TRIAGE AND ASSESSMENTRECEPTION
2 0013
LBR/LBRP BEREAVEMENT C
2 0303
LBR/LBRP A
2 0123
LBR/LBRP A
2 0143
LBR/LBRP B
2 0163
LBR/LBRP A
2 0183
LBR/LBRP B
2 0203
LBR/LBRP A
2 0223
LBR
2
2 0153
2 0173
2 0193
2 0213
2 0233
2 0253
RECOVERYROOM
2 0513
OFFICE
2 0733
WR
2 0523
HK
2 0783
FEMALE CHANGE RM
2 0793
WR
2 0803
CLEANSUPPLY
2 0593
SOILED HOLDING
2 0603
OFFICE
2 0623
MONITORING ARCHIVE
2 0773
COMMUNICATIONCENTER
2 0653
WARMINGALCOVE
2 0683
STRTCHR AL
2 0583
REPORT/CONF
2 0723
CRCALC
23
SCRUB
2 0473
ALCOVE
2 0713
VISITOR WR B.F.
2 0743
FAMILY / PRE-OPWAITING
2 0763
EARLY LABOURFAMILY LOUNGE
2 0113
OFFICEON-CALL
2 0753
DISMANTLE& ASSEMBLY
2 1753
MOTHER RESIDNCE
2 1863
WR
2 1903
WR
2 1913
OR SUITE
2 3013
SHIELDED ORHDR
2 3143
CONTROL ROOM
2 3023
PLAN.WKRM
2 3033
CLEAN UTILITY
SOILED UTILITY
2 3063
EQUIP STORE
2 3073 RECOVERY BAYS
2 3083
PRE-OPHOLDING
2 3103
COUNSEL
2 3123 UNASS.
2 3133
CHNGE RM
2 3113
NRSHMNTCENTER
2 0643
SOILED
2 1713
RESPIRATORYTHERAPY
2 1763
MOTHER RESIDNCE
2 1873
MOTHERRESIDNCE
2 1893
MOTHER RESIDNCE
2 1883
CORRIDOR
2 0873
CORRIDOR
2 0843
CORRIDOR
2 0833
2 3093
2 3153
2 0533
2 0543
2 0553
2 0563
CORRIDOR
2 0883
CORRIDOR
2 0903
CORRIDOR
2 0823
TRIAGECHAIRS
2 0043
SCRUB AREA
2 3183
2 3203
LOCKERS
2 3213
EQUIPMENTSTORAGE
2 0633
NURSEPORTER
2 3223CRASH CART
2 3233
IMAV
23
NURSESTATION
2 0573
MED AREA
2 0023
TRIAGEWKSTN
2 0033
TRIAGECHAIRS
2 0053
TRIAGECHAIRS
2 0063
ELECTRICAL
2 0913
LAN
2 0923
CORRIDOR
2 0893
CORRIDOR
2 1963
CORRIDOR
2 1943
CORRIDOR
2 1953
CORRIDO
2 1973
KITCHEN
2 1853
H.K.
2 1183
WR
2 0813
EDUCATOROFFICE
2 2043
STRETCHER
2 0073STRETCHER
2 0083STRETCHER
2 0093
CARE BY PARENT
2 1793
CARE BYPARENT
2 1803
WR
2 1823
WR
2 1813
CLEAN UT
2 1703
WR
2 0103
PARENT AREA
2 1833
WRB-F
2 1843
CORRIDOR
2 1933
2 0313
2 0133
STAFFWC
2 0963
MONITORING ARCHIVE
2 0773
CONFERENCE
2 1663
PHYSICIANAREA
2 1033
STORE BASSINET
2 1723
2 1283
2 12332 1243
CORRIDOR
2 1983
LAN
2 2013ELEC
2 2023
WR
2 1783
HANDWASH
2 1253
WKSTN
2 1263
MONITORING ARCHIVE
2 0773
OFFICENURSE EDUCATOR
2 2003
ISOLATION
2 1653
2 1133
ANTE ROOM
2 1143
WAITING
2 1733
VISIW
2 13
HANDWASH
2 1963
C-SECTION OR
2 0433
ANAESTHETIC SUPPORT RM
2 0463
CLEANSUPPLY
2 0943
C-SECTION OR
2 0443
SCRUBAREA
2 0933
HOUSEKEEPING
2 0953
SCRUB
2 3243
VEST
2 0023
WC
3546
EL-2-A
EL-2-B
ST-2-B
DN
DN
DN
DN
DN
DN
DN
DN DN
DN
N
ABC
KEY PLAN
FG
H
Checked by:Project No.:
Drawing Title:
© Cannon Design 2013
© C
anno
n D
esig
n 20
13A
ll rig
hts
rese
rved
. No
part
of th
is d
ocum
ent m
aybe
repr
oduc
ed o
r util
ized
in a
ny fo
rm, w
ithou
t prio
rw
ritte
n au
thor
izat
ion
by T
he C
anno
n C
orpo
ratio
n.
No. STAGE 3.2 COSTING SUBMISSION 06-28-2013
MMM Group LimitedMechanical and Electrical Engineering
100 Commerce Valley Drive W.Thornhill , ON L3T 0A1
905.882.1100
Halsall Associates Ltd.Structural Engineering
2300 Yonge Street, Suite 2300Toronto, Ontario M4P 1E4
416.487.5256
200 University Avenue, Suite 1200Toronto, Ontario M5H 3C6
T: 416.915.0121F: 416.915.0122
2200 Eglinton Ave WestMISSISSAUGA , ONTARIO
Drawings are not to be scaled.
Contractor must verify all dimensions on the job andreport any discrepancy to architects before proceedingwith the work
All drawings and specifications are the property of thearchitect and must be returned at the completion of thework
This drawing is not to be used for construction untilcountersigned.
Signature: Date:
Trillium Health Partners
020629.00 R.S.
Credit Valley HospitalPriority Areas
Redevelopment Project(Phase 3)
05/0
8/20
13 8
:55:
54
3.2.1.9.03.1
PHASING PLAN - LEVEL 3
2 DD Ministry Submission 3.2 forCosting Review
28.06.20133 DD Ministry Submission 3.2 09.08.2013
NOTES:
- ALL AREAS OUTSIDE AREA OF CONSTRUCTION TO BE MAINTAINED FULLY OPERATIONAL
- EXISTING AREAS SHOWN IN BLACK & WHITE
-COMPLETED & OCCUPIED NEW CONSTRUCTION SHOWN WITH COLOUR
-REFERENCE WORK SEQUENCING DIAGRAMS
AREA OF CONSTRUCTION
MAINTAIN ACCESS THROUGH CONSTRUCTION
L3-XX
1
STAGE 1
L2-5
L3-2
L3-1
TEMP.CRITICAL CARE
TEMP.BEDROOMS
x-122
x-123
3242
3249
3247
3245
3243wc115
wc116
wc117
wc118wc119
wc120
wc121
wc122
3252
3254
3256
3258
wc112 wc111
3225
wc110wc109wc108
x-121
322332213219
wc107
3217
wc113
3235
3238
wc114
3261
wc106
wc105
3262
3265
wc104wc103
3271
3273
3270
wc102
3279 3281
wc101 wc100
3283 3285
wc99
wc97
wc96
wc98
3289
3292
wc95
3212
3234
3201
3205
3204
wc86
3208
3200
3207
3206
3295wc85
3294
3269
3260
3179 3181 3183 3185
3173
wc241 wc240 wc239 wc238 3187
wc212 wc213
3170
3169
3189
3192
wc236
wc237
3165
wc214
wc215
3162
3171
3194
wc2353195
3105
3104
3103
3102
3101 3100
3106
3107
3108wc234
3115
3117 3119 3121 3123
31313133
3134
wc225
3135
3138
wc224
3141
3142
3143wc223
3145wc222
wc2213147
3149wc220
3152wc219
3154wc218
3156
3158wc216
wc217
3160
31513251
3125
R25
RJ
RH
RG
RF
RE
F
L
K
N1x N1 N2 N3
NFx
NG
NH
NJ
NK
NL
NLx
H
N25
9y 10 11 12 13 14 15 16 17 18 19 20
21
23 24 25 26 27
Ax
A
Dx
Ex
G
N25
25x
Fx
N25
AC
AB
AD
AE
D
E
N4 N4x
NT
NU
N5 N5x
N5y
N6 N7 N8
NS
NR
NQ
NP
NN
NM
NS
NR
NQ
NP
NN
NM
N17N17x
N17y
N18N19 N20
NT
NU
N9 N10 N11 N12N13 N14 N15 N16N16x
NF
N8NE
ND
NC
NB
NA
H
NF
NE
ND
NC
NB
NA
H
N20xN21N22 N23 N24N24N24
NG
NK
x-90
x-89
3302
3301
x-119
x-116
x-117
3403
3514
x-118
3448
3320
3310
3308
3306
33053304
x-242
3316
3321
3416
3570
3572
3573
Closet 6
35843585
3586358335823581
3576 3577
3587
x-225
3410 3408 34063401
3412
x-223
x-222
x-221 x-220 x-218x-219
3546
3547
3544
3542
3540
3537
3538
3539
3531
3518
3515
x-217
3513
3520
x-208 x-209 x-210 x-211 x-213
x-214
x-215
x-216
x-212
3324
3342
3326
3323
3321
3325 3341
33303338
3340
3345
3341
3339
3337
3336
33353333
3331
3329
3349
3334
3332
x-227
3424
3440
3438
3422
454325430543644344432443
3445 3449 34513443x-228
3439 3453
346134633459
34553457
3400x-2293402
x-224
x-226
x-230x-231
3542
wc-242
wc-243
wc-244 wc-246
sh
wc-248
wc-245
FHC
wc-247
pipes
ACT @ 2.7m
SH
FHC
x-206
x-205
3100CONFERENCE
ROOM
3101CRITICAL
3102OFFICE
3103OFFICE
3100NOURISHMENT
3105ENVIRONMENTAL
SERVICES
3106STAFFLOUNGE
3107SOILEDUTILITY
3108PATIENTROOM
3108PATIENTROOM
3112PATIENTROOM
3115PATIENTROOM
3117PATIENTROOM
3119PATIENTROOM
3121PATIENTROOM
3123PATIENT
3125PATIENTROOM
3131PATIENTROOM
3133PATIENTROOM
3134SHOWERROOM
3135PATIENTROOM
3138PATIENTROOM3141
SHOWERROOM
3142CLEANUTILITY
3143PATIENTROOM
3145PATIENTROOM
3147PATIENTROOM
3149PATIENTROOM
3160MEDICATION
ROOM
3158PATIENTROOM
3156PATIENTROOM
3154PATIENTROOM
3152PATIENTROOM
3151PATIENT &FAMILY
3162PATIENTROOM
3165PATIENTROOM
3169
ROOM
3170OFFICE
3171PATIENTROOM
3173PATIENTROOM
3179PATIENTROOM
3181PATIENTROOM
3183PATIENTROOM
3185PATIENTROOM
3189PATIENTROOM
3192PATIENTROOM
3195PATIENTROOM
3108a
3112a
3115a
a3213a1213a9113a7113
3125a3131a
3135a
3138a
3143a
3145a
3147a
3149a
3156a
3154a
3152a
3158a
3200OR
BOOKING
3206OFFICE
3207SOILEDHOLDING
3208PATIENTROOM
3205ENVIRO.SERVICES
3205NOURISHMENT
CENTRE
3201WAITINGAREA
3213CRITICALCARE
3213a
3213b
3217PATIENTROOM
3217a
3219PATIENTROOM
3219a
3221PATIENTROOM
3221a
3223PATIENTROOM
3223a
3235PATIENTROOM
3235a
3238PATIENTROOM
3238a
3242PATIENTROOM
3243PATIENTROOM
3245PATIENTROOM
3247PATIENTROOM
3249PATIENTROOM
3242PATIENTROOM
3258PATIENTROOM
3256PATIENTROOM
3254PATIENTROOM
3252aPATIENTROOM
3243a
3245a
3247a
3249a
3258a
3256a
3254a
3252a
3261STAFF
3262PATIENTROOM
3265PATIENTROOM
3270JIT
SUPPLES
3271PATIENTROOM
3273PATIENTROOM
3279PATIENTROOM
3281PATIENTROOM
3283PATIENTROOM
3285PATIENTROOM
3262a
3262a
326932713273
a5823a5823a3823a1823a9723
3289a
3289PATIENTROOM
3292PATIENTROOM
3292a
3294a
3295a
3294aPATIENT ROOM
3234
3225SATELLITE
CARDIAC CARE UNIT
3225a 3225b
X-231O.R.
RECEPTION
###OFFICE
3328
3345
3347
3330
3340
3338
33363334
3332
3331
3331a
3329
3325
3323
3323a 3321 3416FEMALELOCKERS
3412O.R.
RECEPTION
3412PACU
3436SOILEDUTILITY
3438NURSING STATION
(RECOVERY)
3440OFFICE
M NLK
333733353333
3326
3442REC. ISO.ROOM
3444STORAGE
3446STAFFLOUNGE
3448CLEANSUPPLY
3450ANAE.
WORK ROOM
3452EQUIP.STORAGE
3454DEPT. OF
ANAESTHESIA
3451OPERATING ROOM
#05
3449OPERATING ROOM
#04
3449OPERATING ROOM
#03
3447OPERATING ROOM
#2
3439OPERATING ROOM
#11
3453MAIN
CLEAN SUPPLY
3463OPERATING ROOM
#09
3463OPERATING ROOM
#08
3457OPERATING ROOM
#07
3455OPERATING ROOM
#06
###STERIL.RM.
3459INSTRU.CLEAN
3410SURGICAL
CARE CENTRE
3962OPERATING ROOM
#01
3406CARTROOM
3402ENDO MECH.
ROOM
3402EVS
3402ENDO MECH.
ROOM
CARTROOM
X-229STORAGE
3301OFFICE
3302LOCKERROOM
3303LOCKERROOM
3304W/R
3305ENV.SER.
3316O.R.
STORAGE
X-242
X-119
3310IP
LEARNING LAB
3308IP
LEARNING LAB
3306IP
LEARNING LAB
3320OFFICE
3547CONFERENCE
ROOM
3544SOILEDUTILITY
X-224
3539NOURISHMENT
ROOM
X-117CLEANSUPPLY
###ENV.SER.
3541W/R
3546CLEANSUPPLY
3542ELEC.
CLOSET #09
###ANTEROOM
3518OFFICE
3514SOILEDUTILITY
3515CLEANSUPPLY
X-217STAFFLOUNGE
X-118CLEANSUPPLY
X-212ANTEROOM
3513STAFF
3512ENV.SER.
3540CRITICAL CARE
B
3520CRITICAL CARE
A
1
2
3
13
14
15
16
3570W/R
3572PHYSICIAN
W/R
3573CLOSET #06
W/R
3581TREATMENTROOM
3582INTERVIEWROOM #01
3583INTERVIEWROOM #02
3584W/R
3585INTERVIEWROOM #03
3586INTERVIEWROOM #04
3587W/R
3587RECOVERY
20272018
20092000
2036
2009.8
993.7 1000.0 1010.0
166.34
174.34
178.1
FHC
SPRINK.
FHC
FHC
FHC
FHC
MED GAS
FHC
FHC
DAY SURGERY A
PACU H
BIRTHING SUITE
CCB CCA
PACU SURGICAL SUITES
67
101112
2
3
1
8
6 488
#18#17
#21
EXISTING PENTHOUS
EXISTING ROOF
EXISTING ELEC.RM. EXISTING
MECHANICALRM.
EXISTINGMECHANICAL
RM.
