ShengWu portfolio 2014

34
PORTFOLIO BY ARCHITECTURE + DESIGN SHENG WU

description

Selected Works by 4A student at the University of Waterloo

Transcript of ShengWu portfolio 2014

Page 1: ShengWu portfolio 2014

PORTFOLIO

B Y

ARCHITECTURE + DESIGN

SHENG WU

Page 2: ShengWu portfolio 2014
Page 3: ShengWu portfolio 2014

INDEX

P R O J E C T S

INTERNSHIP

E N J O Y .

THE COURT COMPLEX

THE CRAFT ARCHIVE

ST. CATHERINE’S MONASTERY

TWO WOOD BOXES

RAMSA

CANNONDESIGN

CS&P

PARKIN ARCHITECTS

NKA

CURRICULUM VITAE

06

14

20

22

24

26

28

30

32

04

Page 4: ShengWu portfolio 2014

4

cuRRIcuLumVITAE

Candidate for Bachelor of Architectural Studies Co-OpUniversity of WaterlooCambridge, OntarioExcellent Acedemic Standing ‘10 - present

Bayview S.SRichmond Hill, OntarioPre-International BaccalaureateHonour Roll

Global Total Office Toronto Film Festival1st place Best Seat in the House Design Competition with Cannon Design

“Best Smile” at office Holiday Party votewith CS&P

St. Catherine’s MonasteryPublished in Archnet International Journal for Architecture Research

University of Waterloo Presidents Scholarship

Graduated High School as Ontario Scholar

Acadia Conference Exhibition Set-up | Food&Bar

Waterloo Entrance Interview Panel

Waterloo Architecture Student Association2A Class Representative

Choreographer Athru | 2A Iconography Class Play

Waterloo Open House Tour Guide

ADVENT TaiwanVolunteer English Teacher

Revit + DrofusRhinoceros + VrayAutoCadGoogle SketchUpAdobe Creative SuiteMicrosoft Office 3D PrintingLaser cuttingCNC

Model MakingDraftingFree Hand Sketching

EnglishMandarin

EDUCATION

Post-Secondary2010 -2015

Secondary2008-2010

2006-2008

RECOGNITION

2013

2012

2011

2010

INVOLVEMENT

2013

2012

2011

SKILLS

Digital

Analog

Language

Langstaff S.S.Richmond Hill, OntarioHonour Roll

shENg wu

Page 5: ShengWu portfolio 2014

cONTAcT

SHENG WU

[email protected]@gmail.com1-647-648-8852

Email

Phone

REsumé

NKArchitectsToronto, Canada | Apr-MayWorked on a private Toronto residence - Built physical and digital study models in SketchUp- Designed different facade options for client- Went on site visits to check construction progress

Parkin Architects IncToronto, Canada | May - Aug | Jan - April 2012Worked on schematic design for Milton Hospital and Joseph Brant Hospital P3 compeition (2014) Worked on New Oaskville Hospital (NOH) during DD and CD (2012)- Designed Main Entrance Lobby working closely with project architect- Developed interior details and renders of main public spaces

CS&P ArchitectsToronto, Canada | Sept - DecWorked on multiple projects of different scale with focus on recreational, judicial and educational use- Prepared working drawings in AutoCAD and Revit for various projects- Helped develop new Revit office standards for all subsequent projects- Created schematic drawings, models and graphic presentation material- Contacted consultants for coordination and various contract administration

Cannon DesignToronto, Canada | May - AugWorked on the renovation and redevelopment of Credit Valley Hospital in Mississauga, Ontario- Responsible for architectural phasing documents- Assisted in maintaining project consistency in Revit- Managed program changes and produced RDS in dRofus- Responsible for all typical room templates- Involved in Material &Finishes meeting and documentation

Robert A.M. SternNew York, USA | Jan - AprilCo-ordinator of physical project models for University of Nebraska, college of Business- Worked with internal model shop to decide on best method of fabrication- Created lasercut files and 3D print files using AutoCAD, Revit, Rhino and Makerware- Photographed and edited photos of physical models for use in presentation

D.More DesignTaipei, Taiwan | June - JulyWorked on an one storey office turned apartment renovation - Took on-site measurements and drew existing plans- Created different layout options for client- Redecorated office interior

WORK

2014

2013

2012

2011

Page 6: ShengWu portfolio 2014

6

ThEcOuRTcOmPLEXY E A RS I T ET Y P E

B R I E F

3A STUDIO FINAL - PROF. PHILIP BEESLEY201311WELLESLEY ST. TORONTO, CANADAMIXED - THEATRE/RESIDENTIAL/RETAIL

N

sTuDIO PROjEcTs

EMBLEMATIC RENDER

This project is meant to address the increasing need for public park space in the urban fabric of Toronto as the city continues its densification. The program also recognizes the need for more housing and the desire for a space for cultural events to take place. The approach was to create a “sanctuary courtyard” as the place of junction for the residents, theater school students, theatre patrons and for the general public. The project also seeks to further toronto’s underground pass system by layering public space vertically. It is an experiment in bringing greenery upward in the residential tower in a spiraling promenade of private communal space for the residents.

Page 7: ShengWu portfolio 2014

12

10

11

121

2

4

5

3

6

788 99

1.THEATRE LOBBY 2.COAT ROOM 3.PRODUCTION CONFERENCE ROOM 4.STAGE LOADING ELEVATOR

ThE cOuRT cOmPLEX

RENDERED GROUND FLOOR PLAN5.THEATRE OFFICES 6.RESIDENTIAL LOBBY 7.BIKE STORAGE/WORKSHOP 8.RETAIL

9.RESTAURANT 10.UNDERGROUND PARKING ENTRANCE 11.LIVE-WORK UNITS 12.LIVE-WORK GALLERY

CIRCULATION1.SPIRALING THEATRE ROUTE TO ROOF TOP2.DIRECT VERTICAL CIRCULATION TO ROOF TERRACES 3.STREET ACCESS POIINTS TO COURTYARD