EXISTING ROOF
9101112
9101112
9101112
9101112
2
3
1
6 7
9 10
5
11 128
EXPANSION JOINT
EXISTING COURTYARDBELOW
#1
#3
#4
#5
#6
#7
3B CARDIO/MED3C
ACT
ACT
ACT
GYP CEILING, TERRAZZO FLOOR
ACT
ACT
ACT
ACT
ACTACT
ACT
ACT
ACT
ACT
ACT
GYP CEILING, TERRAZZO FLOOR
ACT
GYP
ACT
ACTACTACTACT
ACT
ACT
ACT
MTL PANEL
ACT
ACT
GYP
ACT
ACT
ACT
ACT ACT
ACT
ACT ACTACT ACT
ACT
ACT
ACT
ALUM CEILING
ACT
MTL PANEL
ALUM CEILING
ACTACT
ACTACT
ACTACT
ACTACT
ACTACT ACT
ACT
ACTACT
ACTACT
ACT ACT
ACTACT
Handwash
Handwash
DN
SS COUNTER SS COUNTER
skylight above
OR10
XXX
TWO-BED
1 0023
THREE-BED
1 0043
1 0053
1 0033
TWO
1 03
ONE-BED
1 1013
1 1023
1 1043
ONE-BEDBARRIER-FREE
1 1033
SOILEDWASH-UP/ UTILITY
1 2163
CLEANROOM
1 2173
CLEANROOM
1 2183 CYSTOSCOPY
1 2203
URODYNAMICS
1 2213
OPERATINGROOM A1
1 2223
OPERATINGROOM A2
1 2233
SCRUBAREA
1 2243
CORRIDOR
1 2253
CORRIDOR
1 2263
CLEAN UTILITYROOM
1 2193
CHANG
1
CHANGE
1 23
STORAGE RM
1 2043
W/C
1 2063
SOILEDHSE-KEE
1 2293
TRIAGE AND ASSESSMENTRECEPTION
2 0013
LBR/LBRP BEREAVEMENT C
2 0303
LBR/LBRP A
2 0123
LBR/LBRP A
2 0143
LBR/LBRP B
2 0163
LBR/LBRP A
2 0183
LBR/LBRP B
2 0203
LBR/LBRP A
2 0223
LBR
2
2 0153
2 0173
2 0193
2 0213
2 0233
2 0253
RECOVERYROOM
2 0513
OFFICE
2 0733
WR
2 0523
HK
2 0783
FEMALE CHANGE RM
2 0793
WR
2 0803
CLEANSUPPLY
2 0593
SOILED HOLDING
2 0603
OFFICE
2 0623
MONITORING ARCHIVE
2 0773
COMMUNICATIONCENTER
2 0653
WARMINGALCOVE
2 0683
STRTCHR AL
2 0583
REPORT/CONF
2 0723
CRCALC
23
SCRUB
2 0473
ALCOVE
2 0713
VISITOR WR B.F.
2 0743
FAMILY / PRE-OPWAITING
2 0763
EARLY LABOURFAMILY LOUNGE
2 0113
OFFICEON-CALL
2 0753
DISMANTLE& ASSEMBLY
2 1753
MOTHER RESIDNCE
2 1863
WR
2 1903
WR
2 1913
OR SUITE
2 3013
SHIELDED ORHDR
2 3143
CONTROL ROOM
2 3023
PLAN.WKRM
2 3033
CLEAN UTILITY
SOILED UTILITY
2 3063
EQUIP STORE
2 3073 RECOVERY BAYS
2 3083
PRE-OPHOLDING
2 3103
COUNSEL
2 3123 UNASS.
2 3133
CHNGE RM
2 3113
NRSHMNTCENTER
2 0643
SOILED
2 1713
RESPIRATORYTHERAPY
2 1763
MOTHER RESIDNCE
2 1873
MOTHERRESIDNCE
2 1893
MOTHER RESIDNCE
2 1883
CORRIDOR
2 0873
CORRIDOR
2 0843
CORRIDOR
2 0833
2 3093
2 3153
2 0533
2 0543
2 0553
2 0563
CORRIDOR
2 0883
CORRIDOR
2 0903
CORRIDOR
2 0823
TRIAGECHAIRS
2 0043
SCRUB AREA
2 3183
2 3203
LOCKERS
2 3213
EQUIPMENTSTORAGE
2 0633
NURSEPORTER
2 3223CRASH CART
2 3233
IMAV
23
NURSESTATION
2 0573
MED AREA
2 0023
TRIAGEWKSTN
2 0033
TRIAGECHAIRS
2 0053
TRIAGECHAIRS
2 0063
ELECTRICAL
2 0913
LAN
2 0923
CORRIDOR
2 0893
CORRIDOR
2 1963
CORRIDOR
2 1943
CORRIDOR
2 1953
CORRIDO
2 1973
KITCHEN
2 1853
H.K.
2 1183
WR
2 0813
EDUCATOROFFICE
2 2043
STRETCHER
2 0073STRETCHER
2 0083STRETCHER
2 0093
CARE BY PARENT
2 1793
CARE BYPARENT
2 1803
WR
2 1823
WR
2 1813
CLEAN UT
2 1703
WR
2 0103
PARENT AREA
2 1833
WRB-F
2 1843
CORRIDOR
2 1933
2 0313
2 0133
STAFFWC
2 0963
MONITORING ARCHIVE
2 0773
CONFERENCE
2 1663
PHYSICIANAREA
2 1033
STORE BASSINET
2 1723
2 1283
2 12332 1243
CORRIDOR
2 1983
LAN
2 2013ELEC
2 2023
WR
2 1783
HANDWASH
2 1253
WKSTN
2 1263
MONITORING ARCHIVE
2 0773
OFFICENURSE EDUCATOR
2 2003
ISOLATION
2 1653
2 1133
ANTE ROOM
2 1143
WAITING
2 1733
VISIW
2 13
HANDWASH
2 1963
C-SECTION OR
2 0433
ANAESTHETIC SUPPORT RM
2 0463
CLEANSUPPLY
2 0943
C-SECTION OR
2 0443
SCRUBAREA
2 0933
HOUSEKEEPING
2 0953
SCRUB
2 3243
VEST
2 0023
WC
3546
EL-2-A
EL-2-B
ST-2-B
DN
DN
DN
DN
DN
DN
DN
DN DN
DN
N
ABC
KEY PLAN
FG
H
Checked by:Project No.:
Drawing Title:
© Cannon Design 2013
© C
anno
n D
esig
n 20
13A
ll rig
hts
rese
rved
. No
part
of th
is d
ocum
ent m
aybe
repr
oduc
ed o
r util
ized
in a
ny fo
rm, w
ithou
t prio
rw
ritte
n au
thor
izat
ion
by T
he C
anno
n C
orpo
ratio
n.
No. STAGE 3.2 COSTING SUBMISSION 06-28-2013
MMM Group LimitedMechanical and Electrical Engineering
100 Commerce Valley Drive W.Thornhill , ON L3T 0A1
905.882.1100
Halsall Associates Ltd.Structural Engineering
2300 Yonge Street, Suite 2300Toronto, Ontario M4P 1E4
416.487.5256
200 University Avenue, Suite 1200Toronto, Ontario M5H 3C6
T: 416.915.0121F: 416.915.0122
2200 Eglinton Ave WestMISSISSAUGA , ONTARIO
Drawings are not to be scaled.
Contractor must verify all dimensions on the job andreport any discrepancy to architects before proceedingwith the work
All drawings and specifications are the property of thearchitect and must be returned at the completion of thework
This drawing is not to be used for construction untilcountersigned.
Signature: Date:
Trillium Health Partners
020629.00 R.S.
Credit Valley HospitalPriority Areas
Redevelopment Project(Phase 3)
05/0
8/20
13 8
:55:
54
3.2.1.9.03.3
PHASING PLAN - LEVEL 3
2 DD Ministry Submission 3.2 forCosting Review
28.06.20133 DD Ministry Submission 3.2 09.08.2013
NOTES:
- ALL AREAS OUTSIDE AREA OF CONSTRUCTION TO BE MAINTAINED FULLY OPERATIONAL
- EXISTING AREAS SHOWN IN BLACK & WHITE
-COMPLETED & OCCUPIED NEW CONSTRUCTION SHOWN WITH COLOUR
-REFERENCE WORK SEQUENCING DIAGRAMS
AREA OF CONSTRUCTION
MAINTAIN ACCESS THROUGH CONSTRUCTION
L3-XX
STAGE 3
L2-5
L3-4
x-122
x-123
3242
3249
3247
3245
3243wc115
wc116
wc117
wc118wc119
wc120
wc121
wc122
3252
3254
3256
3258
wc112 wc111
3225
wc110wc109wc108
x-121
322332213219
wc107
3217
wc113
3235
3238
wc114
3261
wc106
wc105
3262
3265
wc104wc103
3271
3273
3270
wc102
3279 3281
wc101 wc100
3283 3285
wc99
wc97
wc96
wc98
3289
3292
wc95
3212
3234
3201
3205
3204
wc86
3208
3200
3207
3206
3295wc85
3294
3269
3260
3179 3181 3183 3185
3173
wc241 wc240 wc239 wc238 3187
wc212 wc213
3170
3169
3189
3192
wc236
wc237
3165
wc214
wc215
3162
3171
3194
wc2353195
3105
3104
3103
3102
3101 3100
3106
3107
3108wc234
3115
3117 3119 3121 3123
31313133
3134
wc225
3135
3138
wc224
3141
3142
3143wc223
3145wc222
wc2213147
3149wc220
3152wc219
3154wc218
3156
3158wc216
wc217
3160
31513251
3125
R25
RJ
RH
RG
RF
RE
F
L
K
N1x N1 N2 N3
NFx
NG
NH
NJ
NK
NL
NLx
H
N25
9y 10 11 12 13 14 15 16 17 18 19 20
21
23 24 25 26 27
Ax
A
Dx
Ex
G
N25
25x
Fx
N25
AC
AB
AD
AE
D
E
N4 N4x
NT
NU
N5 N5x
N5y
N6 N7 N8
NS
NR
NQ
NP
NN
NM
NS
NR
NQ
NP
NN
NM
N17N17x
N17y
N18N19 N20
NT
NU
N9 N10 N11 N12N13 N14 N15 N16N16x
NF
N8NE
ND
NC
NB
NA
H
NF
NE
ND
NC
NB
NA
H
N20xN21N22 N23 N24N24N24
NG
NK
x-90
x-89
3302
3301
x-119
x-116
x-117
3403
3514
x-118
3448
3320
3310
3308
3306
33053304
x-242
3316
3321
3416
3570
3572
3573
Closet 6
35843585
3586358335823581
3576 3577
3587
x-225
3410 3408 34063401
3412
x-223
x-222
x-221 x-220 x-218x-219
3546
3547
3544
3542
3540
3537
3538
3539
3531
3518
3515
x-217
3513
3520
x-208 x-209 x-210 x-211 x-213
x-214
x-215
x-216
x-212
3324
3342
3326
3323
3321
3325 3341
33303338
3340
3345
3341
3339
3337
3336
33353333
3331
3329
3349
3334
3332
x-227
3424
3440
3438
3422
454325430543644344432443
3445 3449 34513443x-228
3439 3453
346134633459
34553457
3400x-2293402
x-224
x-226
x-230x-231
3542
wc-242
wc-243
wc-244 wc-246
sh
wc-248
wc-245
FHC
wc-247
pipes
ACT @ 2.7m
SH
FHC
x-206
x-205
3100CONFERENCE
ROOM
3101CRITICAL
3102OFFICE
3103OFFICE
3100NOURISHMENT
3105ENVIRONMENTAL
SERVICES
3106STAFFLOUNGE
3107SOILEDUTILITY
3108PATIENTROOM
3108PATIENTROOM
3112PATIENTROOM
3115PATIENTROOM
3117PATIENTROOM
3119PATIENTROOM
3121PATIENTROOM
3123PATIENT
3125PATIENTROOM
3131PATIENTROOM
3133PATIENTROOM
3134SHOWERROOM
3135PATIENTROOM
3138PATIENTROOM3141
SHOWERROOM
3142CLEANUTILITY
3143PATIENTROOM
3145PATIENTROOM
3147PATIENTROOM
3149PATIENTROOM
3160MEDICATION
ROOM
3158PATIENTROOM
3156PATIENTROOM
3154PATIENTROOM
3152PATIENTROOM
3151PATIENT &FAMILY
3162PATIENTROOM
3165PATIENTROOM
3169
ROOM
3170OFFICE
3171PATIENTROOM
3173PATIENTROOM
3179PATIENTROOM
3181PATIENTROOM
3183PATIENTROOM
3185PATIENTROOM
3189PATIENTROOM
3192PATIENTROOM
3195PATIENTROOM
3108a
3112a
3115a
a3213a1213a9113a7113
3125a3131a
3135a
3138a
3143a
3145a
3147a
3149a
3156a
3154a
3152a
3158a
3200OR
BOOKING
3206OFFICE
3207SOILEDHOLDING
3208PATIENTROOM
3205ENVIRO.SERVICES
3205NOURISHMENT
CENTRE
3201WAITINGAREA
3213CRITICALCARE
3213a
3213b
3217PATIENTROOM
3217a
3219PATIENTROOM
3219a
3221PATIENTROOM
3221a
3223PATIENTROOM
3223a
3235PATIENTROOM
3235a
3238PATIENTROOM
3238a
3242PATIENTROOM
3243PATIENTROOM
3245PATIENTROOM
3247PATIENTROOM
3249PATIENTROOM
3242PATIENTROOM
3258PATIENTROOM
3256PATIENTROOM
3254PATIENTROOM
3252aPATIENTROOM
3243a
3245a
3247a
3249a
3258a
3256a
3254a
3252a
3261STAFF
3262PATIENTROOM
3265PATIENTROOM
3270JIT
SUPPLES
3271PATIENTROOM
3273PATIENTROOM
3279PATIENTROOM
3281PATIENTROOM
3283PATIENTROOM
3285PATIENTROOM
3262a
3262a
326932713273
a5823a5823a3823a1823a9723
3289a
3289PATIENTROOM
3292PATIENTROOM
3292a
3294a
3295a
3294aPATIENT ROOM
3234
3225SATELLITE
CARDIAC CARE UNIT
3225a 3225b
X-231O.R.
RECEPTION
###OFFICE
3328
3345
3347
3330
3340
3338
33363334
3332
3331
3331a
3329
3325
3323
3323a 3321 3416FEMALELOCKERS
3412O.R.
RECEPTION
3412PACU
3436SOILEDUTILITY
3438NURSING STATION
(RECOVERY)
3440OFFICE
M NLK
333733353333
3326
3442REC. ISO.ROOM
3444STORAGE
3446STAFFLOUNGE
3448CLEANSUPPLY
3450ANAE.
WORK ROOM
3452EQUIP.STORAGE
3454DEPT. OF
ANAESTHESIA
3451OPERATING ROOM
#05
3449OPERATING ROOM
#04
3449OPERATING ROOM
#03
3447OPERATING ROOM
#2
3439OPERATING ROOM
#11
3453MAIN
CLEAN SUPPLY
3463OPERATING ROOM
#09
3463OPERATING ROOM
#08
3457OPERATING ROOM
#07
3455OPERATING ROOM
#06
###STERIL.RM.
3459INSTRU.CLEAN
3410SURGICAL
CARE CENTRE
3962OPERATING ROOM
#01
3406CARTROOM
3402ENDO MECH.
ROOM
3402EVS
3402ENDO MECH.
ROOM
CARTROOM
X-229STORAGE
3301OFFICE
3302LOCKERROOM
3303LOCKERROOM
3304W/R
3305ENV.SER.
3316O.R.
STORAGE
X-242
X-119
3310IP
LEARNING LAB
3308IP
LEARNING LAB
3306IP
LEARNING LAB
3320OFFICE
3547CONFERENCE
ROOM
3544SOILEDUTILITY
X-224
3539NOURISHMENT
ROOM
X-117CLEANSUPPLY
###ENV.SER.
3541W/R
3546CLEANSUPPLY
3542ELEC.
CLOSET #09
###ANTEROOM
3518OFFICE
3514SOILEDUTILITY
3515CLEANSUPPLY
X-217STAFFLOUNGE
X-118CLEANSUPPLY
X-212ANTEROOM
3513STAFF
3512ENV.SER.
3540CRITICAL CARE
B
3520CRITICAL CARE
A
1
2
3
13
14
15
16
3570W/R
3572PHYSICIAN
W/R
3573CLOSET #06
W/R
3581TREATMENTROOM
3582INTERVIEWROOM #01
3583INTERVIEWROOM #02
3584W/R
3585INTERVIEWROOM #03
3586INTERVIEWROOM #04
3587W/R
3587RECOVERY
20272018
20092000
2036
2009.8
993.7 1000.0 1010.0
166.34
174.34
178.1
FHC
SPRINK.