1 2 3

Page 8: ShengWu portfolio 2014

8

RETAILWELLESLEY ST

BREADALBANE ST

RESI

DENT

IAL

FLY

ART

LIVE-WORK

THEATRE

N

MORPHOLOGY

WORKSHOP

DRESSING

LOBBY

UNDERGROUND LOBBY/GALLERY

BOARDWALK

ROOFTOP

COURTYARD

REHEARSAL

RETAILWELLESLEY ST

BREADALBANE ST

RESI

DENT

IAL

FLY

ART

LIVE-WORK

THEATRE

N

MORPHOLOGY

RETAILWELLESLEY ST

BREADALBANE ST

RESI

DENT

IAL

FLY

ART

LIVE-WORK

THEATRE

N

MORPHOLOGY

RETAILWELLESLEY ST

BREADALBANE ST

RESI

DENT

IAL

FLY

ART

LIVE-WORK

THEATRE

N

MORPHOLOGY

THEATRE LOBBY SECTIONRHINO + PHOTOSHOP + ILLUSTRATOR

sTuDIO PROjEcTs

1 2 3 4

Page 9: ShengWu portfolio 2014

RETAILWELLESLEY ST

BREADALBANE ST

RESI

DENT

IAL

FLY

ART

LIVE-WORK

THEATRE

N

MORPHOLOGY

RETAILWELLESLEY ST

BREADALBANE ST

RESI

DENT

IAL

FLY

ART

LIVE-WORK

THEATRE

N

MORPHOLOGY

ThE cOuRT cOmPLEX

RETAILWELLESLEY ST

BREADALBANE ST

RESI

DENT

IAL

FLY

ART

LIVE-WORK

THEATRE

N

MORPHOLOGY

NORTH-SOUTH SECTIONREVIT + ILLUSTRATOR

STUDIO OPEN STUDIOSTUDIO

LOBBYLOBBY

DRESSING

WORKSHOP WORKSHOP WORKSHOPSTORAGELOAD

WORKSHOP

DRESSING DRESSING DRESSING WARDROBEPARKING

LIVE

SHARE

SHAREDSPACE

LOUNGE

PODIUM MORPHOLOGY1.PROGRAM ORGANIZATION(THEATRE AND PARKING UNDERGROUND)2.ALLOW FLYTOWER AND GALLERY PEEK THROUGH FROM UNDERNEATH3.CREATE POCKETS OF TIGHT PUBLIC SPACE ALONG STREET PERIMETERS4.FUNNEL OPENINGS FOR PEDESTRIANS + BICYCLES5.RECONNECT WITH CONTINUOUS GREEN ROOF TOP6.REFLECT BUILDING ANGLES AND LEVELS ON PUBLIC SURFACES

5 6

Page 10: ShengWu portfolio 2014

10

WELLESLEY STREET ELEVATION

sTuDIO PROjEcTs

SECOND FLOOR PLAN

Page 11: ShengWu portfolio 2014

1

1

1

5

4

3

2

1

1

2

2

3

456

8

7

2

ThE cOuRT cOmPLEX

SECOND FLOOR PLAN

BASEMENT FLOOR PLAN

ROOF TOP FLOOR PLAN

1.WORKSHOPS2.SECOND THEATRE LOBBY3.AUDITORIUM 4.STAGE5.PARKING

TOWER COMMUNAL SPACESCONNECTED BY SPIRALING STAIRWAY1.ROOFTOP LOUNGE2.GARDEN LOUNGE3.PLAYGROUND4.FITNESS/YOGA5.COMMUNAL DINING6.READING

1.LARGE REHEARSAL STUDIO2.SMALL REHEARSAL STUDIO3.LOUNGE 4.CONDO BAR5.POOL6.RETAIL7.LIVE-WORK8.UPPER LEVEL BOARDWALK

1.CONDO ACCESS TO ROOFTOP/MULTI-PURPOSE ROOM2.BOARDWALK3.SEATING AREA

1

3

3

COMMUNAL DINNING

PLAYGROUND

GARDENLOUNGE

ROOFTOPLOUNGE

FITNESS/YOGA

READING

1

2

3

5

4

6

Page 12: ShengWu portfolio 2014

12 sTuDIO PROjEcTs

Page 13: ShengWu portfolio 2014

ThE cOuRT cOmPLEX

THE COURT RENDERRHINO + VRAY + PHOTOSHOP

Page 14: ShengWu portfolio 2014

14

ThEcRAFTARchIVEY E A RS I T ET Y P E

B R I E F

1B STUDIO FINAL - PROF. MAYA PRZYBYLSKI2010

48 McCAUL ST. TORONTO, CANADA

ARCHIVE

After visiting various Toronto archives and realizing the wealth of information that is stored in hidden away places, I wanted to generate spaces that would engage the public in visiting an archive. By allowing the public to glimpse into the private archive storage area and curating a route that wraps around the main exhibition, the building become one big display case for crafts. Emphasizing that crafts are often the intimate creation of our hands, vistors are made more aware of their bodies in space as they move through the building in an everchanging viewpoint to the centre. Furthermore, a direct viewing relationship amoung the different users (general public, researchers, staff) makes each visitor feel on display as well. The centre stage concept was developed from the idea of putting the craft under the spotlight.

sTuDIO PROjEcTs

1:100 BASSWOOD MODEL

CONTEXT

Page 15: ShengWu portfolio 2014

ThE cRAFT ARchIVE

‘AUDIENCE’(CAFE)

‘BACK OFHOUSE’(OFFICE)

‘CENTRE STAGE’

FRONT LOBBY

STORAGE SPACE

‘BALCONY SEATS’‘RESEARCH SPACE)

1:100 BASSWOOD MODEL

CRAFT AS STAGE THEATRE CONCEPT DIAGRAM

STREET ELEVATIONRHINO + VRAY + PHOTOSHOP

McC

AUL

STRE

ET

STEPHANIE STREET

GRANGE ROAD

CONTEXT

STREET ELEVATIONRHINO + VRAY + PHOTOSHOP

Page 16: ShengWu portfolio 2014

16

3

1

2

TOP FLOOR PLAN

3

1

2

42

1

3

B1 FLOOR PLAN

1.MAIN EXHIBITION SPACE2.SECONDARY GALLERY3.CAFE4.SERVICE

1.RESEARCHER SPACE2.MEETING ROOM3.SERVICE

1.ARCHIVE2.RENT-OUT STUDIO SPACE3.SERVICE

2ND FLOOR PLAN

sTuDIO PROjEcTs

Page 17: ShengWu portfolio 2014

B1 FLOOR PLAN

Main Exhibition Platform Lifts UpGround Floor Public Realm + Basement Storage Public Route Pushed Down to Further Reveal Storage Upward Public Route Made Continuous

Main Exhibition Platform Lifts UpGround Floor Public Realm + Basement Storage Public Route Pushed Down to Further Reveal Storage Upward Public Route Made Continuous

S TORAGE

P U B L I C

S TORAGE

P U B L I C

S TORAGE

P U B L I C

S TORAGE

P U B L I C

Main Exhibition Platform Lifts UpGround Floor Public Realm + Basement Storage Public Route Pushed Down to Further Reveal Storage Upward Public Route Made Continuous

Main Exhibition Platform Lifts UpGround Floor Public Realm + Basement Storage Public Route Pushed Down to Further Reveal Storage Upward Public Route Made Continuous

S TORAGE

P U B L I C

S TORAGE

P U B L I C

S TORAGE

P U B L I C

S TORAGE

P U B L I C

Main Exhibition Platform Lifts UpGround Floor Public Realm + Basement Storage Public Route Pushed Down to Further Reveal Storage Upward Public Route Made Continuous

Main Exhibition Platform Lifts UpGround Floor Public Realm + Basement Storage Public Route Pushed Down to Further Reveal Storage Upward Public Route Made Continuous

S TORAGE

P U B L I C

S TORAGE

P U B L I C

S TORAGE

P U B L I C

S TORAGE

P U B L I C

Main Exhibition Platform Lifts UpGround Floor Public Realm + Basement Storage Public Route Pushed Down to Further Reveal Storage Upward Public Route Made Continuous

Main Exhibition Platform Lifts UpGround Floor Public Realm + Basement Storage Public Route Pushed Down to Further Reveal Storage Upward Public Route Made Continuous

S TORAGE

P U B L I C

S TORAGE

P U B L I C

S TORAGE

P U B L I C

S TORAGE

P U B L I C 6

4

2

1

3

5

1.LOBBY2.MAIN EXHIBITION3.ARCHIVE VIEWING SPACE4.ADMINISTRATIVE OFFICE5.LOADING6.SERVICE

1.BASIC PROGRAM ELEMENTS- PUBLIC GROUND FLOOR-BASEMENT ARCHIVE

2.CENTRAL AREA LIFTS UP TO BECOME MAIN EXHIBITION PLATFORM

3.PUBLIC ROUTE PUSHED DOWN TO FURTHER REVEAL ARCHIVE

4.UPWARD PUBLIC ROUTE MADE CONTINUOUS TO BRING VISITORS TO SECOND GALLERY AND CAFE

1

2

3

4

GROUND FLOOR PLAN

ThE cRAFT ARchIVE

Page 18: ShengWu portfolio 2014

18 sTuDIO PROjEcTs

12

34

5

EMBLEMATIC DIAGRAM OF VIEWS OF CENTRE EXHIBITION1.ARCHIVE VIEWING AREA2.VIEW FROM FRONT OF BUILDING 3.VIEW FROM SECOND GALLERY4.VIEW FROM CAFE5.VIEW FROM RESEARCH AREA

Page 19: ShengWu portfolio 2014

EMBLEMATIC DIAGRAM OF VIEWS OF CENTRE EXHIBITION1.ARCHIVE VIEWING AREA2.VIEW FROM FRONT OF BUILDING 3.VIEW FROM SECOND GALLERY4.VIEW FROM CAFE5.VIEW FROM RESEARCH AREA

ThE cRAFT ARchIVE

Page 20: ShengWu portfolio 2014

20

sT. cAThERINE’s mONAsTERy Y E A RS I T ET Y P E

B R I E F

2A ICONOGRAPHY - PROF. TAMMY GABER2011MOUNT SINAI, EGYPTRELIGIOUS SPACE

Built on the holy site of Mount Sinai where Moses saw the burning bush, The Holy Monastery of the God-trodden Mount Sinai (now known as St. Catherine’s Monastery) symbolizes a peaceful point of encouter between three great monotheistic religions: Christianity, Islam, and Judaism. The monastery and fortification was commissioned in the 560’s to enclose the chapel of the burning bush and now also hosts a mosque within its walls. The project included physical modeling at 1:100 and accompanying research essay. Details of the space were interpreted from drawings and photographs. Entire model dimensions 2m x 2m x 0.8m, drawn in autocad and laser cut in millboard. Made in collaboration with Louis-Pierre Belec, James Banks, Danielle Rosen, Sheelah Tolton. Project was Published in Archnet International Journal for Architecture Research

sTuDIO PROjEcTs

Page 21: ShengWu portfolio 2014

sT. cAThERINE’s

SECTION CUT MODEL TO REVEAL INTERIORS OF BOTH CHURCH AND MOSQUE MILLBOARD

Page 22: ShengWu portfolio 2014

22

TwOwOODBOXEs Y E A R

B R I E F

WORKING WITH WOOD - PROF. HEINZ KOLLER & DAN JESSEL2012

The end products of the architecture woodshop elective that focuses on thinking and working with real materials and understanding the process of construction. The course greatly increased my appreciation of using materials and an iterative process as the source of design. Mistakes made during construction and the subsequent solutions defines the final box below.The puzzle box is the result of my experiments in different wood joinery and modern marquetry.

JAPANESE INSPIRED BOX MADE OF GONCALO ALVES AND CURLY MAPLE

sTuDIO PROjEcTs

Page 23: ShengWu portfolio 2014

PUZZLE BOX MADE OF PLY AND LASERCUT VENEER

TwO wOOD BOXEs

Page 24: ShengWu portfolio 2014

24

RAmsAARchITEcTsY E A RLOCALET Y P E

B R I E F

R O L E

3B WORKTERM CO-OPJAN - APRIL 2014NEW YORK, USAEDUCATION | INSTITUTIONAL

Worked on Univeristy of Nebraska, college of Business as co-ordinator and main maker of physical project models. Knowledge of Revit, Rhino, AutoCAD, lasercutting, 3D printing and traditional modeling methods allowed me to act as mediator between project design team and model shop team.