FHC
FHC
FHC
FHC
MED GAS
FHC
FHC
DAY SURGERY A
PACU H
BIRTHING SUITE
CCB CCA
PACU SURGICAL SUITES
67
101112
2
3
1
8
6 488
#18#17
#21
EXISTING PENTHOUS
EXISTING ROOF
EXISTING ELEC.RM. EXISTING
MECHANICALRM.
EXISTINGMECHANICAL
RM.
EXISTING ROOF
9101112
9101112
9101112
9101112
2
3
1
6 7
9 10
5
11 128
EXPANSION JOINT
EXISTING COURTYARDBELOW
#1
#3
#4
#5
#6
#7
3B CARDIO/MED3C
ACT
ACT
ACT
GYP CEILING, TERRAZZO FLOOR
ACT
ACT
ACT
ACT
ACTACT
ACT
ACT
ACT
ACT
ACT
GYP CEILING, TERRAZZO FLOOR
ACT
GYP
ACT
ACTACTACTACT
ACT
ACT
ACT
MTL PANEL
ACT
ACT
GYP
ACT
ACT
ACT
ACT ACT
ACT
ACT ACTACT ACT
ACT
ACT
ACT
ALUM CEILING
ACT
MTL PANEL
ALUM CEILING
ACTACT
ACTACT
ACTACT
ACTACT
ACTACT ACT
ACT
ACTACT
ACTACT
ACT ACT
ACTACT
Handwash
Handwash
DN
SS COUNTER SS COUNTER
skylight above
OR10
XXX
TWO-BED
1 0023
THREE-BED
1 0043
1 0053
1 0033
TWO
1 03
ONE-BED
1 1013
1 1023
1 1043
ONE-BEDBARRIER-FREE
1 1033
SOILEDWASH-UP/ UTILITY
1 2163
CLEANROOM
1 2173
CLEANROOM
1 2183 CYSTOSCOPY
1 2203
URODYNAMICS
1 2213
OPERATINGROOM A1
1 2223
OPERATINGROOM A2
1 2233
SCRUBAREA
1 2243
CORRIDOR
1 2253
CORRIDOR
1 2263
CLEAN UTILITYROOM
1 2193
CHANG
1
CHANGE
1 23
STORAGE RM
1 2043
W/C
1 2063
SOILEDHSE-KEE
1 2293
TRIAGE AND ASSESSMENTRECEPTION
2 0013
LBR/LBRP BEREAVEMENT C
2 0303
LBR/LBRP A
2 0123
LBR/LBRP A
2 0143
LBR/LBRP B
2 0163
LBR/LBRP A
2 0183
LBR/LBRP B
2 0203
LBR/LBRP A
2 0223
LBR
2
2 0153
2 0173
2 0193
2 0213
2 0233
2 0253
RECOVERYROOM
2 0513
OFFICE
2 0733
WR
2 0523
HK
2 0783
FEMALE CHANGE RM
2 0793
WR
2 0803
CLEANSUPPLY
2 0593
SOILED HOLDING
2 0603
OFFICE
2 0623
MONITORING ARCHIVE
2 0773
COMMUNICATIONCENTER
2 0653
WARMINGALCOVE
2 0683
STRTCHR AL
2 0583
REPORT/CONF
2 0723
CRCALC
23
SCRUB
2 0473
ALCOVE
2 0713
VISITOR WR B.F.
2 0743
FAMILY / PRE-OPWAITING
2 0763
EARLY LABOURFAMILY LOUNGE
2 0113
OFFICEON-CALL
2 0753
DISMANTLE& ASSEMBLY
2 1753
MOTHER RESIDNCE
2 1863
WR
2 1903
WR
2 1913
OR SUITE
2 3013
SHIELDED ORHDR
2 3143
CONTROL ROOM
2 3023
PLAN.WKRM
2 3033
CLEAN UTILITY
SOILED UTILITY
2 3063
EQUIP STORE
2 3073 RECOVERY BAYS
2 3083
PRE-OPHOLDING
2 3103
COUNSEL
2 3123 UNASS.
2 3133
CHNGE RM
2 3113
NRSHMNTCENTER
2 0643
SOILED
2 1713
RESPIRATORYTHERAPY
2 1763
MOTHER RESIDNCE
2 1873
MOTHERRESIDNCE
2 1893
MOTHER RESIDNCE
2 1883
CORRIDOR
2 0873
CORRIDOR
2 0843
CORRIDOR
2 0833
2 3093
2 3153
2 0533
2 0543
2 0553
2 0563
CORRIDOR
2 0883
CORRIDOR
2 0903
CORRIDOR
2 0823
TRIAGECHAIRS
2 0043
SCRUB AREA
2 3183
2 3203
LOCKERS
2 3213
EQUIPMENTSTORAGE
2 0633
NURSEPORTER
2 3223CRASH CART
2 3233
IMAV
23
NURSESTATION
2 0573
MED AREA
2 0023
TRIAGEWKSTN
2 0033
TRIAGECHAIRS
2 0053
TRIAGECHAIRS
2 0063
ELECTRICAL
2 0913
LAN
2 0923
CORRIDOR
2 0893
CORRIDOR
2 1963
CORRIDOR
2 1943
CORRIDOR
2 1953
CORRIDO
2 1973
KITCHEN
2 1853
H.K.
2 1183
WR
2 0813
EDUCATOROFFICE
2 2043
STRETCHER
2 0073STRETCHER
2 0083STRETCHER
2 0093
CARE BY PARENT
2 1793
CARE BYPARENT
2 1803
WR
2 1823
WR
2 1813
CLEAN UT
2 1703
WR
2 0103
PARENT AREA
2 1833
WRB-F
2 1843
CORRIDOR
2 1933
2 0313
2 0133
STAFFWC
2 0963
MONITORING ARCHIVE
2 0773
CONFERENCE
2 1663
PHYSICIANAREA
2 1033
STORE BASSINET
2 1723
2 1283
2 12332 1243
CORRIDOR
2 1983
LAN
2 2013ELEC
2 2023
WR
2 1783
HANDWASH
2 1253
WKSTN
2 1263
MONITORING ARCHIVE
2 0773
OFFICENURSE EDUCATOR
2 2003
ISOLATION
2 1653
2 1133
ANTE ROOM
2 1143
WAITING
2 1733
VISIW
2 13
HANDWASH
2 1963
C-SECTION OR
2 0433
ANAESTHETIC SUPPORT RM
2 0463
CLEANSUPPLY
2 0943
C-SECTION OR
2 0443
SCRUBAREA
2 0933
HOUSEKEEPING
2 0953
SCRUB
2 3243
VEST
2 0023
WC
3546
EL-2-A
EL-2-B
ST-2-B
DN
DN
DN
DN
DN
DN
DN
DN DN
DN
N
ABC
KEY PLAN
FG
H
Checked by:Project No.:
Drawing Title:
© Cannon Design 2013
© C
anno
n D
esig
n 20
13A
ll rig
hts
rese
rved
. No
part
of th
is d
ocum
ent m
aybe
repr
oduc
ed o
r util
ized
in a
ny fo
rm, w
ithou
t prio
rw
ritte
n au
thor
izat
ion
by T
he C
anno
n C
orpo
ratio
n.
No. STAGE 3.2 COSTING SUBMISSION 06-28-2013
MMM Group LimitedMechanical and Electrical Engineering
100 Commerce Valley Drive W.Thornhill , ON L3T 0A1
905.882.1100
Halsall Associates Ltd.Structural Engineering
2300 Yonge Street, Suite 2300Toronto, Ontario M4P 1E4
416.487.5256
200 University Avenue, Suite 1200Toronto, Ontario M5H 3C6
T: 416.915.0121F: 416.915.0122
2200 Eglinton Ave WestMISSISSAUGA , ONTARIO
Drawings are not to be scaled.
Contractor must verify all dimensions on the job andreport any discrepancy to architects before proceedingwith the work
All drawings and specifications are the property of thearchitect and must be returned at the completion of thework
This drawing is not to be used for construction untilcountersigned.
Signature: Date:
Trillium Health Partners
020629.00 R.S.
Credit Valley HospitalPriority Areas
Redevelopment Project(Phase 3)
05/0
8/20
13 8
:55:
54
3.2.1.9.03.4
PHASING PLAN - LEVEL 3
2 DD Ministry Submission 3.2 forCosting Review
28.06.20133 DD Ministry Submission 3.2 09.08.2013
NOTES:
- ALL AREAS OUTSIDE AREA OF CONSTRUCTION TO BE MAINTAINED FULLY OPERATIONAL
- EXISTING AREAS SHOWN IN BLACK & WHITE
-COMPLETED & OCCUPIED NEW CONSTRUCTION SHOWN WITH COLOUR
-REFERENCE WORK SEQUENCING DIAGRAMS
AREA OF CONSTRUCTION
MAINTAIN ACCESS THROUGH CONSTRUCTION
L3-XX
STAGE 4
L3-5
TEMP. RECOVERY(NO WORK REQUIRED)
x-122
x-123
3242
3249
3247
3245
3243wc115
wc116
wc117
wc118wc119
wc120
wc121
wc122
3252
3254
3256
3258
wc112 wc111
3225
wc110wc109wc108
x-121
322332213219
wc107
3217
wc113
3235
3238
wc114
3261
wc106
wc105
3262
3265
wc104wc103
3271
3273
3270
wc102
3279 3281
wc101 wc100
3283 3285
wc99
wc97
wc96
wc98
3289
3292
wc95
3212
3234
3201
3205
3204
wc86
3208
3200
3207
3206
3295wc85
3294
3269
3260
3179 3181 3183 3185
3173
wc241 wc240 wc239 wc238 3187
wc212 wc213
3170
3169
3189
3192
wc236
wc237
3165
wc214
wc215
3162
3171
3194
wc2353195
3105
3104
3103
3102
3101 3100
3106
3107
3108wc234
3115
3117 3119 3121 3123
31313133
3134
wc225
3135
3138
wc224
3141
3142
3143wc223
3145wc222
wc2213147
3149wc220
3152wc219
3154wc218
3156
3158wc216
wc217
3160
31513251
3125
R25
RJ
RH
RG
RF
RE
F
L
K
N1x N1 N2 N3
NFx
NG
NH
NJ
NK
NL
NLx
H
N25
9y 10 11 12 13 14 15 16 17 18 19 20
21
23 24 25 26 27
Ax
A
Dx
Ex
G
N25
25x
Fx
N25
AC
AB
AD
AE
D
E
N4 N4x
NT
NU
N5 N5x
N5y
N6 N7 N8
NS
NR
NQ
NP
NN
NM
NS
NR
NQ
NP
NN
NM
N17N17x
N17y
N18N19 N20
NT
NU
N9 N10 N11 N12N13 N14 N15 N16N16x
NF
N8NE
ND
NC
NB
NA
H
NF
NE
ND
NC
NB
NA
H
N20xN21N22 N23 N24N24N24
NG
NK
x-90
x-89
3302
3301
x-119
x-116
x-117
3403
3514
x-118
3448
3320
3310
3308
3306
33053304
x-242
3316
3321
3416
3570
3572
3573
Closet 6
35843585
3586358335823581
3576 3577
3587
x-225
3410 3408 34063401
3412
x-223
x-222
x-221 x-220 x-218x-219
3546
3547
3544
3542
3540
3537
3538
3539
3531
3518
3515
x-217
3513
3520
x-208 x-209 x-210 x-211 x-213
x-214
x-215
x-216
x-212
3324
3342
3326
3323
3321
3325 3341
33303338
3340
3345
3341
3339
3337
3336
33353333
3331
3329
3349
3334
3332
x-227
3424
3440
3438
3422
454325430543644344432443
3445 3449 34513443x-228
3439 3453
346134633459
34553457
3400x-2293402
x-224
x-226
x-230x-231
3542
wc-242
wc-243
wc-244 wc-246
sh
wc-248
wc-245
FHC
wc-247
pipes
ACT @ 2.7m
SH
FHC
x-206
x-205
3100CONFERENCE
ROOM
3101CRITICAL
3102OFFICE
3103OFFICE
3100NOURISHMENT
3105ENVIRONMENTAL
SERVICES
3106STAFFLOUNGE
3107SOILEDUTILITY
3108PATIENTROOM
3108PATIENTROOM
3112PATIENTROOM
3115PATIENTROOM
3117PATIENTROOM
3119PATIENTROOM
3121PATIENTROOM
3123PATIENT
3125PATIENTROOM
3131PATIENTROOM
3133PATIENTROOM
3134SHOWERROOM
3135PATIENTROOM
3138PATIENTROOM3141
SHOWERROOM
3142CLEANUTILITY
3143PATIENTROOM
3145PATIENTROOM
3147PATIENTROOM
3149PATIENTROOM
3160MEDICATION
ROOM
3158PATIENTROOM
3156PATIENTROOM
3154PATIENTROOM
3152PATIENTROOM
3151PATIENT &FAMILY
3162PATIENTROOM
3165PATIENTROOM
3169
ROOM
3170OFFICE
3171PATIENTROOM
3173PATIENTROOM
3179PATIENTROOM
3181PATIENTROOM
3183PATIENTROOM
3185PATIENTROOM
3189PATIENTROOM
3192PATIENTROOM
3195PATIENTROOM
3108a
3112a
3115a
a3213a1213a9113a7113
3125a3131a
3135a
3138a
3143a
3145a
3147a
3149a
3156a
3154a
3152a
3158a
3200OR
BOOKING
3206OFFICE
3207SOILEDHOLDING
3208PATIENTROOM
3205ENVIRO.SERVICES
3205NOURISHMENT
CENTRE
3201WAITINGAREA
3213CRITICALCARE
3213a
3213b
3217PATIENTROOM
3217a
3219PATIENTROOM
3219a
3221PATIENTROOM
3221a
3223PATIENTROOM
3223a
3235PATIENTROOM
3235a
3238PATIENTROOM
3238a
3242PATIENTROOM
3243PATIENTROOM
3245PATIENTROOM
3247PATIENTROOM
3249PATIENTROOM
3242PATIENTROOM
3258PATIENTROOM
3256PATIENTROOM
3254PATIENTROOM
3252aPATIENTROOM
3243a
3245a
3247a
3249a
3258a
3256a
3254a
3252a
3261STAFF
3262PATIENTROOM
3265PATIENTROOM
3270JIT
SUPPLES
3271PATIENTROOM
3273PATIENTROOM
3279PATIENTROOM
3281PATIENTROOM
3283PATIENTROOM
3285PATIENTROOM
3262a
3262a
326932713273
a5823a5823a3823a1823a9723
3289a
3289PATIENTROOM
3292PATIENTROOM
3292a
3294a
3295a
3294aPATIENT ROOM
3234
3225SATELLITE
CARDIAC CARE UNIT
3225a 3225b
X-231O.R.
RECEPTION
###OFFICE
3328
3345
3347
3330
3340
3338
33363334
3332
3331
3331a
3329
3325
3323
3323a 3321 3416FEMALELOCKERS
3412O.R.
RECEPTION
3412PACU
3436SOILEDUTILITY
3438NURSING STATION
(RECOVERY)
3440OFFICE
M NLK
333733353333
3326
3442REC. ISO.ROOM
3444STORAGE
3446STAFFLOUNGE
3448CLEANSUPPLY
3450ANAE.
WORK ROOM
3452EQUIP.STORAGE
3454DEPT. OF
ANAESTHESIA
3451OPERATING ROOM
#05
3449OPERATING ROOM
#04
3449OPERATING ROOM
#03
3447OPERATING ROOM
#2
3439OPERATING ROOM
#11
3453MAIN
CLEAN SUPPLY
3463OPERATING ROOM
#09
3463OPERATING ROOM
#08
3457OPERATING ROOM
#07
3455OPERATING ROOM
#06
###STERIL.RM.
3459INSTRU.CLEAN
3410SURGICAL
CARE CENTRE
3962OPERATING ROOM
#01
3406CARTROOM
3402ENDO MECH.
ROOM
3402EVS
3402ENDO MECH.