- Mixed medium physical modeling - Digital modeling- Revit and Photoshop rendered sections + elevations- Photographed models for presentation- Document and archive meetings

INTERNshIP

1/16 SCALE WORKING MODEL

Page 25: ShengWu portfolio 2014

CANNON DESIGN

UNIVERSITY OF NEBRASKA MODELS

Page 26: ShengWu portfolio 2014

26

cANNONDEsIgNY E A RLOCALET Y P E

B R I E F

R O L E

3A WORKTERM CO-OPMAY - AUGUST 2012TORONTO, CANADAHEALTHCARE|OTHER COMPETITIONS

Member of an international team (Boston, Toronto, New York) working on the renovation and redevelopment of Credit Valley Hospital in Mississauga, Ontario, Canada. Active member on other office initiatives and competitions. - Assisted BIM leader in maintaining project consistency of Revit Model- Managed program changes and produced room data sheets in dRofus- Responsible for all typical room templates- Involved in Material &Finishes meeting and documentation- Responsible for architectural phasing documents- Modeled existing building and new building exterior+interior- Coordinate project equipment, accessory, plumbing standards- Created graphics for Doors Open Toronto at Cannon Design- Created graphics for Global Total Office TIFF Chair Competition and responsible for execution of final chair design

INTERNshIP

ARA TIFF - WINNER OF GLOBAL OFFICE ‘BEST SEAT IN THE HOUSE’

Page 27: ShengWu portfolio 2014

x-122

x-123

3242

3249

3247

3245

3243wc115

wc116

wc117

wc118wc119

wc120

wc121

wc122

3252

3254

3256

3258

wc112 wc111

3225

wc110wc109wc108

x-121

322332213219

wc107

3217

wc113

3235

3238

wc114

3261

wc106

wc105

3262

3265

wc104wc103

3271

3273

3270

wc102

3279 3281

wc101 wc100

3283 3285

wc99

wc97

wc96

wc98

3289

3292

wc95

3212

3234

3201

3205

3204

wc86

3208

3200

3207

3206

3295wc85

3294

3269

3260

3179 3181 3183 3185

3173

wc241 wc240 wc239 wc238 3187

wc212 wc213

3170

3169

3189

3192

wc236

wc237

3165

wc214

wc215

3162

3171

3194

wc2353195

3105

3104

3103

3102

3101 3100

3106

3107

3108wc234

3115

3117 3119 3121 3123

31313133

3134

wc225

3135

3138

wc224

3141

3142

3143wc223

3145wc222

wc2213147

3149wc220

3152wc219

3154wc218

3156

3158wc216

wc217

3160

31513251

3125

R25

RJ

RH

RG

RF

RE

F

L

K

N1x N1 N2 N3

NFx

NG

NH

NJ

NK

NL

NLx

H

N25

9y 10 11 12 13 14 15 16 17 18 19 20

21

23 24 25 26 27

Ax

A

Dx

Ex

G

N25

25x

Fx

N25

AC

AB

AD

AE

D

E

N4 N4x

NT

NU

N5 N5x

N5y

N6 N7 N8

NS

NR

NQ

NP

NN

NM

NS

NR

NQ

NP

NN

NM

N17N17x

N17y

N18N19 N20

NT

NU

N9 N10 N11 N12N13 N14 N15 N16N16x

NF

N8NE

ND

NC

NB

NA

H

NF

NE

ND

NC

NB

NA

H

N20xN21N22 N23 N24N24N24

NG

NK

x-90

x-89

3302

3301

x-119

x-116

x-117

3403

3514

x-118

3448

3320

3310

3308

3306

33053304

x-242

3316

3321

3416

3570

3572

3573

Closet 6

35843585

3586358335823581

3576 3577

3587

x-225

3410 3408 34063401

3412

x-223

x-222

x-221 x-220 x-218x-219

3546

3547

3544

3542

3540

3537

3538

3539

3531

3518

3515

x-217

3513

3520

x-208 x-209 x-210 x-211 x-213

x-214

x-215

x-216

x-212

3324

3342

3326

3323

3321

3325 3341

33303338

3340

3345

3341

3339

3337

3336

33353333

3331

3329

3349

3334

3332

x-227

3424

3440

3438

3422

454325430543644344432443

3445 3449 34513443x-228

3439 3453

346134633459

34553457

3400x-2293402

x-224

x-226

x-230x-231

3542

wc-242

wc-243

wc-244 wc-246

sh

wc-248

wc-245

FHC

wc-247

pipes

ACT @ 2.7m

SH

FHC

x-206

x-205

3100CONFERENCE

ROOM

3101CRITICAL

3102OFFICE

3103OFFICE

3100NOURISHMENT

3105ENVIRONMENTAL

SERVICES

3106STAFFLOUNGE

3107SOILEDUTILITY

3108PATIENTROOM

3108PATIENTROOM

3112PATIENTROOM

3115PATIENTROOM

3117PATIENTROOM

3119PATIENTROOM

3121PATIENTROOM

3123PATIENT

3125PATIENTROOM

3131PATIENTROOM

3133PATIENTROOM

3134SHOWERROOM

3135PATIENTROOM

3138PATIENTROOM3141

SHOWERROOM

3142CLEANUTILITY

3143PATIENTROOM

3145PATIENTROOM

3147PATIENTROOM

3149PATIENTROOM

3160MEDICATION

ROOM

3158PATIENTROOM

3156PATIENTROOM

3154PATIENTROOM

3152PATIENTROOM

3151PATIENT &FAMILY

3162PATIENTROOM

3165PATIENTROOM

3169

ROOM

3170OFFICE

3171PATIENTROOM

3173PATIENTROOM

3179PATIENTROOM

3181PATIENTROOM

3183PATIENTROOM

3185PATIENTROOM

3189PATIENTROOM

3192PATIENTROOM

3195PATIENTROOM

3108a

3112a

3115a

a3213a1213a9113a7113

3125a3131a

3135a

3138a

3143a

3145a

3147a

3149a

3156a

3154a

3152a

3158a

3200OR

BOOKING

3206OFFICE

3207SOILEDHOLDING

3208PATIENTROOM

3205ENVIRO.SERVICES

3205NOURISHMENT

CENTRE

3201WAITINGAREA

3213CRITICALCARE

3213a

3213b

3217PATIENTROOM

3217a

3219PATIENTROOM

3219a

3221PATIENTROOM

3221a

3223PATIENTROOM

3223a

3235PATIENTROOM

3235a

3238PATIENTROOM

3238a

3242PATIENTROOM

3243PATIENTROOM

3245PATIENTROOM

3247PATIENTROOM

3249PATIENTROOM

3242PATIENTROOM

3258PATIENTROOM

3256PATIENTROOM

3254PATIENTROOM

3252aPATIENTROOM

3243a

3245a

3247a

3249a

3258a

3256a

3254a

3252a

3261STAFF

3262PATIENTROOM

3265PATIENTROOM

3270JIT

SUPPLES

3271PATIENTROOM

3273PATIENTROOM

3279PATIENTROOM

3281PATIENTROOM

3283PATIENTROOM

3285PATIENTROOM

3262a

3262a

326932713273

a5823a5823a3823a1823a9723

3289a

3289PATIENTROOM

3292PATIENTROOM

3292a

3294a

3295a

3294aPATIENT ROOM

3234

3225SATELLITE

CARDIAC CARE UNIT

3225a 3225b

X-231O.R.