ROOM
CARTROOM
X-229STORAGE
3301OFFICE
3302LOCKERROOM
3303LOCKERROOM
3304W/R
3305ENV.SER.
3316O.R.
STORAGE
X-242
X-119
3310IP
LEARNING LAB
3308IP
LEARNING LAB
3306IP
LEARNING LAB
3320OFFICE
3547CONFERENCE
ROOM
3544SOILEDUTILITY
X-224
3539NOURISHMENT
ROOM
X-117CLEANSUPPLY
###ENV.SER.
3541W/R
3546CLEANSUPPLY
3542ELEC.
CLOSET #09
###ANTEROOM
3518OFFICE
3514SOILEDUTILITY
3515CLEANSUPPLY
X-217STAFFLOUNGE
X-118CLEANSUPPLY
X-212ANTEROOM
3513STAFF
3512ENV.SER.
3540CRITICAL CARE
B
3520CRITICAL CARE
A
1
2
3
13
14
15
16
3570W/R
3572PHYSICIAN
W/R
3573CLOSET #06
W/R
3581TREATMENTROOM
3582INTERVIEWROOM #01
3583INTERVIEWROOM #02
3584W/R
3585INTERVIEWROOM #03
3586INTERVIEWROOM #04
3587W/R
3587RECOVERY
20272018
20092000
2036
2009.8
993.7 1000.0 1010.0
166.34
174.34
178.1
FHC
SPRINK.
FHC
FHC
FHC
FHC
MED GAS
FHC
FHC
DAY SURGERY A
PACU H
BIRTHING SUITE
CCB CCA
PACU SURGICAL SUITES
67
101112
2
3
1
8
6 488
#18#17
#21
EXISTING PENTHOUS
EXISTING ROOF
EXISTING ELEC.RM. EXISTING
MECHANICALRM.
EXISTINGMECHANICAL
RM.
EXISTING ROOF
9101112
9101112
9101112
9101112
2
3
1
6 7
9 10
5
11 128
EXPANSION JOINT
EXISTING COURTYARDBELOW
#1
#3
#4
#5
#6
#7
3B CARDIO/MED3C
ACT
ACT
ACT
GYP CEILING, TERRAZZO FLOOR
ACT
ACT
ACT
ACT
ACTACT
ACT
ACT
ACT
ACT
ACT
GYP CEILING, TERRAZZO FLOOR
ACT
GYP
ACT
ACTACTACTACT
ACT
ACT
ACT
MTL PANEL
ACT
ACT
GYP
ACT
ACT
ACT
ACT ACT
ACT
ACT ACTACT ACT
ACT
ACT
ACT
ALUM CEILING
ACT
MTL PANEL
ALUM CEILING
ACTACT
ACTACT
ACTACT
ACTACT
ACTACT ACT
ACT
ACTACT
ACTACT
ACT ACT
ACTACT
Handwash
Handwash
DN
SS COUNTER SS COUNTER
skylight above
OR10
XXX
TWO-BED
1 0023
THREE-BED
1 0043
1 0053
1 0033
TWO
1 03
ONE-BED
1 1013
1 1023
1 1043
ONE-BEDBARRIER-FREE
1 1033
SOILEDWASH-UP/ UTILITY
1 2163
CLEANROOM
1 2173
CLEANROOM
1 2183 CYSTOSCOPY
1 2203
URODYNAMICS
1 2213
OPERATINGROOM A1
1 2223
OPERATINGROOM A2
1 2233
SCRUBAREA
1 2243
CORRIDOR
1 2253
CORRIDOR
1 2263
CLEAN UTILITYROOM
1 2193
CHANG
1
CHANGE
1 23
STORAGE RM
1 2043
W/C
1 2063
SOILEDHSE-KEE
1 2293
TRIAGE AND ASSESSMENTRECEPTION
2 0013
LBR/LBRP BEREAVEMENT C
2 0303
LBR/LBRP A
2 0123
LBR/LBRP A
2 0143
LBR/LBRP B
2 0163
LBR/LBRP A
2 0183
LBR/LBRP B
2 0203
LBR/LBRP A
2 0223
LBR
2
2 0153
2 0173
2 0193
2 0213
2 0233
2 0253
RECOVERYROOM
2 0513
OFFICE
2 0733
WR
2 0523
HK
2 0783
FEMALE CHANGE RM
2 0793
WR
2 0803
CLEANSUPPLY
2 0593
SOILED HOLDING
2 0603
OFFICE
2 0623
MONITORING ARCHIVE
2 0773
COMMUNICATIONCENTER
2 0653
WARMINGALCOVE
2 0683
STRTCHR AL
2 0583
REPORT/CONF
2 0723
CRCALC
23
SCRUB
2 0473
ALCOVE
2 0713
VISITOR WR B.F.
2 0743
FAMILY / PRE-OPWAITING
2 0763
EARLY LABOURFAMILY LOUNGE
2 0113
OFFICEON-CALL
2 0753
DISMANTLE& ASSEMBLY
2 1753
MOTHER RESIDNCE
2 1863
WR
2 1903
WR
2 1913
OR SUITE
2 3013
SHIELDED ORHDR
2 3143
CONTROL ROOM
2 3023
PLAN.WKRM
2 3033
CLEAN UTILITY
SOILED UTILITY
2 3063
EQUIP STORE
2 3073 RECOVERY BAYS
2 3083
PRE-OPHOLDING
2 3103
COUNSEL
2 3123 UNASS.
2 3133
CHNGE RM
2 3113
NRSHMNTCENTER
2 0643
SOILED
2 1713
RESPIRATORYTHERAPY
2 1763
MOTHER RESIDNCE
2 1873
MOTHERRESIDNCE
2 1893
MOTHER RESIDNCE
2 1883
CORRIDOR
2 0873
CORRIDOR
2 0843
CORRIDOR
2 0833
2 3093
2 3153
2 0533
2 0543
2 0553
2 0563
CORRIDOR
2 0883
CORRIDOR
2 0903
CORRIDOR
2 0823
TRIAGECHAIRS
2 0043
SCRUB AREA
2 3183
2 3203
LOCKERS
2 3213
EQUIPMENTSTORAGE
2 0633
NURSEPORTER
2 3223CRASH CART
2 3233
IMAV
23
NURSESTATION
2 0573
MED AREA
2 0023
TRIAGEWKSTN
2 0033
TRIAGECHAIRS
2 0053
TRIAGECHAIRS
2 0063
ELECTRICAL
2 0913
LAN
2 0923
CORRIDOR
2 0893
CORRIDOR
2 1963
CORRIDOR
2 1943
CORRIDOR
2 1953
CORRIDO
2 1973
KITCHEN
2 1853
H.K.
2 1183
WR
2 0813
EDUCATOROFFICE
2 2043
STRETCHER
2 0073STRETCHER
2 0083STRETCHER
2 0093
CARE BY PARENT
2 1793
CARE BYPARENT
2 1803
WR
2 1823
WR
2 1813
CLEAN UT
2 1703
WR
2 0103
PARENT AREA
2 1833
WRB-F
2 1843
CORRIDOR
2 1933
2 0313
2 0133
STAFFWC
2 0963
MONITORING ARCHIVE
2 0773
CONFERENCE
2 1663
PHYSICIANAREA
2 1033
STORE BASSINET
2 1723
2 1283
2 12332 1243
CORRIDOR
2 1983
LAN
2 2013ELEC
2 2023
WR
2 1783
HANDWASH
2 1253
WKSTN
2 1263
MONITORING ARCHIVE
2 0773
OFFICENURSE EDUCATOR
2 2003
ISOLATION
2 1653
2 1133
ANTE ROOM
2 1143
WAITING
2 1733
VISIW
2 13
HANDWASH
2 1963
C-SECTION OR
2 0433
ANAESTHETIC SUPPORT RM
2 0463
CLEANSUPPLY
2 0943
C-SECTION OR
2 0443
SCRUBAREA
2 0933
HOUSEKEEPING
2 0953
SCRUB
2 3243
VEST
2 0023
WC
3546
EL-2-A
EL-2-B
ST-2-B
DN
DN
DN
DN
DN
DN
DN
DN DN
DN
N
ABC
KEY PLAN
FG
H
Checked by:Project No.:
Drawing Title:
© Cannon Design 2013
© C
anno
n D
esig
n 20
13A
ll rig
hts
rese
rved
. No
part
of th
is d
ocum
ent m
aybe
repr
oduc
ed o
r util
ized
in a
ny fo
rm, w
ithou
t prio
rw
ritte
n au
thor
izat
ion
by T
he C
anno
n C
orpo
ratio
n.
No. STAGE 3.2 COSTING SUBMISSION 06-28-2013
MMM Group LimitedMechanical and Electrical Engineering
100 Commerce Valley Drive W.Thornhill , ON L3T 0A1
905.882.1100
Halsall Associates Ltd.Structural Engineering
2300 Yonge Street, Suite 2300Toronto, Ontario M4P 1E4
416.487.5256
200 University Avenue, Suite 1200Toronto, Ontario M5H 3C6
T: 416.915.0121F: 416.915.0122
2200 Eglinton Ave WestMISSISSAUGA , ONTARIO
Drawings are not to be scaled.
Contractor must verify all dimensions on the job andreport any discrepancy to architects before proceedingwith the work
All drawings and specifications are the property of thearchitect and must be returned at the completion of thework
This drawing is not to be used for construction untilcountersigned.
Signature: Date:
Trillium Health Partners
020629.00 R.S.
Credit Valley HospitalPriority Areas
Redevelopment Project(Phase 3)
05/0
8/20
13 8
:55:
54
3.2.1.9.03.7
PHASING PLAN - LEVEL 3
2 DD Ministry Submission 3.2 forCosting Review
28.06.20133 DD Ministry Submission 3.2 09.08.2013
NOTES:
- ALL AREAS OUTSIDE AREA OF CONSTRUCTION TO BE MAINTAINED FULLY OPERATIONAL
- EXISTING AREAS SHOWN IN BLACK & WHITE
-COMPLETED & OCCUPIED NEW CONSTRUCTION SHOWN WITH COLOUR
-REFERENCE WORK SEQUENCING DIAGRAMS
AREA OF CONSTRUCTION
MAINTAIN ACCESS THROUGH CONSTRUCTION
L3-XX
STAGE 7
L3-8
x-122
x-123
3242
3249
3247
3245
3243wc115
wc116
wc117
wc118wc119
wc120
wc121
wc122
3252
3254
3256
3258
wc112 wc111
3225
wc110wc109wc108
x-121
322332213219
wc107
3217
wc113
3235
3238
wc114
3261
wc106
wc105
3262
3265
wc104wc103
3271
3273
3270
wc102
3279 3281
wc101 wc100
3283 3285
wc99
wc97
wc96
wc98
3289
3292
wc95
3212
3234
3201
3205
3204
wc86
3208
3200
3207
3206
3295wc85
3294
3269
3260
3179 3181 3183 3185
3173
wc241 wc240 wc239 wc238 3187
wc212 wc213
3170
3169
3189
3192
wc236
wc237
3165
wc214
wc215
3162
3171
3194
wc2353195
3105
3104
3103
3102
3101 3100
3106
3107
3108wc234
3115
3117 3119 3121 3123
31313133
3134
wc225
3135
3138
wc224
3141
3142
3143wc223
3145wc222
wc2213147
3149wc220
3152wc219
3154wc218
3156
3158wc216
wc217
3160
31513251
3125
R25
RJ
RH
RG
RF
RE
F
L
K
N1x N1 N2 N3
NFx
NG
NH
NJ
NK
NL
NLx
H
N25
9y 10 11 12 13 14 15 16 17 18 19 20
21
23 24 25 26 27
Ax
A
Dx
Ex
G
N25
25x
Fx
N25
AC
AB
AD
AE
D
E
N4 N4x
NT
NU
N5 N5x
N5y
N6 N7 N8
NS
NR
NQ
NP
NN
NM
NS
NR
NQ
NP
NN
NM
N17N17x
N17y
N18N19 N20
NT
NU
N9 N10 N11 N12N13 N14 N15 N16N16x
NF
N8NE
ND
NC
NB
NA
H
NF
NE
ND
NC
NB
NA
H
N20xN21N22 N23 N24N24N24
NG
NK
x-90
x-89
3302
3301
x-119
x-116
x-117
3403
3514
x-118
3448
3320
3310
3308
3306
33053304
x-242
3316
3321
3416
3570
3572
3573
Closet 6
35843585
3586358335823581
3576 3577
3587
x-225
3410 3408 34063401
3412
x-223
x-222
x-221 x-220 x-218x-219
3546
3547
3544
3542
3540
3537
3538
3539
3531
3518
3515
x-217
3513
3520
x-208 x-209 x-210 x-211 x-213
x-214
x-215
x-216
x-212
3324
3342
3326
3323
3321
3325 3341
33303338
3340
3345
3341
3339
3337
3336
33353333
3331
3329
3349
3334
3332
x-227
3424
3440
3438
3422
454325430543644344432443
3445 3449 34513443x-228
3439 3453
346134633459
34553457
3400x-2293402
x-224
x-226
x-230x-231
3542
wc-242
wc-243
wc-244 wc-246
sh
wc-248
wc-245
FHC
wc-247
pipes
ACT @ 2.7m
SH
FHC
x-206
x-205
3100CONFERENCE
ROOM
3101CRITICAL
3102OFFICE
3103OFFICE
3100NOURISHMENT
3105ENVIRONMENTAL
SERVICES
3106STAFFLOUNGE
3107SOILEDUTILITY
3108PATIENTROOM
3108PATIENTROOM
3112PATIENTROOM
3115PATIENTROOM
3117PATIENTROOM
3119PATIENTROOM
3121PATIENTROOM
3123PATIENT
3125PATIENTROOM
3131PATIENTROOM
3133PATIENTROOM
3134SHOWERROOM
3135PATIENTROOM
3138PATIENTROOM3141
SHOWERROOM
3142CLEANUTILITY
3143PATIENTROOM
3145PATIENTROOM
3147PATIENTROOM
3149PATIENTROOM
3160MEDICATION
ROOM
3158PATIENTROOM
3156PATIENTROOM
3154PATIENTROOM
3152PATIENTROOM
3151PATIENT &FAMILY
3162PATIENTROOM
3165PATIENTROOM
3169
ROOM
3170OFFICE
3171PATIENTROOM
3173PATIENTROOM
3179PATIENTROOM
3181PATIENTROOM
3183PATIENTROOM
3185PATIENTROOM
3189PATIENTROOM
3192PATIENTROOM
3195PATIENTROOM
3108a
3112a
3115a
a3213a1213a9113a7113
3125a3131a
3135a
3138a
3143a
3145a
3147a
3149a
3156a
3154a
3152a
3158a
3200OR
BOOKING
3206OFFICE
3207SOILEDHOLDING
3208PATIENTROOM
3205ENVIRO.SERVICES
3205NOURISHMENT
CENTRE
3201WAITINGAREA
3213CRITICALCARE
3213a
3213b
3217PATIENTROOM
3217a
3219PATIENTROOM
3219a
3221PATIENTROOM
3221a
3223PATIENTROOM
3223a
3235PATIENTROOM
3235a
3238PATIENTROOM
3238a
3242PATIENTROOM
3243PATIENTROOM
3245PATIENTROOM
3247PATIENTROOM
3249PATIENTROOM
3242PATIENTROOM
3258PATIENTROOM
3256PATIENTROOM
3254PATIENTROOM
3252aPATIENTROOM
3243a
3245a
3247a
3249a
3258a
3256a
3254a
3252a
3261STAFF
3262PATIENTROOM
3265PATIENTROOM
3270JIT
SUPPLES
3271PATIENTROOM
3273PATIENTROOM
3279PATIENTROOM
3281PATIENTROOM
3283PATIENTROOM
3285PATIENTROOM
3262a
3262a
326932713273
a5823a5823a3823a1823a9723
3289a
3289PATIENTROOM
3292PATIENTROOM
3292a
3294a
3295a
3294aPATIENT ROOM
3234
3225SATELLITE
CARDIAC CARE UNIT
3225a 3225b
X-231O.R.
RECEPTION
###OFFICE
3328
3345
3347
3330
3340
3338
33363334
3332
3331
3331a
3329
3325
3323
3323a 3321 3416FEMALELOCKERS
3412O.R.