RECEPTION

###OFFICE

3328

3345

3347

3330

3340

3338

33363334

3332

3331

3331a

3329

3325

3323

3323a 3321 3416FEMALELOCKERS

3412O.R.

RECEPTION

3412PACU

3436SOILEDUTILITY

3438NURSING STATION

(RECOVERY)

3440OFFICE

M NLK

333733353333

3326

3442REC. ISO.ROOM

3444STORAGE

3446STAFFLOUNGE

3448CLEANSUPPLY

3450ANAE.

WORK ROOM

3452EQUIP.STORAGE

3454DEPT. OF

ANAESTHESIA

3451OPERATING ROOM

#05

3449OPERATING ROOM

#04

3449OPERATING ROOM

#03

3447OPERATING ROOM

#2

3439OPERATING ROOM

#11

3453MAIN

CLEAN SUPPLY

3463OPERATING ROOM

#09

3463OPERATING ROOM

#08

3457OPERATING ROOM

#07

3455OPERATING ROOM

#06

###STERIL.RM.

3459INSTRU.CLEAN

3410SURGICAL

CARE CENTRE

3962OPERATING ROOM

#01

3406CARTROOM

3402ENDO MECH.

ROOM

3402EVS

3402ENDO MECH.

ROOM

CARTROOM

X-229STORAGE

3301OFFICE

3302LOCKERROOM

3303LOCKERROOM

3304W/R

3305ENV.SER.

3316O.R.

STORAGE

X-242

X-119

3310IP

LEARNING LAB

3308IP

LEARNING LAB

3306IP

LEARNING LAB

3320OFFICE

3547CONFERENCE

ROOM

3544SOILEDUTILITY

X-224

3539NOURISHMENT

ROOM

X-117CLEANSUPPLY

###ENV.SER.

3541W/R

3546CLEANSUPPLY

3542ELEC.

CLOSET #09

###ANTEROOM

3518OFFICE

3514SOILEDUTILITY

3515CLEANSUPPLY

X-217STAFFLOUNGE

X-118CLEANSUPPLY

X-212ANTEROOM

3513STAFF

3512ENV.SER.

3540CRITICAL CARE

B

3520CRITICAL CARE

A

1

2

3

13

14

15

16

3570W/R

3572PHYSICIAN

W/R

3573CLOSET #06

W/R

3581TREATMENTROOM

3582INTERVIEWROOM #01

3583INTERVIEWROOM #02

3584W/R

3585INTERVIEWROOM #03

3586INTERVIEWROOM #04

3587W/R

3587RECOVERY

20272018

20092000

2036

2009.8

993.7 1000.0 1010.0

166.34

174.34

178.1

FHC

SPRINK.

FHC

FHC

FHC

FHC

MED GAS

FHC

FHC

DAY SURGERY A

PACU H

BIRTHING SUITE

CCB CCA

PACU SURGICAL SUITES

67

101112

2

3

1

8

6 488

#18#17

#21

EXISTING PENTHOUS

EXISTING ROOF

EXISTING ELEC.RM. EXISTING

MECHANICALRM.

EXISTINGMECHANICAL

RM.

EXISTING ROOF

9101112

9101112

9101112

9101112

2

3

1

6 7

9 10

5

11 128

EXPANSION JOINT

EXISTING COURTYARDBELOW

#1

#3

#4

#5

#6

#7

3B CARDIO/MED3C

ACT

ACT

ACT

GYP CEILING, TERRAZZO FLOOR

ACT

ACT

ACT

ACT

ACTACT

ACT

ACT

ACT

ACT

ACT

GYP CEILING, TERRAZZO FLOOR

ACT

GYP

ACT

ACTACTACTACT

ACT

ACT

ACT

MTL PANEL

ACT

ACT

GYP

ACT

ACT

ACT

ACT ACT

ACT

ACT ACTACT ACT

ACT

ACT

ACT

ALUM CEILING

ACT

MTL PANEL

ALUM CEILING

ACTACT

ACTACT

ACTACT

ACTACT

ACTACT ACT

ACT

ACTACT

ACTACT

ACT ACT

ACTACT

Handwash

Handwash

DN

SS COUNTER SS COUNTER

skylight above

OR10

XXX

TWO-BED

1 0023

THREE-BED

1 0043

1 0053

1 0033

TWO

1 03

ONE-BED

1 1013

1 1023

1 1043

ONE-BEDBARRIER-FREE

1 1033

SOILEDWASH-UP/ UTILITY

1 2163

CLEANROOM

1 2173

CLEANROOM

1 2183 CYSTOSCOPY

1 2203

URODYNAMICS

1 2213

OPERATINGROOM A1

1 2223

OPERATINGROOM A2

1 2233

SCRUBAREA

1 2243

CORRIDOR

1 2253

CORRIDOR

1 2263

CLEAN UTILITYROOM

1 2193

CHANG

1

CHANGE

1 23

STORAGE RM

1 2043

W/C

1 2063

SOILEDHSE-KEE

1 2293

TRIAGE AND ASSESSMENTRECEPTION

2 0013

LBR/LBRP BEREAVEMENT C

2 0303

LBR/LBRP A

2 0123

LBR/LBRP A

2 0143

LBR/LBRP B

2 0163

LBR/LBRP A

2 0183

LBR/LBRP B

2 0203

LBR/LBRP A

2 0223

LBR

2

2 0153

2 0173

2 0193

2 0213

2 0233

2 0253

RECOVERYROOM

2 0513

OFFICE

2 0733

WR

2 0523

HK

2 0783

FEMALE CHANGE RM

2 0793

WR

2 0803

CLEANSUPPLY

2 0593

SOILED HOLDING

2 0603

OFFICE

2 0623

MONITORING ARCHIVE

2 0773

COMMUNICATIONCENTER

2 0653

WARMINGALCOVE

2 0683

STRTCHR AL

2 0583

REPORT/CONF

2 0723

CRCALC

23

SCRUB

2 0473

ALCOVE

2 0713

VISITOR WR B.F.

2 0743

FAMILY / PRE-OPWAITING

2 0763

EARLY LABOURFAMILY LOUNGE

2 0113

OFFICEON-CALL

2 0753

DISMANTLE& ASSEMBLY

2 1753

MOTHER RESIDNCE

2 1863

WR

2 1903

WR

2 1913

OR SUITE

2 3013

SHIELDED ORHDR

2 3143

CONTROL ROOM

2 3023

PLAN.WKRM

2 3033

CLEAN UTILITY

SOILED UTILITY

2 3063

EQUIP STORE

2 3073 RECOVERY BAYS

2 3083

PRE-OPHOLDING

2 3103

COUNSEL

2 3123 UNASS.

2 3133

CHNGE RM

2 3113

NRSHMNTCENTER

2 0643

SOILED

2 1713

RESPIRATORYTHERAPY

2 1763

MOTHER RESIDNCE

2 1873

MOTHERRESIDNCE

2 1893

MOTHER RESIDNCE

2 1883

CORRIDOR

2 0873

CORRIDOR

2 0843

CORRIDOR

2 0833

2 3093

2 3153

2 0533

2 0543

2 0553

2 0563

CORRIDOR

2 0883

CORRIDOR

2 0903

CORRIDOR

2 0823

TRIAGECHAIRS

2 0043

SCRUB AREA

2 3183

2 3203

LOCKERS

2 3213

EQUIPMENTSTORAGE

2 0633

NURSEPORTER

2 3223CRASH CART

2 3233

IMAV

23

NURSESTATION

2 0573

MED AREA

2 0023

TRIAGEWKSTN

2 0033

TRIAGECHAIRS

2 0053

TRIAGECHAIRS

2 0063

ELECTRICAL

2 0913

LAN

2 0923

CORRIDOR

2 0893

CORRIDOR

2 1963

CORRIDOR

2 1943

CORRIDOR

2 1953

CORRIDO

2 1973

KITCHEN

2 1853

H.K.

2 1183

WR

2 0813

EDUCATOROFFICE

2 2043

STRETCHER

2 0073STRETCHER

2 0083STRETCHER

2 0093

CARE BY PARENT

2 1793

CARE BYPARENT

2 1803

WR

2 1823

WR

2 1813

CLEAN UT

2 1703

WR

2 0103

PARENT AREA

2 1833

WRB-F

2 1843

CORRIDOR

2 1933

2 0313

2 0133

STAFFWC

2 0963

MONITORING ARCHIVE

2 0773

CONFERENCE

2 1663

PHYSICIANAREA

2 1033

STORE BASSINET

2 1723

2 1283

2 12332 1243

CORRIDOR

2 1983

LAN

2 2013ELEC

2 2023

WR

2 1783

HANDWASH

2 1253

WKSTN

2 1263

MONITORING ARCHIVE

2 0773

OFFICENURSE EDUCATOR

2 2003

ISOLATION

2 1653

2 1133

ANTE ROOM

2 1143

WAITING

2 1733

VISIW

2 13

HANDWASH

2 1963

C-SECTION OR

2 0433

ANAESTHETIC SUPPORT RM

2 0463

CLEANSUPPLY

2 0943

C-SECTION OR

2 0443

SCRUBAREA

2 0933

HOUSEKEEPING

2 0953

SCRUB

2 3243

VEST

2 0023

WC

3546

EL-2-A

EL-2-B

ST-2-B

DN

DN

DN

DN

DN

DN

DN

DN DN

DN

N

ABC

KEY PLAN

FG

H

Checked by:Project No.:

Drawing Title:

© Cannon Design 2013

© C

anno

n D

esig

n 20

13A

ll rig

hts

rese

rved

. No

part

of th

is d

ocum

ent m

aybe

repr

oduc

ed o

r util

ized

in a

ny fo

rm, w

ithou

t prio

rw

ritte

n au

thor

izat

ion

by T

he C

anno

n C

orpo

ratio

n.

No. STAGE 3.2 COSTING SUBMISSION 06-28-2013

MMM Group LimitedMechanical and Electrical Engineering

100 Commerce Valley Drive W.Thornhill , ON L3T 0A1

905.882.1100

Halsall Associates Ltd.Structural Engineering

2300 Yonge Street, Suite 2300Toronto, Ontario M4P 1E4

416.487.5256

200 University Avenue, Suite 1200Toronto, Ontario M5H 3C6

T: 416.915.0121F: 416.915.0122

2200 Eglinton Ave WestMISSISSAUGA , ONTARIO

Drawings are not to be scaled.

Contractor must verify all dimensions on the job andreport any discrepancy to architects before proceedingwith the work

All drawings and specifications are the property of thearchitect and must be returned at the completion of thework

This drawing is not to be used for construction untilcountersigned.

Signature: Date:

Trillium Health Partners

020629.00 R.S.

Credit Valley HospitalPriority Areas

Redevelopment Project(Phase 3)

05/0

8/20

13 8

:55:

54

3.2.1.9.03.1

PHASING PLAN - LEVEL 3

2 DD Ministry Submission 3.2 forCosting Review

28.06.20133 DD Ministry Submission 3.2 09.08.2013

NOTES:

- ALL AREAS OUTSIDE AREA OF CONSTRUCTION TO BE MAINTAINED FULLY OPERATIONAL

- EXISTING AREAS SHOWN IN BLACK & WHITE

-COMPLETED & OCCUPIED NEW CONSTRUCTION SHOWN WITH COLOUR

-REFERENCE WORK SEQUENCING DIAGRAMS

AREA OF CONSTRUCTION

MAINTAIN ACCESS THROUGH CONSTRUCTION

L3-XX

1

STAGE 1

L2-5

L3-2

L3-1

TEMP.CRITICAL CARE

TEMP.BEDROOMS

x-122

x-123

3242

3249

3247

3245

3243wc115

wc116

wc117

wc118wc119

wc120

wc121

wc122

3252

3254

3256

3258

wc112 wc111

3225

wc110wc109wc108

x-121

322332213219

wc107

3217

wc113

3235

3238

wc114

3261

wc106

wc105

3262

3265

wc104wc103

3271

3273

3270

wc102

3279 3281

wc101 wc100

3283 3285

wc99

wc97

wc96

wc98

3289

3292

wc95

3212

3234

3201

3205

3204

wc86

3208

3200

3207

3206

3295wc85

3294

3269

3260

3179 3181 3183 3185

3173

wc241 wc240 wc239 wc238 3187

wc212 wc213

3170

3169

3189

3192

wc236

wc237

3165

wc214

wc215

3162

3171

3194

wc2353195

3105

3104

3103

3102

3101 3100

3106

3107

3108wc234

3115

3117 3119 3121 3123

31313133

3134

wc225

3135

3138

wc224

3141

3142

3143wc223

3145wc222

wc2213147

3149wc220

3152wc219

3154wc218

3156

3158wc216

wc217

3160

31513251

3125

R25

RJ

RH

RG

RF

RE

F

L

K

N1x N1 N2 N3

NFx

NG

NH

NJ

NK

NL

NLx

H

N25

9y 10 11 12 13 14 15 16 17 18 19 20

21

23 24 25 26 27

Ax

A

Dx

Ex

G

N25

25x

Fx

N25

AC

AB

AD

AE

D

E

N4 N4x

NT

NU

N5 N5x

N5y

N6 N7 N8

NS

NR

NQ

NP

NN

NM

NS

NR

NQ

NP

NN

NM

N17N17x

N17y

N18N19 N20

NT

NU

N9 N10 N11 N12N13 N14 N15 N16N16x

NF

N8NE

ND

NC

NB

NA

H

NF

NE

ND

NC

NB

NA

H

N20xN21N22 N23 N24N24N24

NG

NK

x-90

x-89

3302

3301

x-119

x-116

x-117

3403

3514

x-118

3448

3320

3310

3308

3306

33053304

x-242

3316

3321

3416

3570

3572

3573

Closet 6

35843585

3586358335823581

3576 3577

3587

x-225

3410 3408 34063401

3412

x-223

x-222

x-221 x-220 x-218x-219

3546

3547

3544

3542

3540

3537

3538

3539

3531

3518

3515

x-217

3513

3520

x-208 x-209 x-210 x-211 x-213

x-214

x-215

x-216

x-212

3324

3342

3326

3323

3321

3325 3341

33303338

3340

3345

3341

3339

3337

3336

33353333

3331

3329

3349

3334

3332

x-227

3424

3440

3438

3422

454325430543644344432443

3445 3449 34513443x-228

3439 3453

346134633459

34553457

3400x-2293402

x-224

x-226

x-230x-231

3542

wc-242

wc-243

wc-244 wc-246

sh

wc-248

wc-245

FHC

wc-247

pipes

ACT @ 2.7m

SH

FHC

x-206

x-205

3100CONFERENCE

ROOM

3101CRITICAL

3102OFFICE

3103OFFICE

3100NOURISHMENT

3105ENVIRONMENTAL

SERVICES

3106STAFFLOUNGE

3107SOILEDUTILITY

3108PATIENTROOM

3108PATIENTROOM

3112PATIENTROOM

3115PATIENTROOM

3117PATIENTROOM

3119PATIENTROOM

3121PATIENTROOM

3123PATIENT

3125PATIENTROOM

3131PATIENTROOM

3133PATIENTROOM

3134SHOWERROOM

3135PATIENTROOM

3138PATIENTROOM3141

SHOWERROOM

3142CLEANUTILITY

3143PATIENTROOM

3145PATIENTROOM

3147PATIENTROOM

3149PATIENTROOM

3160MEDICATION

ROOM

3158PATIENTROOM

3156PATIENTROOM

3154PATIENTROOM

3152PATIENTROOM

3151PATIENT &FAMILY

3162PATIENTROOM

3165PATIENTROOM

3169

ROOM

3170OFFICE

3171PATIENTROOM

3173PATIENTROOM

3179PATIENTROOM

3181PATIENTROOM

3183PATIENTROOM

3185PATIENTROOM

3189PATIENTROOM

3192PATIENTROOM

3195PATIENTROOM

3108a

3112a

3115a

a3213a1213a9113a7113

3125a3131a

3135a

3138a

3143a

3145a

3147a

3149a

3156a

3154a

3152a

3158a

3200OR

BOOKING

3206OFFICE

3207SOILEDHOLDING

3208PATIENTROOM

3205ENVIRO.SERVICES

3205NOURISHMENT

CENTRE

3201WAITINGAREA

3213CRITICALCARE

3213a

3213b

3217PATIENTROOM

3217a

3219PATIENTROOM

3219a

3221PATIENTROOM

3221a

3223PATIENTROOM

3223a

3235PATIENTROOM

3235a

3238PATIENTROOM

3238a

3242PATIENTROOM

3243PATIENTROOM

3245PATIENTROOM

3247PATIENTROOM

3249PATIENTROOM

3242PATIENTROOM

3258PATIENTROOM

3256PATIENTROOM

3254PATIENTROOM

3252aPATIENTROOM

3243a

3245a

3247a

3249a

3258a

3256a

3254a

3252a

3261STAFF

3262PATIENTROOM

3265PATIENTROOM

3270JIT

SUPPLES

3271PATIENTROOM

3273PATIENTROOM

3279PATIENTROOM

3281PATIENTROOM

3283PATIENTROOM

3285PATIENTROOM

3262a

3262a

326932713273

a5823a5823a3823a1823a9723

3289a

3289PATIENTROOM

3292PATIENTROOM

3292a

3294a

3295a

3294aPATIENT ROOM

3234

3225SATELLITE

CARDIAC CARE UNIT

3225a 3225b

X-231O.R.

RECEPTION

###OFFICE

3328

3345

3347

3330

3340

3338

33363334

3332

3331

3331a

3329

3325

3323

3323a 3321 3416FEMALELOCKERS

3412O.R.

RECEPTION

3412PACU

3436SOILEDUTILITY

3438NURSING STATION

(RECOVERY)

3440OFFICE

M NLK

333733353333

3326

3442REC. ISO.ROOM

3444STORAGE

3446STAFFLOUNGE

3448CLEANSUPPLY

3450ANAE.

WORK ROOM

3452EQUIP.STORAGE

3454DEPT. OF

ANAESTHESIA

3451OPERATING ROOM

#05

3449OPERATING ROOM

#04

3449OPERATING ROOM

#03

3447OPERATING ROOM

#2

3439OPERATING ROOM

#11

3453MAIN

CLEAN SUPPLY

3463OPERATING ROOM

#09

3463OPERATING ROOM

#08

3457OPERATING ROOM

#07

3455OPERATING ROOM

#06

###STERIL.RM.

3459INSTRU.CLEAN

3410SURGICAL

CARE CENTRE

3962OPERATING ROOM

#01

3406CARTROOM

3402ENDO MECH.

ROOM

3402EVS

3402ENDO MECH.

ROOM

CARTROOM

X-229STORAGE

3301OFFICE

3302LOCKERROOM

3303LOCKERROOM

3304W/R

3305ENV.SER.

3316O.R.