RECEPTION
3412PACU
3436SOILEDUTILITY
3438NURSING STATION
(RECOVERY)
3440OFFICE
M NLK
333733353333
3326
3442REC. ISO.ROOM
3444STORAGE
3446STAFFLOUNGE
3448CLEANSUPPLY
3450ANAE.
WORK ROOM
3452EQUIP.STORAGE
3454DEPT. OF
ANAESTHESIA
3451OPERATING ROOM
#05
3449OPERATING ROOM
#04
3449OPERATING ROOM
#03
3447OPERATING ROOM
#2
3439OPERATING ROOM
#11
3453MAIN
CLEAN SUPPLY
3463OPERATING ROOM
#09
3463OPERATING ROOM
#08
3457OPERATING ROOM
#07
3455OPERATING ROOM
#06
###STERIL.RM.
3459INSTRU.CLEAN
3410SURGICAL
CARE CENTRE
3962OPERATING ROOM
#01
3406CARTROOM
3402ENDO MECH.
ROOM
3402EVS
3402ENDO MECH.
ROOM
CARTROOM
X-229STORAGE
3301OFFICE
3302LOCKERROOM
3303LOCKERROOM
3304W/R
3305ENV.SER.
3316O.R.
STORAGE
X-242
X-119
3310IP
LEARNING LAB
3308IP
LEARNING LAB
3306IP
LEARNING LAB
3320OFFICE
3547CONFERENCE
ROOM
3544SOILEDUTILITY
X-224
3539NOURISHMENT
ROOM
X-117CLEANSUPPLY
###ENV.SER.
3541W/R
3546CLEANSUPPLY
3542ELEC.
CLOSET #09
###ANTEROOM
3518OFFICE
3514SOILEDUTILITY
3515CLEANSUPPLY
X-217STAFFLOUNGE
X-118CLEANSUPPLY
X-212ANTEROOM
3513STAFF
3512ENV.SER.
3540CRITICAL CARE
B
3520CRITICAL CARE
A
1
2
3
13
14
15
16
3570W/R
3572PHYSICIAN
W/R
3573CLOSET #06
W/R
3581TREATMENTROOM
3582INTERVIEWROOM #01
3583INTERVIEWROOM #02
3584W/R
3585INTERVIEWROOM #03
3586INTERVIEWROOM #04
3587W/R
3587RECOVERY
20272018
20092000
2036
2009.8
993.7 1000.0 1010.0
166.34
174.34
178.1
FHC
SPRINK.
FHC
FHC
FHC
FHC
MED GAS
FHC
FHC
DAY SURGERY A
PACU H
BIRTHING SUITE
CCB CCA
PACU SURGICAL SUITES
67
101112
2
3
1
8
6 488
#18#17
#21
EXISTING PENTHOUS
EXISTING ROOF
EXISTING ELEC.RM. EXISTING
MECHANICALRM.
EXISTINGMECHANICAL
RM.
EXISTING ROOF
9101112
9101112
9101112
9101112
2
3
1
6 7
9 10
5
11 128
EXPANSION JOINT
EXISTING COURTYARDBELOW
#1
#3
#4
#5
#6
#7
3B CARDIO/MED3C
ACT
ACT
ACT
GYP CEILING, TERRAZZO FLOOR
ACT
ACT
ACT
ACT
ACTACT
ACT
ACT
ACT
ACT
ACT
GYP CEILING, TERRAZZO FLOOR
ACT
GYP
ACT
ACTACTACTACT
ACT
ACT
ACT
MTL PANEL
ACT
ACT
GYP
ACT
ACT
ACT
ACT ACT
ACT
ACT ACTACT ACT
ACT
ACT
ACT
ALUM CEILING
ACT
MTL PANEL
ALUM CEILING
ACTACT
ACTACT
ACTACT
ACTACT
ACTACT ACT
ACT
ACTACT
ACTACT
ACT ACT
ACTACT
Handwash
Handwash
DN
SS COUNTER SS COUNTER
skylight above
OR10
XXX
TWO-BED
1 0023
THREE-BED
1 0043
1 0053
1 0033
TWO
1 03
ONE-BED
1 1013
1 1023
1 1043
ONE-BEDBARRIER-FREE
1 1033
SOILEDWASH-UP/ UTILITY
1 2163
CLEANROOM
1 2173
CLEANROOM
1 2183 CYSTOSCOPY
1 2203
URODYNAMICS
1 2213
OPERATINGROOM A1
1 2223
OPERATINGROOM A2
1 2233
SCRUBAREA
1 2243
CORRIDOR
1 2253
CORRIDOR
1 2263
CLEAN UTILITYROOM
1 2193
CHANG
1
CHANGE
1 23
STORAGE RM
1 2043
W/C
1 2063
SOILEDHSE-KEE
1 2293
TRIAGE AND ASSESSMENTRECEPTION
2 0013
LBR/LBRP BEREAVEMENT C
2 0303
LBR/LBRP A
2 0123
LBR/LBRP A
2 0143
LBR/LBRP B
2 0163
LBR/LBRP A
2 0183
LBR/LBRP B
2 0203
LBR/LBRP A
2 0223
LBR
2
2 0153
2 0173
2 0193
2 0213
2 0233
2 0253
RECOVERYROOM
2 0513
OFFICE
2 0733
WR
2 0523
HK
2 0783
FEMALE CHANGE RM
2 0793
WR
2 0803
CLEANSUPPLY
2 0593
SOILED HOLDING
2 0603
OFFICE
2 0623
MONITORING ARCHIVE
2 0773
COMMUNICATIONCENTER
2 0653
WARMINGALCOVE
2 0683
STRTCHR AL
2 0583
REPORT/CONF
2 0723
CRCALC
23
SCRUB
2 0473
ALCOVE
2 0713
VISITOR WR B.F.
2 0743
FAMILY / PRE-OPWAITING
2 0763
EARLY LABOURFAMILY LOUNGE
2 0113
OFFICEON-CALL
2 0753
DISMANTLE& ASSEMBLY
2 1753
MOTHER RESIDNCE
2 1863
WR
2 1903
WR
2 1913
OR SUITE
2 3013
SHIELDED ORHDR
2 3143
CONTROL ROOM
2 3023
PLAN.WKRM
2 3033
CLEAN UTILITY
SOILED UTILITY
2 3063
EQUIP STORE
2 3073 RECOVERY BAYS
2 3083
PRE-OPHOLDING
2 3103
COUNSEL
2 3123 UNASS.
2 3133
CHNGE RM
2 3113
NRSHMNTCENTER
2 0643
SOILED
2 1713
RESPIRATORYTHERAPY
2 1763
MOTHER RESIDNCE
2 1873
MOTHERRESIDNCE
2 1893
MOTHER RESIDNCE
2 1883
CORRIDOR
2 0873
CORRIDOR
2 0843
CORRIDOR
2 0833
2 3093
2 3153
2 0533
2 0543
2 0553
2 0563
CORRIDOR
2 0883
CORRIDOR
2 0903
CORRIDOR
2 0823
TRIAGECHAIRS
2 0043
SCRUB AREA
2 3183
2 3203
LOCKERS
2 3213
EQUIPMENTSTORAGE
2 0633
NURSEPORTER
2 3223CRASH CART
2 3233
IMAV
23
NURSESTATION
2 0573
MED AREA
2 0023
TRIAGEWKSTN
2 0033
TRIAGECHAIRS
2 0053
TRIAGECHAIRS
2 0063
ELECTRICAL
2 0913
LAN
2 0923
CORRIDOR
2 0893
CORRIDOR
2 1963
CORRIDOR
2 1943
CORRIDOR
2 1953
CORRIDO
2 1973
KITCHEN
2 1853
H.K.
2 1183
WR
2 0813
EDUCATOROFFICE
2 2043
STRETCHER
2 0073STRETCHER
2 0083STRETCHER
2 0093
CARE BY PARENT
2 1793
CARE BYPARENT
2 1803
WR
2 1823
WR
2 1813
CLEAN UT
2 1703
WR
2 0103
PARENT AREA
2 1833
WRB-F
2 1843
CORRIDOR
2 1933
2 0313
2 0133
STAFFWC
2 0963
MONITORING ARCHIVE
2 0773
CONFERENCE
2 1663
PHYSICIANAREA
2 1033
STORE BASSINET
2 1723
2 1283
2 12332 1243
CORRIDOR
2 1983
LAN
2 2013ELEC
2 2023
WR
2 1783
HANDWASH
2 1253
WKSTN
2 1263
MONITORING ARCHIVE
2 0773
OFFICENURSE EDUCATOR
2 2003
ISOLATION
2 1653
2 1133
ANTE ROOM
2 1143
WAITING
2 1733
VISIW
2 13
HANDWASH
2 1963
C-SECTION OR
2 0433
ANAESTHETIC SUPPORT RM
2 0463
CLEANSUPPLY
2 0943
C-SECTION OR
2 0443
SCRUBAREA
2 0933
HOUSEKEEPING
2 0953
SCRUB
2 3243
VEST
2 0023
WC
3546
EL-2-A
EL-2-B
ST-2-B
DN
DN
DN
DN
DN
DN
DN
DN DN
DN
N
ABC
KEY PLAN
FG
H
Checked by:Project No.:
Drawing Title:
© Cannon Design 2013
© C
anno
n D
esig
n 20
13A
ll rig
hts
rese
rved
. No
part
of th
is d
ocum
ent m
aybe
repr
oduc
ed o
r util
ized
in a
ny fo
rm, w
ithou
t prio
rw
ritte
n au
thor
izat
ion
by T
he C
anno
n C
orpo
ratio
n.
No. STAGE 3.2 COSTING SUBMISSION 06-28-2013
MMM Group LimitedMechanical and Electrical Engineering
100 Commerce Valley Drive W.Thornhill , ON L3T 0A1
905.882.1100
Halsall Associates Ltd.Structural Engineering
2300 Yonge Street, Suite 2300Toronto, Ontario M4P 1E4
416.487.5256
200 University Avenue, Suite 1200Toronto, Ontario M5H 3C6
T: 416.915.0121F: 416.915.0122
2200 Eglinton Ave WestMISSISSAUGA , ONTARIO
Drawings are not to be scaled.
Contractor must verify all dimensions on the job andreport any discrepancy to architects before proceedingwith the work
All drawings and specifications are the property of thearchitect and must be returned at the completion of thework
This drawing is not to be used for construction untilcountersigned.
Signature: Date:
Trillium Health Partners
020629.00 R.S.
Credit Valley HospitalPriority Areas
Redevelopment Project(Phase 3)
05/0
8/20
13 8
:55:
54
3.2.1.9.03.1
PHASING PLAN - LEVEL 3
2 DD Ministry Submission 3.2 forCosting Review
28.06.20133 DD Ministry Submission 3.2 09.08.2013
NOTES:
- ALL AREAS OUTSIDE AREA OF CONSTRUCTION TO BE MAINTAINED FULLY OPERATIONAL
- EXISTING AREAS SHOWN IN BLACK & WHITE
-COMPLETED & OCCUPIED NEW CONSTRUCTION SHOWN WITH COLOUR
-REFERENCE WORK SEQUENCING DIAGRAMS
AREA OF CONSTRUCTION
MAINTAIN ACCESS THROUGH CONSTRUCTION
L3-XX
2
STAGE 2
L2-5
L3-3
TEMP.CRITICAL CARE
TEMP.BEDROOMS
x-122
x-123
3242
3249
3247
3245
3243wc115
wc116
wc117
wc118wc119
wc120
wc121
wc122
3252
3254
3256
3258
wc112 wc111
3225
wc110wc109wc108
x-121
322332213219
wc107
3217
wc113
3235
3238
wc114
3261
wc106
wc105
3262
3265
wc104wc103
3271
3273
3270
wc102
3279 3281
wc101 wc100
3283 3285
wc99
wc97
wc96
wc98
3289
3292
wc95
3212
3234
3201
3205
3204
wc86
3208
3200
3207
3206
3295wc85
3294
3269
3260
3179 3181 3183 3185
3173
wc241 wc240 wc239 wc238 3187
wc212 wc213
3170
3169
3189
3192
wc236
wc237
3165
wc214
wc215
3162
3171
3194
wc2353195
3105
3104
3103
3102
3101 3100
3106
3107
3108wc234
3115
3117 3119 3121 3123
31313133
3134
wc225
3135
3138
wc224
3141
3142
3143wc223
3145wc222
wc2213147
3149wc220
3152wc219
3154wc218
3156
3158wc216
wc217
3160
31513251
3125
R25
RJ
RH
RG
RF
RE
F
L
K
N1x N1 N2 N3
NFx
NG
NH
NJ
NK
NL
NLx
H
N25
9y 10 11 12 13 14 15 16 17 18 19 20
21
23 24 25 26 27
Ax
A
Dx
Ex
G
N25
25x
Fx
N25
AC
AB
AD
AE
D
E
N4 N4x
NT
NU
N5 N5x
N5y
N6 N7 N8
NS
NR
NQ
NP
NN
NM
NS
NR
NQ
NP
NN
NM
N17N17x
N17y
N18N19 N20
NT
NU
N9 N10 N11 N12N13 N14 N15 N16N16x
NF
N8NE
ND
NC
NB
NA
H
NF
NE
ND
NC
NB
NA
H
N20xN21N22 N23 N24N24N24
NG
NK
x-90
x-89
3302
3301
x-119
x-116
x-117
3403
3514
x-118
3448
3320
3310
3308
3306
33053304
x-242
3316
3321
3416
3570
3572
3573
Closet 6
35843585
3586358335823581
3576 3577
3587
x-225
3410 3408 34063401
3412
x-223
x-222
x-221 x-220 x-218x-219
3546
3547
3544
3542
3540
3537
3538
3539
3531
3518
3515
x-217
3513
3520
x-208 x-209 x-210 x-211 x-213
x-214
x-215
x-216
x-212
3324
3342
3326
3323
3321
3325 3341
33303338
3340
3345
3341
3339
3337
3336
33353333
3331
3329
3349
3334
3332
x-227
3424
3440
3438
3422
454325430543644344432443
3445 3449 34513443x-228
3439 3453
346134633459
34553457
3400x-2293402
x-224
x-226
x-230x-231
3542
wc-242
wc-243
wc-244 wc-246
sh
wc-248
wc-245
FHC
wc-247
pipes
ACT @ 2.7m
SH
FHC
x-206
x-205
3100CONFERENCE
ROOM
3101CRITICAL
3102OFFICE
3103OFFICE
3100NOURISHMENT
3105ENVIRONMENTAL
SERVICES
3106STAFFLOUNGE
3107SOILEDUTILITY
3108PATIENTROOM
3108PATIENTROOM
3112PATIENTROOM
3115PATIENTROOM
3117PATIENTROOM
3119PATIENTROOM
3121PATIENTROOM
3123PATIENT
3125PATIENTROOM
3131PATIENTROOM
3133PATIENTROOM
3134SHOWERROOM
3135PATIENTROOM
3138PATIENTROOM3141
SHOWERROOM
3142CLEANUTILITY
3143PATIENTROOM
3145PATIENTROOM
3147PATIENTROOM
3149PATIENTROOM
3160MEDICATION
ROOM
3158PATIENTROOM
3156PATIENTROOM
3154PATIENTROOM
3152PATIENTROOM
3151PATIENT &FAMILY
3162PATIENTROOM
3165PATIENTROOM
3169
ROOM
3170OFFICE
3171PATIENTROOM
3173PATIENTROOM
3179PATIENTROOM
3181PATIENTROOM
3183PATIENTROOM
3185PATIENTROOM
3189PATIENTROOM
3192PATIENTROOM
3195PATIENTROOM
3108a
3112a
3115a
a3213a1213a9113a7113
3125a3131a
3135a
3138a
3143a
3145a
3147a
3149a
3156a
3154a
3152a
3158a
3200OR
BOOKING
3206OFFICE
3207SOILEDHOLDING
3208PATIENTROOM
3205ENVIRO.SERVICES
3205NOURISHMENT
CENTRE
3201WAITINGAREA
3213CRITICALCARE
3213a
3213b
3217PATIENTROOM
3217a
3219PATIENTROOM
3219a
3221PATIENTROOM
3221a
3223PATIENTROOM
3223a
3235PATIENTROOM
3235a
3238PATIENTROOM
3238a
3242PATIENTROOM
3243PATIENTROOM
3245PATIENTROOM
3247PATIENTROOM
3249PATIENTROOM
3242PATIENTROOM
3258PATIENTROOM
3256PATIENTROOM
3254PATIENTROOM
3252aPATIENTROOM
3243a
3245a
3247a
3249a
3258a
3256a
3254a
3252a
3261STAFF
3262PATIENTROOM
3265PATIENTROOM
3270JIT
SUPPLES
3271PATIENTROOM
3273PATIENTROOM
3279PATIENTROOM
3281PATIENTROOM
3283PATIENTROOM
3285PATIENTROOM
3262a
3262a
326932713273
a5823a5823a3823a1823a9723
3289a
3289PATIENTROOM
3292PATIENTROOM
3292a
3294a
3295a
3294aPATIENT ROOM
3234
3225SATELLITE
CARDIAC CARE UNIT
3225a 3225b
X-231O.R.
RECEPTION
###OFFICE
3328
3345
3347
3330
3340
3338
33363334
3332
3331
3331a
3329
3325
3323
3323a 3321 3416FEMALELOCKERS
3412O.R.
RECEPTION
3412PACU
3436SOILEDUTILITY
3438NURSING STATION
(RECOVERY)
3440OFFICE
M NLK
333733353333
3326
3442REC. ISO.ROOM
3444STORAGE
3446STAFFLOUNGE
3448CLEANSUPPLY
3450ANAE.
WORK ROOM
3452EQUIP.STORAGE
3454DEPT. OF
ANAESTHESIA
3451OPERATING ROOM
#05
3449OPERATING ROOM
#04
3449OPERATING ROOM
#03
3447OPERATING ROOM
#2
3439OPERATING ROOM
#11
3453MAIN
CLEAN SUPPLY
3463OPERATING ROOM
#09
3463OPERATING ROOM
#08
3457OPERATING ROOM
#07
3455OPERATING ROOM
#06
###STERIL.RM.
3459INSTRU.CLEAN
3410SURGICAL
CARE CENTRE
3962OPERATING ROOM
#01
3406CARTROOM
3402ENDO MECH.
ROOM
3402EVS
3402ENDO MECH.
ROOM
CARTROOM
X-229STORAGE
3301OFFICE
3302LOCKERROOM
3303LOCKERROOM
3304W/R
3305ENV.SER.
3316O.R.
STORAGE
X-242
X-119
3310IP
LEARNING LAB
3308IP
LEARNING LAB
3306IP
LEARNING LAB
3320OFFICE
3547CONFERENCE
ROOM
3544SOILEDUTILITY
X-224
3539NOURISHMENT
ROOM
X-117CLEANSUPPLY
###ENV.SER.
3541W/R
3546CLEANSUPPLY
3542ELEC.
CLOSET #09
###ANTEROOM
3518OFFICE
3514SOILEDUTILITY
3515CLEANSUPPLY
X-217STAFFLOUNGE
X-118CLEANSUPPLY
X-212ANTEROOM
3513STAFF
3512ENV.SER.
3540CRITICAL CARE
B
3520CRITICAL CARE
A
1
2
3
13
14
15
16
3570W/R
3572PHYSICIAN
W/R
3573CLOSET #06
W/R
3581TREATMENTROOM
3582INTERVIEWROOM #01
3583INTERVIEWROOM #02
3584W/R
3585INTERVIEWROOM #03
3586INTERVIEWROOM #04
3587W/R
3587RECOVERY
20272018
20092000
2036
2009.8
993.7 1000.0 1010.0
166.34
174.34
178.1
FHC
SPRINK.
FHC
FHC
FHC
FHC
MED GAS
FHC
FHC
DAY SURGERY A
PACU H
BIRTHING SUITE
CCB CCA
PACU SURGICAL SUITES
67
101112
2
3
1
8
6 488
#18#17
#21
EXISTING PENTHOUS
EXISTING ROOF
EXISTING ELEC.RM. EXISTING
MECHANICALRM.
EXISTINGMECHANICAL
RM.
EXISTING ROOF
9101112
9101112
9101112
9101112
2
3
1
6 7
9 10
5
11 128
EXPANSION JOINT
EXISTING COURTYARDBELOW
#1
#3
#4
#5
#6
#7
3B CARDIO/MED3C
ACT
ACT
ACT
GYP CEILING, TERRAZZO FLOOR
ACT
ACT
ACT
ACT
ACTACT
ACT
ACT
ACT
ACT
ACT
GYP CEILING, TERRAZZO FLOOR
ACT
GYP
ACT
ACTACTACTACT
ACT
ACT
ACT
MTL PANEL
ACT
ACT
GYP
ACT
ACT
ACT
ACT ACT
ACT
ACT ACTACT ACT
ACT
ACT
ACT
ALUM CEILING
ACT
MTL PANEL
ALUM CEILING
ACTACT
ACTACT
ACTACT
ACTACT
ACTACT ACT
ACT
ACTACT
ACTACT
ACT ACT
ACTACT
Handwash
Handwash
DN
SS COUNTER SS COUNTER
skylight above
OR10
XXX
TWO-BED
1 0023
THREE-BED
1 0043
1 0053
1 0033
TWO
1 03
ONE-BED
1 1013
1 1023
1 1043
ONE-BEDBARRIER-FREE
1 1033
SOILEDWASH-UP/ UTILITY
1 2163
CLEANROOM
1 2173
CLEANROOM
1 2183 CYSTOSCOPY
1 2203
URODYNAMICS
1 2213
OPERATINGROOM A1
1 2223
OPERATINGROOM A2
1 2233
SCRUBAREA
1 2243
CORRIDOR
1 2253
CORRIDOR
1 2263
CLEAN UTILITYROOM
1 2193
CHANG
1
CHANGE
1 23
STORAGE RM
1 2043
W/C
1 2063
SOILEDHSE-KEE
1 2293
TRIAGE AND ASSESSMENTRECEPTION
2 0013
LBR/LBRP BEREAVEMENT C
2 0303
LBR/LBRP A
2 0123
LBR/LBRP A
2 0143
LBR/LBRP B
2 0163
LBR/LBRP A
2 0183
LBR/LBRP B
2 0203
LBR/LBRP A
2 0223
LBR
2
2 0153
2 0173
2 0193
2 0213
2 0233
2 0253
RECOVERYROOM
2 0513
OFFICE
2 0733
WR
2 0523
HK
2 0783
FEMALE CHANGE RM
2 0793
WR
2 0803
CLEANSUPPLY
2 0593
SOILED HOLDING
2 0603
OFFICE
2 0623
MONITORING ARCHIVE
2 0773
COMMUNICATIONCENTER
2 0653
WARMINGALCOVE
2 0683
STRTCHR AL
2 0583
REPORT/CONF
2 0723
CRCALC
23
SCRUB
2 0473
ALCOVE
2 0713
VISITOR WR B.F.
2 0743
FAMILY / PRE-OPWAITING
2 0763
EARLY LABOURFAMILY LOUNGE
2 0113
OFFICEON-CALL
2 0753
DISMANTLE& ASSEMBLY
2 1753
MOTHER RESIDNCE
2 1863
WR
2 1903
WR
2 1913
OR SUITE
2 3013
SHIELDED ORHDR
2 3143
CONTROL ROOM
2 3023
PLAN.WKRM
2 3033
CLEAN UTILITY
SOILED UTILITY
2 3063
EQUIP STORE
2 3073 RECOVERY BAYS
2 3083
PRE-OPHOLDING
2 3103
COUNSEL
2 3123 UNASS.
2 3133
CHNGE RM
2 3113
NRSHMNTCENTER
2 0643
SOILED
2 1713
RESPIRATORYTHERAPY
2 1763
MOTHER RESIDNCE
2 1873
MOTHERRESIDNCE
2 1893
MOTHER RESIDNCE
2 1883
CORRIDOR
2 0873
CORRIDOR
2 0843
CORRIDOR
2 0833
2 3093
2 3153
2 0533
2 0543
2 0553
2 0563
CORRIDOR
2 0883
CORRIDOR
2 0903
CORRIDOR
2 0823
TRIAGECHAIRS
2 0043
SCRUB AREA
2 3183
2 3203
LOCKERS
2 3213
EQUIPMENTSTORAGE
2 0633
NURSEPORTER
2 3223CRASH CART
2 3233
IMAV
23
NURSESTATION
2 0573
MED AREA
2 0023
TRIAGEWKSTN
2 0033
TRIAGECHAIRS
2 0053
TRIAGECHAIRS
2 0063
ELECTRICAL
2 0913
LAN
2 0923
CORRIDOR
2 0893
CORRIDOR
2 1963
CORRIDOR
2 1943
CORRIDOR
2 1953
CORRIDO
2 1973
KITCHEN
2 1853
H.K.
2 1183
WR
2 0813
EDUCATOROFFICE
2 2043
STRETCHER
2 0073STRETCHER
2 0083STRETCHER
2 0093
CARE BY PARENT
2 1793
CARE BYPARENT
2 1803
WR
2 1823
WR
2 1813
CLEAN UT
2 1703
WR
2 0103
PARENT AREA
2 1833
WRB-F
2 1843
CORRIDOR
2 1933
2 0313
2 0133
STAFFWC
2 0963
MONITORING ARCHIVE
2 0773
CONFERENCE
2 1663
PHYSICIANAREA
2 1033
STORE BASSINET
2 1723
2 1283
2 12332 1243
CORRIDOR
2 1983
LAN
2 2013ELEC
2 2023
WR
2 1783
HANDWASH
2 1253
WKSTN
2 1263
MONITORING ARCHIVE
2 0773
OFFICENURSE EDUCATOR
2 2003
ISOLATION
2 1653
2 1133
ANTE ROOM
2 1143
WAITING
2 1733
VISIW
2 13
HANDWASH
2 1963
C-SECTION OR
2 0433
ANAESTHETIC SUPPORT RM
2 0463
CLEANSUPPLY
2 0943
C-SECTION OR
2 0443
SCRUBAREA
2 0933
HOUSEKEEPING
2 0953
SCRUB
2 3243
VEST
2 0023
WC
3546
EL-2-A
EL-2-B
ST-2-B
DN
DN
DN
DN
DN
DN
DN
DN DN
DN
N
ABC
KEY PLAN
FG
H
Checked by:Project No.:
Drawing Title:
© Cannon Design 2013
© C
anno
n D
esig
n 20
13A
ll rig
hts
rese
rved
. No
part
of th
is d
ocum
ent m
aybe
repr
oduc
ed o
r util
ized
in a
ny fo
rm, w
ithou
t prio
rw
ritte
n au
thor
izat
ion
by T
he C
anno
n C
orpo
ratio
n.
No. STAGE 3.2 COSTING SUBMISSION 06-28-2013
MMM Group LimitedMechanical and Electrical Engineering
100 Commerce Valley Drive W.Thornhill , ON L3T 0A1
905.882.1100
Halsall Associates Ltd.Structural Engineering
2300 Yonge Street, Suite 2300Toronto, Ontario M4P 1E4
416.487.5256
200 University Avenue, Suite 1200Toronto, Ontario M5H 3C6
T: 416.915.0121F: 416.915.0122
2200 Eglinton Ave WestMISSISSAUGA , ONTARIO
Drawings are not to be scaled.
Contractor must verify all dimensions on the job andreport any discrepancy to architects before proceedingwith the work
All drawings and specifications are the property of thearchitect and must be returned at the completion of thework
This drawing is not to be used for construction untilcountersigned.
Signature: Date:
Trillium Health Partners
020629.00 R.S.
Credit Valley HospitalPriority Areas
Redevelopment Project(Phase 3)
05/0
8/20
13 8
:55:
54
3.2.1.9.03.5
PHASING PLAN - LEVEL 3
2 DD Ministry Submission 3.2 forCosting Review
28.06.20133 DD Ministry Submission 3.2 09.08.2013
NOTES:
- ALL AREAS OUTSIDE AREA OF CONSTRUCTION TO BE MAINTAINED FULLY OPERATIONAL
- EXISTING AREAS SHOWN IN BLACK & WHITE
-COMPLETED & OCCUPIED NEW CONSTRUCTION SHOWN WITH COLOUR
-REFERENCE WORK SEQUENCING DIAGRAMS
AREA OF CONSTRUCTION
MAINTAIN ACCESS THROUGH CONSTRUCTION
L3-XX
STAGE 5
L3-6
N
ABC
KEY PLAN
FG
H
Checked by:Project No.:
Drawing Title:
© Cannon Design 2013
© C
anno
n D
esig
n 20
13A
ll rig
hts
rese
rved
. No
part
of th
is d
ocum
ent m
aybe
repr
oduc
ed o
r util
ized
in a
ny fo
rm, w
ithou
t prio
rw
ritte
n au
thor
izat
ion
by T
he C
anno
n C
orpo
ratio
n.
No. STAGE 3.2 COSTING SUBMISSION 06-28-2013
MMM Group LimitedMechanical and Electrical Engineering
100 Commerce Valley Drive W.Thornhill , ON L3T 0A1
905.882.1100
Halsall Associates Ltd.Structural Engineering
2300 Yonge Street, Suite 2300Toronto, Ontario M4P 1E4
416.487.5256
200 University Avenue, Suite 1200Toronto, Ontario M5H 3C6
T: 416.915.0121F: 416.915.0122
2200 Eglinton Ave WestMISSISSAUGA , ONTARIO
Drawings are not to be scaled.
Contractor must verify all dimensions on the job andreport any discrepancy to architects before proceedingwith the work
All drawings and specifications are the property of thearchitect and must be returned at the completion of thework
This drawing is not to be used for construction untilcountersigned.
Signature: Date:
Trillium Health Partners
020629.00 R.S.
Credit Valley HospitalPriority Areas
Redevelopment Project(Phase 3)
05/0
8/20
13 8
:36:
18
3.2.1.9.02.1
PHASING PLAN - LEVEL 2
2 DD Ministry Submission 3.2 forCosting Review
28.06.20133 DD Ministry Submission 3.2 09.08.2013
NOTES:
- ALL AREAS OUTSIDE AREA OF CONSTRUCTION TO BE MAINTAINED FULLY OPERATIONAL
- EXISTING AREAS SHOWN IN BLACK & WHITE
-COMPLETED & OCCUPIED NEW CONSTRUCTION SHOWN WITH COLOUR
-REFERENCE WORK SEQUENCING DIAGRAMS
AREA OF CONSTRUCTION
MAINTAIN ACCESS THROUGH CONSTRUCTION
L2-XX
STAGE 2
2
TEMP.AMBULANCE
GARAGE
TEMP.FAST TRACK
RETAILPHARMACY
INFO DESK
TEMP.MAIN
ENTRANCE
L2-5
L2-5
L2-6
L2-7
L2-8
N
ABC
KEY PLAN
FG
H
Checked by:Project No.:
Drawing Title:
© Cannon Design 2013
© C
anno
n D
esig
n 20
13A
ll rig
hts
rese
rved
. No
part
of th
is d
ocum
ent m
aybe
repr
oduc
ed o
r util
ized
in a
ny fo
rm, w
ithou
t prio
rw
ritte
n au
thor
izat
ion
by T
he C
anno
n C
orpo
ratio
n.
No. STAGE 3.2 COSTING SUBMISSION 06-28-2013
MMM Group LimitedMechanical and Electrical Engineering
100 Commerce Valley Drive W.Thornhill , ON L3T 0A1
905.882.1100
Halsall Associates Ltd.Structural Engineering
2300 Yonge Street, Suite 2300Toronto, Ontario M4P 1E4
416.487.5256
200 University Avenue, Suite 1200Toronto, Ontario M5H 3C6
T: 416.915.0121F: 416.915.0122
2200 Eglinton Ave WestMISSISSAUGA , ONTARIO
Drawings are not to be scaled.
Contractor must verify all dimensions on the job andreport any discrepancy to architects before proceedingwith the work
All drawings and specifications are the property of thearchitect and must be returned at the completion of thework
This drawing is not to be used for construction untilcountersigned.
Signature: Date:
Trillium Health Partners
020629.00 R.S.
Credit Valley HospitalPriority Areas
Redevelopment Project(Phase 3)
05/0
8/20
13 8
:36:
18
3.2.1.9.02.1
PHASING PLAN - LEVEL 2
2 DD Ministry Submission 3.2 forCosting Review
28.06.20133 DD Ministry Submission 3.2 09.08.2013
NOTES:
- ALL AREAS OUTSIDE AREA OF CONSTRUCTION TO BE MAINTAINED FULLY OPERATIONAL
- EXISTING AREAS SHOWN IN BLACK & WHITE
-COMPLETED & OCCUPIED NEW CONSTRUCTION SHOWN WITH COLOUR
-REFERENCE WORK SEQUENCING DIAGRAMS
AREA OF CONSTRUCTION
MAINTAIN ACCESS THROUGH CONSTRUCTION
L2-XX
STAGE 3
3
REMOVE TEMP.AMBULANCE
GARAGE
TEMP.FAST TRACK
RETAILPHARMACY
INFO DESK
TEMP.MAIN
ENTRANCE
L2-9
L2-9
L2-10
L2-11
N
ABC
KEY PLAN
FG
H
Checked by:Project No.:
Drawing Title:
© Cannon Design 2013
© C
anno
n D
esig
n 20
13A
ll rig
hts
rese
rved
. No
part
of th
is d
ocum
ent m
aybe
repr
oduc
ed o
r util
ized
in a
ny fo
rm, w
ithou
t prio
rw
ritte
n au
thor
izat
ion
by T
he C
anno
n C
orpo
ratio
n.
No. STAGE 3.2 COSTING SUBMISSION 06-28-2013
MMM Group LimitedMechanical and Electrical Engineering
100 Commerce Valley Drive W.Thornhill , ON L3T 0A1
905.882.1100
Halsall Associates Ltd.Structural Engineering
2300 Yonge Street, Suite 2300Toronto, Ontario M4P 1E4
416.487.5256
200 University Avenue, Suite 1200Toronto, Ontario M5H 3C6
T: 416.915.0121F: 416.915.0122
2200 Eglinton Ave WestMISSISSAUGA , ONTARIO
Drawings are not to be scaled.
Contractor must verify all dimensions on the job andreport any discrepancy to architects before proceedingwith the work
All drawings and specifications are the property of thearchitect and must be returned at the completion of thework
This drawing is not to be used for construction untilcountersigned.
Signature: Date:
Trillium Health Partners
020629.00 R.S.
Credit Valley HospitalPriority Areas
Redevelopment Project(Phase 3)
05/0
8/20
13 8
:36:
18
3.2.1.9.02.1
PHASING PLAN - LEVEL 2
2 DD Ministry Submission 3.2 forCosting Review
28.06.20133 DD Ministry Submission 3.2 09.08.2013
NOTES:
- ALL AREAS OUTSIDE AREA OF CONSTRUCTION TO BE MAINTAINED FULLY OPERATIONAL
- EXISTING AREAS SHOWN IN BLACK & WHITE
-COMPLETED & OCCUPIED NEW CONSTRUCTION SHOWN WITH COLOUR
-REFERENCE WORK SEQUENCING DIAGRAMS
AREA OF CONSTRUCTION
MAINTAIN ACCESS THROUGH CONSTRUCTION
L2-XX
STAGE 4
4
REMOVE TEMP.ENTRY
TEMP.FAST TRACK
RETAILPHARMACY
INFO DESK
L2-12
CANNON DESIGN
CREDIT VALLEY HOSPITAL PHASING PLANS
28
cs&PARchITEcTsY E A RLOCALET Y P E
B R I E F
R O L E
2B WORKTERM CO-OPSEPT - DEC. 2012TORONTO, CANADAEDUCATION/JUDICIAL/RECREATIONAL/TEMP. RESIDENTIAL
Worked in a fast-paced environment involved in multiple projects on various stages of developmemt. Projects worked on: University of Windsor, McMaster University, Cresent School, Nelson Mandela Park Public School, Sterling Hall School, Artisian Drive Public School Addition York Region Women’s Shelter, Regina Police Headquarters, Sarnia Cineplex, 101 Erskine Condo.
- Prepared working drawings in AutoCAD and Revit- Helped set Revit office standards for all subsequent projects- Prepared presentation material using Photoshop, Illustrator, Powerpoint, Indesign, Excel- Coordinate with consultants and external landscape designers - Conducted facade, solar + programmatic space studies using Google sketch-up- Drew column and wall details for cineplex cinema - Built physical programmatic area pieces of Regina Police Station for client meetings - Calculated area of exposed building face to comply with Ontario Building Code requirements- Responsible for the site plan approval set for a small school addition - Troubleshoot with contractors on CAD related issues- Issue addendum and various contract admin- Assist marketing department with int. and ext. office events - Became unofficial designer of all internal office posters
INTERNshIP
2
1
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY AN AU
TOD
ESK STUD
ENT PR
OD
UC
T
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY
AN A
UTO
DES
K ST
UD
ENT
PRO
DU
CT
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY AN AU
TOD
ESK STUD
ENT PR
OD
UC
T
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY
AN A
UTO
DES
K ST
UD
ENT
PRO
DU
CT
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY AN AU
TOD
ESK STUD
ENT PR
OD
UC
T
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY
AN A
UTO
DES
K ST
UD
ENT
PRO
DU
CT
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY AN AU
TOD
ESK STUD
ENT PR
OD
UC
T
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY
AN A
UTO
DES
K ST
UD
ENT
PRO
DU
CT
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY AN AU
TOD
ESK STUD
ENT PR
OD
UC
T
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY
AN A
UTO
DES
K ST
UD
ENT
PRO
DU
CT
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY AN AU
TOD
ESK STUD
ENT PR
OD
UC
T
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY
AN A
UTO
DES
K ST
UD
ENT
PRO
DU
CT
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY AN AU
TOD
ESK STUD
ENT PR
OD
UC
T
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY
AN A
UTO
DES
K ST
UD
ENT
PRO
DU
CT
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY AN AU
TOD
ESK STUD
ENT PR
OD
UC
T
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY
AN A
UTO
DES
K ST
UD
ENT
PRO
DU
CT
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY AN AU
TOD
ESK STUD
ENT PR
OD
UC
T
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY
AN A
UTO
DES
K ST
UD
ENT
PRO
DU
CT
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY AN AU
TOD
ESK STUD
ENT PR
OD
UC
T
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY
AN A
UTO
DES
K ST
UD
ENT
PRO
DU
CT
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY AN AU
TOD
ESK STUD
ENT PR
OD
UC
T
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY
AN A
UTO
DES
K ST
UD
ENT
PRO
DU
CT
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY AN AU
TOD
ESK STUD
ENT PR
OD
UC
T
PRODUCED BY AN AUTODESK STUDENT PRODUCT
PRO
DU
CED
BY
AN A
UTO
DES
K ST
UD
ENT
PRO
DU
CT
CS&P ARchITEcTs
1. UNIVERSITY OF WINDOR ELEVATIONS REVIT+ ILLUSTRATOR
2. ARTISIAN PUBLIC SCHOOL ADDITIONAUTOCAD
3. SPECIALTY EQUIPMENT FAMILIESREVIT
3
30
PARKINARchITEcTsY E A RT E R MT Y P E
B R I E F
R O L E
TORONTO, CANADAJAN - APR. 2012 | MAY - AUG 20142A + 3B WORKTERM CO-OPP3 HEALTHCARE
Worked on schematic design for Milton Hospital and Joseph Brant Hospital P3 competition (2014)Worked on DD and CD for New Oakvile Hospital (2012)
- Designed Milton Hospital Main Entrance Lobby- Developed interior details and renders for public spaces (drawings confidential due to nature of competition)- Developed graphics, animation and drawing set for Day-in-the-Life experience- Attended user group meetings
RENDER PROVIDED BY DESIGNSTOR
INTERNshIP
FHC
FHC & DSCC
PTS
FHC
PPE
PPE
tag#tag#
tag#
PPE
SCOPECLEANER
SCOPECLEANER
1800
1565
∅2100
BIOLOGICALINDICATOR556x1024
BIOLOGICA
LIN
DICATO
R556x1024
B IOLOGICALINDICATOR556x1024
1545
1300
BENCH
1390
3 1 . 7 3
31.44
1 d a t a o ut l e t p e rse a t
( 8 - 1 0 p r o g r a m m e d )
S-8 UTILITY SINK
S-8 UTILITY SINK
S H O W E R
760
760
L SK
L DD
610 610 610 25
L DR L DRL D3
S-8 UTILITY SINK
S-8 UTILITY SINK
S-8 UTILITY SINK
XX-XX
XX-XX
ACCESS FROM BEHINDEQUIPMENT FO R SERVICE -ESSENTIAL RULE 6.5.1.1
9 1 5 m m
1220mm
1 2 2 0 m m1 2 2 0 m m
915mm
915mm
9 1 5 m m
9 1 5 m m
2x815mm
9 1 5 m mG L A S S 5 0 0 m m
F R A M E 6 0 0 m m
G L A S S 5 0 0 m m
F R A M E 6 0 0 m m
1220mm
915mm
915m
m
2x1070mm
2x1070mm
1220mm915m
m
1 2 2 0 m m
1 2 2 0 m m
915m
m
9 1 5 m m
ST O RA G ETO WE R
61 0 x6 1 0
FHC +DS CC
FHC
9 1 5 m m
S - 2 A
915m
m
915mm
TABLE,RAC
KING
STATION
3200x508
FRAME 1300mm
9 1 5 m m
915mm
I N T E G R A L S I N K
2x1070mm
2x1070mm
PTDWASTE
SD1
S-4
S - 1 7
W C - 3
W C - 3
GRB-2
G R B - 1
D E C O N T A M I N A T I O NS Y S T E M7 5 0 X 8 9 0
D E C O N T A M I N A T I O NS Y S T E M7 5 0 X 8 9 0
CLEAN
ER,ULTRASONIC
1524x635 C
LEANER,ULTRASO
NIC
1524x635
TABLE,W
ORK
2565x1118
WASH
ER/DISIN
FECTO
RAC
C.,RAC
KSTO
RAGEUNIT
3080x610
WASHER/DISINFECTO
RAC
C.,
TRAN
SFER
CART
759x730
WASHER/DISINFECTO
RAC
C.,
TRAN
SFER
CART
759x730
WASHER/DISINFECTO
RAC
C.,
TRAN
SFER
CART
759x730
WASHER/DISINFECTO
RAC
C.,
TRAN
SFER
CART
759x730
WASHER/DISINFECTO
RAC
C.,
TRAN
SFER
CART
759x730
WASHER/DISINFECTO
RAC
C.,
TRAN
SFER
CART
759x730
WASHER/DISINFECTO
RAC
C.,
TRAN
SFER
CART
759x730
WASHER/DISINFECTO
RAC
C.,
TRAN
SFER
CART
759x730
WASHER/DISINFECTO
RAC
C.,
TRAN
SFER
CART
759x730
WASHER/DISINFECTO
RAC
C.,
TRAN
SFER
CART
759x730
T A B L EP A C K I N G
1 8 5 4 x 1 1 4 3
T A B L EP A C K I N G
1 8 5 4 x 1 1 4 3
T A B L EP A C K I N G
1 8 5 4 x 1 1 4 3
T A B L EP A C K I N G
1 8 5 4 x 1 1 4 3
T A B L EP A C K I N G
1 8 5 4 x 1 1 4 3
T A B L EP A C K I N G
1 8 5 4 x 1 1 4 3
T A B L EP A C K I N G
1 8 5 4 x 1 1 4 3
T A B L EP A C K I N G
1 8 5 4 x 1 1 4 3
T A B L EP A C K I N G
1 8 5 4 x 1 1 4 3
HS 1
PTD 1
EW-1
PTD
WASTE
SD1
E W - 1
EW-1
E W - 1
EW-1
GD 1
24x72WORKSURFACE
24x42WORK
SURFAC
E
16x36
OVERH
EAD
BINDER BIN
24x72WORKSURFACE
24x42
WORK
SURFAC
E
16x36OVERH
EADBINDER B
IN
16x30OVERH
EADBINDER B
IN
E S - 1
LOCKER
LOCKER
FHC
9 1 5 m m
1 2 2 0 m m
FHC
FHC
915m
m
1220mm
9 1 5 m m 2 4 x 7 2W O R K S U R F A C E
24x42
WORK
SURFAC
E
16x36OVERH
EADBINDER B
IN
16x30OVERH
EADBINDER B
IN
F D
F D
F D
F D
TABLE, M
EETING
1524x762
TABLE, MEETING1524x762
TABLE, MEETING1524x762
JANITOR'S SINK
MS-
1
FD
JANITOR'S SINK
M S - 1
FHC
FHC
E W - 1
SHELVIN
G,OPEN
1426x305
EW-1
F D
SHELVING,
OPEN
1426x305
PT D
WASTE
SD 1
S - 1
PTD
WASTE
SD1
S-1
F D
PTD
WASTE
SD1
S-1
PT D
WASTE
SD 1
S - 1
PTDSD1
S-1
ST O RA G ETO WE R
61 0 x6 1 0
1 2 2 0 m m
915m
m
915mm
S - 2 A
W C - 3
F D F D
WASHER/DISINFECTO
RAC
C.,
TRAN
SFER
CART
759x730
WASHER/DISINFECTO
RAC
C.,
TRAN
SFER
CART
759x730
WASHER/DISINFECTO
RAC
C.,
TRAN
SFER
CART
759x730
WASHER/DISINFECTO
RAC
C.,
TRAN
SFER
CART
759x730
WASHER/DISINFECTO
RAC
C.,
TRAN
SFER
CART
759x730
WASHER/DISINFECTO
RAC
C.,
TRAN
SFER
CART
759x730
2x815mm
1220mm
1220mm
2x815mm
460m
m460m
m460m
m460m
m
460m
m
460mm
24x42WORKSURFACE
16x30OVERHEADBINDER BIN
16x42OVERHEADBINDER BIN
1 6 x 2 2 B B F
FRAME 1150mm
9 1 5 m m
GD 1
PTD
WASTE
SD1
S-1
915mm
915mm
GLASS 1050m
m
FRAM
E 1150m
m
915mm
PTD
SD1
S-1
PT D WASTE
SD 1
S - 1
PT DSD 1
S - 1
PT DSD 1
S - 1
460m
m
FHC
FHC
FHC
31.67comp. st .
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
CART,C
ASE,CLO
SED991x686
CART,C
ASE,CLO
SED991x686
CART,C
ASE,CLO
SED991x686
CART,C
ASE,CLO
SED991x686
CART,C
ASE,CLO
SED991x686
CART,C
ASE,CLO
SED991x686
CART,C
ASE,CLO
SED991x686
CART,C
ASE,CLO
SED991x686
CART,C
ASE,CLO
SED991x686
CART,C
ASE,CLO
SED991x686
CART,C
ASE,CLO
SED991x686
CART,C
ASE,CLO
SED991x686
CART,C
ASE,CLO
SED991x686
CART,C
ASE,CLO
SED991x686
CART,C
ASE,CLO
SED991x686
CART ,C
ASE,CLO
SED991x686
CART,C
ASE,CLO
SED991x686
CART,C
ASE,CLO
SED991x686
CART,C
ASE,CLO
SED991x686
CART,C
ASE,CLO
SED991x686
CART,C
ASE,CLO
SED991x686
CART,C
ASE,CLO
SED991x686
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
CART,C
ASE,CLO
SED991x686
CART,C
ASE,CLO
SED991x686
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
SUPPLY
CART
1219x610
S U P P L YC A R T
1 3 2 1 x 7 1 1
S U P P L YC A R T
1 5 7 5 x 6 8 6
S U P P L YC A R T
1 6 0 0 x 7 1 1
S U P P L YC A R T
1 5 7 5 x 6 8 6
SUPPLY
CART
1626x559
SUPPLY
CART
1626x559
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
SUPPLY
CART
1626x559
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
SUPPLY
CART
1626x559
SUPPLY
CART
1626x559
SUPPLY
CART
1626x559
SUPPLY
CART
1626x559
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
SUPPLY
CART
1564x610
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9 S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
SUPPLYCART
1626x559
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
T R A N S F E RC A R T
7 5 9 x 7 3 9
T R A N S F E RC A R T
7 5 9 x 7 3 9
T R A N S F E RC A R T
7 5 9 x 7 3 9
T R A N S F E RC A R T
7 5 9 x 7 3 9
T R A N S F E RC A R T
7 5 9 x 7 3 9
T R A N S F E RC A R T
7 5 9 x 7 3 9
T R A N S F E RC A R T
7 5 9 x 7 3 9
T R A N S F E RC A R T
7 5 9 x 7 3 9
T R A N S F E RC A R T
7 5 9 x 7 3 9
T R A N S F E RC A R T
7 5 9 x 7 3 9
WI R EC A R T
1 5 2 4 x 6 1 0
WI R EC A R T
1 5 2 4 x 6 1 0
WI R EC A R T
1 5 2 4 x 6 1 0
WI R EC A R T
1 2 1 9 x 6 1 0
WIRE
CART
1524x610
WIRE
CART
1524x610
WIRE
CART
1524x610
WIRE
CART
1524x610
WIRE
CART
1524x610
WIRE
CART
1524x610
WIRE
CART
152 4x610
WIRE
CART
1524x610
CAB
INET
1219x457
C A B I N E T1 2 1 9 x 4 5 7
CART,
HOUSEK
EEPING
559x1226
HAM
PER,LIN
EN483x381
H A M P E R ,LI N E N
4 8 3 x 3 8 1
H A M P E R ,LI N E N
4 8 3 x 3 8 1
H A M P E R ,LI N E N
4 8 3 x 3 8 1
HAM
PER,LIN
EN483x381
HAM
PER,LIN
EN483x381
H A M P E R ,LI N E N
4 8 3 x 3 8 1
H A M P E R ,LI N E N
4 8 3 x 3 8 1
H A M P E R ,LI N E N
4 8 3 x 3 8 1
H A M P E R ,LI N E N
4 8 3 x 3 8 1
H A M P E R ,LI N E N
4 8 3 x 3 8 1
H A M P E R ,LI N E N
4 8 3 x 3 8 1
H A M P E R ,LI N E N
4 8 3 x 3 8 1
H A M P E R ,LI N E N
4 8 3 x 3 8 1
S H E L V I N G ,S T E E L
9 1 4 x 4 5 7
S H E L V I N G ,S T E E L
9 1 4 x 4 5 7
UT I LI T YC A R T
5 8 4 x 1 3 9 7
UT I LI T YC A R T
5 8 4 x 1 3 9 7
UT I LI T YC A R T
5 8 4 x 1 3 9 7
UTILITY
CART
584x1397
UTILITY
CART
584x1397
LI N E NC A R T
1 6 5 1 x 6 1 0
LI N E NC A R T
1 6 5 1 x 6 1 0
LINEN
CART
1651x610
LI N E NC A R T
1 6 5 1 x 6 1 0
LI N E NC A R T
1 6 5 1 x 6 1 0
R A C K , D I S P O S A B L E W R A P1 6 0 0 x 6 8 6
R A C K , D I S P O S A B L E W R A P1 6 0 0 x 6 8 6
RACK, DISPO
SABLE W
RAP1600x686
RACK, DISPOSABLE W
RAP
1600x533
CHAIR-
STACKING
CHAIR-
STACKING
CHAIR-
STACKING
CHAIR-
STACKING
CHAIR-STACKING
C H A I R -T A S K w /
A R M S
CHAIR-TASK w/ARMS
CHAIR-TASK w/ARMS
CHAIR-TASK w/ARMS
CHAIR-TASK w/ARMS
C H A I R -T A S K
S T A N D A R D
CHAIR-
TASK w
/ARMS
FRIDGE
FI L E , L A T E R A LD R A W E R S9 1 4 x 3 0 5
FILE,LATERALDRAW
ERS914x305
FILE,LATERALDRAW
ERS914x305
FILE,LATERALDRAW
ERS914x305
FI L E , L A T E R A LD R A W E R S9 1 4 x 3 0 5
CART, RESU
SCITATIO
N, C
ARDIAC1092x584
CART, RESU
SCITATIO
N, C
ARDIAC1092x584
CART, RESU
SCITATIO
N, C
ARDIAC1092x584
24x42WORKSURFACE
C O P I E R -L A R G E
TABLE, MEETING1524x762
CART, RESU
SCITATIO
N, C
ARDIAC1092x584
CHAIR-
TASK w/
ARMS
16x22 BBF
CHAIR-
TASK w
/ARMS
16x22 BBF
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
SUPPLY
CART
1626x559
SUPPLY
CART
1626x559
T R U C K ,R E F U S E / U T I L I T Y
1 0 8 0 x 7 7 5
H A M P E R ,LI N E N
4 8 3 x 3 8 1
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
SUPPLYCART
1626x559
C A R T , R E S U S C I T A T I O N , C A R D I A C1 0 9 2 x 5 8 4
C A R T , R E S U S C I T A T I O N , C A R D I A C1 0 9 2 x 5 8 4
CART, RESU
SCITATIO
N, C
ARDIAC1092x584
C A R T , R E S U S C I T A T I O N , C A R D I A C1 0 9 2 x 5 8 4
H E A TS E A L E R5 0 8 x 2 7 9
H E A TS E A L E R5 0 8 x 2 7 9
DVD
BOOKCASE
914X305
W/R5 C H A I R -S T A C K I N G
C H A I R -S T A C K I N G
C H A I R -S T A C K I N G
C H A I R -S T A C K I N G
C H A I R -S T A C K I N G
CHAIR-
STAC
KING
CHAIR-
STAC
KING
CHAIR-
STAC
KING
CHAIR-
STAC
KING
CHAIR-
STAC
KING
CHAIR-
STAC
KING
CHAIR-
STAC
KING
CHAIR-
STAC
KING
C H A I R -S T A C K I N G
CHAIR-TA SK w/AR MS
CART,
HOUSEK
EEPING
559x1226
C A R T , R E S U S C I T A T I O N , C A R D I A C1 0 9 2 x 5 8 4
LI N E NC A R T
1 6 5 1 x 6 1 0
LI N E NC A R T
1 6 5 1 x 6 1 0C A B I N E T7 6 2 x 7 3 7
CHAIR-
TASK w
/ARMS
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
SUPPLY
CART
1626x559
SUPPLY
CART
1626x559
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
CART,C
ASE,CLO
SED991x686
CART,C
ASE,CLO
SED991x686
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
CART,C
ASE,CLO
SED991x686
CART,C
AS E,CLO
SED991x686
S U P P L YC A R T
1 5 4 2 x 5 5 9
C H A I R -T A S K w /
A R M S
C H A I R -T A S K
S T A N D A R D
CHAIR-
STACKING
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , C A S E , C L O S E D9 9 1 x 6 8 6
C A R T , R E S U S C I T A T I O N , C A R D I A C1 0 9 2 x 5 8 4
CART,C
ASE,CLO
SED991x686
SUPPLYCART
1626x559
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
S U P P L YC A R T
1 6 2 6 x 5 5 9
1 2 3 4 5 6 7 8 9 10 11
d1
d2
d3
d4
d4.3
d5
d6
Aa7-201 4A-
-
Aa7-201 3A
Aa7-201
2AFEMALE STAFF
FACIL
31.10cB1- 007
?
MANAGER
31.1cB1- 014
?
UNIFORM
31.11cB1- 010
?
INTER CHANGE
31.13cB1- 009
?
31.14
31.15
31.16
31.17
31.18
31.20
?
??
?
31.21
31.22
31.23
31.25
31.27
PATIENTEQUIPMENTCLEANING
31.28cB1 -02 1B
?
RO WATER
31.30cB1- 023
?
31.3
DETERGENT
31.31cB1- 024
?
SOILEDELEVATOR
C-S9
31.32C-S9
0.41
HSKP
31.33cB1- 045
?
INTER CHANGE
31.37cB1- 011
?
31.38
31.39
31.40
COMMUNICATION/RECEPTION
31.4cB1- 005
?
31.41
31.42
31.43
31.44
31.45
31.46
31.47
31.48
STERILIZERCOOL DOWN
AREA
31.49cB1- 026
0.41
?
FILES
31.5cB1- 006
?
31.51
31.52
HSKP
31.53cB1- 036
0.41
31.56
?31.60
31.61
31.62
?
EQUIPSTORAGE
31.64cB1- 002
?
?
31.66
31.67
31.69
CONFERENCE
31.7cB1- 020
?
31.73
BREAKOUT
31.76cB1- 004
?
31.77
STAFFLOUNGE
31.8cB1- 013
?
MALE STAFFFACIL
31.9cB1- 008
?
31.19-01
31.19-02
31.24-01
31.24-02
31.26-01
31.26-02
31.29.1
31.29.2
31.29.3
SINK/ EYEWASH
31.34-01cB1 -02 1A
?
SINK/EYEWASH
31.34-02cB1 -02 1C
?
SINK/ EYEWASH
31.54-01cB1 -02 5A
?
SINK/ EYEWASH
31.54-02cB1 -02 5B
?
31.55.1
31.55.2
31.57-a
31.57-b
31.57-c
31.57-d
31.57-e
31.57- f
31.57-g
ST-WR-BF
31-?????cB1- 046
0.3
VESTIBULE
C-B1- V4cB1 -C 12
0.3
EQUIP STOR
38.35-02cB1- 047
38.35
STORESBIO-ENG
38.38.bcB1- 039
?
STORESPHARMACY
38.38.hcB1- 037
?
STORES RADIOFILM
38.38.kcB1- 040
?
STORESOCCUPATIONAL
HEALTH ANDSAFETY
38.38.lcB1- 038
?
ST-WR
31.9cB1 -00 8A
?
ST-WR
31.10cB1 -00 7A
?
P42 C P42 P42P42 C
P42C P42 C
P42C
P42 C P42 C P42 C
P42C
P42 C P42 C P42 C
P42C
P42 C
P42 C
P42 C
P42C
P42
P42
P42
P42
P48P4 2 B
P48
P42
P42
P42
P42 P4 2 B
P49
P42
P42 C
P3
P42
P42
P48
P48
P42
P49
P48
P42
P42
P42
P42
P42
P3
P3 P3
P3
P3P3
P3
P3
P3
P3
P48
P42P4
2
P23
P22
P48
P42
P3 P48B
P49
P22 P22
P42
P42
P22
P22
P22
P42
P23
P3P3
P23
P23
P48
P48
P3
P3
P3
P49
P23
P42 C
P42C
P4 2 B
P4 2 B
P42
P4 2 B
P4 2 BP4 2 B
P23
P23
P49
P20
P23
P42
P42 C
P3
P3
P42
P48
P49
P48
P49
P42B
P23
P42
P42C
P3
P40
P40P40
P49
P42B
P42 C P48
P42
P48
P48 P42
P42
P42
P42
P42
P23
P48
P42
P42
P42B
P42C
P42 P42C
P23
DECONTAMINATIONcB1- 021
CLEANcB1- 025
STERILEcB1- 001
CONTROLROOM
C-B1- C2cB1- 003
?
CONTROLROOM
C-B1- C1cB1- 022
?
IT/LV
C-B1 -I1cB1- 061
?
SHELLcB1- 060
STOREScB1- 041
VESTIBULE
C-B1- V1cB1 -C 03
?
VESTIBULE
C-B1- V2cB1 -C 08
?
???cB1- 048
ELEVATORSCONTROL
ROOMcB1- 049
VESTIBULE
C-B1- V3cB1 -C 11
?cB1-C11.1
cB1-C11.2
cB1-060
cB1-
036
cB1-
003
cB1-
004.
1
cB1-
041
cB1-
046
cB1-
047
cB1-
048
cB1-
049
cB1-C08.2
cB1-
C03
.2cB
1-C
03.1
cB1-002
cB1-
004.
2
cB1-026
cB1-025.2
cB1-024 cB1-023
cB1-
02
cB1-025.1
cB1-
014
cB1-
013
cB1-
005.
1
cB1-
007
cB1-007B
cB1-008
cB1-
012
cB1-
011.
1
cB1-
011.
2
cB1-
009.
1
cB1-
020
cB1-
100
cB1-C08.1
cB1-
061
cB1-C12.2
cB1-
C12
.1
ZONE
1 /
Ad3-
B11
STAIR10C- B1
ELEVATORC-S4
ELEVATORC-S5
ELEVATORC-S6
ELEVATOR PITC-S7
CLEANELEVATOR
C-S8
31.7431.74
0.41
HWScB1 -00 5A
cB1-007A
cB1-
008A
cB1-
008B
ST-SHWR
31.9cB1 -00 8B
?
ST-SHWR
31.10cB1 -00 7B
?
cB1-
C01
ELECTRICAL
C-B1- E1cB1- 050
?
CORRIDORcB1 -C 01
CORRIDORcB1 -C 02
CORRIDORcB1 -C 04
CORRIDORcB1 -C 05
SERVICELOBBY
C-B1- S1cB1 -C 06
0.25
CORRIDORcB1 -C 07
CORRIDORcB1 -C 10
CORRIDORcB1 -C 09
2476
2440
1800
2440
2440
2325
2060
24402295
cB1-050
ZONE 2 / Ac3-B12 ZONE 2 / Ac3-B12
Ask-c041Ask-c04 2
cB1-
001
cB1-005.2
cB1-
009.
2
cB1-
021.
1
cB1-021.2
300
1145 1660 1070 2250
380
2213
dB1-
001.
2
H
TRUE NORTHCONSTRUCTION NORTH
A Partnership of Corporat ions
A R C H I T E C T S L I M I T E D
KEY PLAN
NO. ISSUED DATE
REVISIONS
Discrepancies must be reported immediately to theArchitect before proceeding. Only figured dimensons areto be used. Contractors must check all dimensions onsite. This drawing is protected by copyright.
ALL DIMENSIONS ARE SHOWN IN METRIC.
DRAWING TITLE
DRAWN CHECKED
SCALE @ A0 DATE
PROJECT NO.
DRAWING NO. ISSUED NO.
PROJECT
STAMP
ARCHITECTS IN JOINT VENTURE
+
STAMP
DRAWING STATUS
ab
dc
p
PROG
RESS
1 : 100
6/5/
2012
8:2
0:32
PM
C:\U
sers
\pu0
45\D
ocum
ents
\100
5-no
h-bu
ildin
g-c_
Fred
die
Cha
n.rv
t
6/5/
2012
8:20
:32
PM
01 ISSUED FOR 50% DD SUBMISSION 21.SEPT.2011
Ac3-B11
Interior Fit -up PackageBlock C Level B1 Basement Plan
- Zone C1
06
03/20/12
MMMAuthor
1005-1003
02 ISSUDE FOR PROGRESS SET 14.OCT.2011
03 ISSUED FOR BUILDING ENVELOPEPERMIT 12.DEC.2011
04 ISSUED FOR 100% DD SUBMISSION 22.FEB.2012
NOT FOR CONSTRUCTION
ALL PARTIT IONS ARE P1 UNLESS INDICATED OTHERWISEALL FURRING ARE P20 UNLESS INDICATED OTHERWISE
CENTRAL STERILE PROCESSING DEPARTMENT100% DD SUBMISSION
INTERIOR COURTYARDS SECTION
PARKIN ARchITEcTs
32
NKARchITEcTsY E A RLOCALET Y P E
B R I E F
R O L E
SUMMER INTERNAPRIL - MAY 2011TORONTO, CANADARESIDENTIAL
Involved in the design development of a two-storey private residential house in Toronto. Working in an intimate studio environment allowed for participation in the design discussion of all office projects.
- Built physical and digital sketch models for facade studies and central courtyard light studies- Schematic design of upper bedroom floorplan - Went on site-visits to check construction progress- Attended client meetings
UPPER FLOOR PLAN
INTERNshIP
FACADE ITERATIONS
NKA ARchITEcTs
ThANK yOu
SHENG WU
sw3wu@uwaterloo.casheng.wu92@gmail.com