STORAGE

X-242

X-119

3310IP

LEARNING LAB

3308IP

LEARNING LAB

3306IP

LEARNING LAB

3320OFFICE

3547CONFERENCE

ROOM

3544SOILEDUTILITY

X-224

3539NOURISHMENT

ROOM

X-117CLEANSUPPLY

###ENV.SER.

3541W/R

3546CLEANSUPPLY

3542ELEC.

CLOSET #09

###ANTEROOM

3518OFFICE

3514SOILEDUTILITY

3515CLEANSUPPLY

X-217STAFFLOUNGE

X-118CLEANSUPPLY

X-212ANTEROOM

3513STAFF

3512ENV.SER.

3540CRITICAL CARE

B

3520CRITICAL CARE

A

1

2

3

13

14

15

16

3570W/R

3572PHYSICIAN

W/R

3573CLOSET #06

W/R

3581TREATMENTROOM

3582INTERVIEWROOM #01

3583INTERVIEWROOM #02

3584W/R

3585INTERVIEWROOM #03

3586INTERVIEWROOM #04

3587W/R

3587RECOVERY

20272018

20092000

2036

2009.8

993.7 1000.0 1010.0

166.34

174.34

178.1

FHC

SPRINK.

FHC

FHC

FHC

FHC

MED GAS

FHC

FHC

DAY SURGERY A

PACU H

BIRTHING SUITE

CCB CCA

PACU SURGICAL SUITES

67

101112

2

3

1

8

6 488

#18#17

#21

EXISTING PENTHOUS

EXISTING ROOF

EXISTING ELEC.RM. EXISTING

MECHANICALRM.

EXISTINGMECHANICAL

RM.

EXISTING ROOF

9101112

9101112

9101112

9101112

2

3

1

6 7

9 10

5

11 128

EXPANSION JOINT

EXISTING COURTYARDBELOW

#1

#3

#4

#5

#6

#7

3B CARDIO/MED3C

ACT

ACT

ACT

GYP CEILING, TERRAZZO FLOOR

ACT

ACT

ACT

ACT

ACTACT

ACT

ACT

ACT

ACT

ACT

GYP CEILING, TERRAZZO FLOOR

ACT

GYP

ACT

ACTACTACTACT

ACT

ACT

ACT

MTL PANEL

ACT

ACT

GYP

ACT

ACT

ACT

ACT ACT

ACT

ACT ACTACT ACT

ACT

ACT

ACT

ALUM CEILING

ACT

MTL PANEL

ALUM CEILING

ACTACT

ACTACT

ACTACT

ACTACT

ACTACT ACT

ACT

ACTACT

ACTACT

ACT ACT

ACTACT

Handwash

Handwash

DN

SS COUNTER SS COUNTER

skylight above

OR10

XXX

TWO-BED

1 0023

THREE-BED

1 0043

1 0053

1 0033

TWO

1 03

ONE-BED

1 1013

1 1023

1 1043

ONE-BEDBARRIER-FREE

1 1033

SOILEDWASH-UP/ UTILITY

1 2163

CLEANROOM

1 2173

CLEANROOM

1 2183 CYSTOSCOPY

1 2203

URODYNAMICS

1 2213

OPERATINGROOM A1

1 2223

OPERATINGROOM A2

1 2233

SCRUBAREA

1 2243

CORRIDOR

1 2253

CORRIDOR

1 2263

CLEAN UTILITYROOM

1 2193

CHANG

1

CHANGE

1 23

STORAGE RM

1 2043

W/C

1 2063

SOILEDHSE-KEE

1 2293

TRIAGE AND ASSESSMENTRECEPTION

2 0013

LBR/LBRP BEREAVEMENT C

2 0303

LBR/LBRP A

2 0123

LBR/LBRP A

2 0143

LBR/LBRP B

2 0163

LBR/LBRP A

2 0183

LBR/LBRP B

2 0203

LBR/LBRP A

2 0223

LBR

2

2 0153

2 0173

2 0193

2 0213

2 0233

2 0253

RECOVERYROOM

2 0513

OFFICE

2 0733

WR

2 0523

HK

2 0783

FEMALE CHANGE RM

2 0793

WR

2 0803

CLEANSUPPLY

2 0593

SOILED HOLDING

2 0603

OFFICE

2 0623

MONITORING ARCHIVE

2 0773

COMMUNICATIONCENTER

2 0653

WARMINGALCOVE

2 0683

STRTCHR AL

2 0583

REPORT/CONF

2 0723

CRCALC

23

SCRUB

2 0473

ALCOVE

2 0713

VISITOR WR B.F.

2 0743

FAMILY / PRE-OPWAITING

2 0763

EARLY LABOURFAMILY LOUNGE

2 0113

OFFICEON-CALL

2 0753

DISMANTLE& ASSEMBLY

2 1753

MOTHER RESIDNCE

2 1863

WR

2 1903

WR

2 1913

OR SUITE

2 3013

SHIELDED ORHDR

2 3143

CONTROL ROOM

2 3023

PLAN.WKRM

2 3033

CLEAN UTILITY

SOILED UTILITY

2 3063

EQUIP STORE

2 3073 RECOVERY BAYS

2 3083

PRE-OPHOLDING

2 3103

COUNSEL

2 3123 UNASS.

2 3133

CHNGE RM

2 3113

NRSHMNTCENTER

2 0643

SOILED

2 1713

RESPIRATORYTHERAPY

2 1763

MOTHER RESIDNCE

2 1873

MOTHERRESIDNCE

2 1893

MOTHER RESIDNCE

2 1883

CORRIDOR

2 0873

CORRIDOR

2 0843

CORRIDOR

2 0833

2 3093

2 3153

2 0533

2 0543

2 0553

2 0563

CORRIDOR

2 0883

CORRIDOR

2 0903

CORRIDOR

2 0823

TRIAGECHAIRS

2 0043

SCRUB AREA

2 3183

2 3203

LOCKERS

2 3213

EQUIPMENTSTORAGE

2 0633

NURSEPORTER

2 3223CRASH CART

2 3233

IMAV

23

NURSESTATION

2 0573

MED AREA

2 0023

TRIAGEWKSTN

2 0033

TRIAGECHAIRS

2 0053

TRIAGECHAIRS

2 0063

ELECTRICAL

2 0913

LAN

2 0923

CORRIDOR

2 0893

CORRIDOR

2 1963

CORRIDOR

2 1943

CORRIDOR

2 1953

CORRIDO

2 1973

KITCHEN

2 1853

H.K.

2 1183

WR

2 0813

EDUCATOROFFICE

2 2043

STRETCHER

2 0073STRETCHER

2 0083STRETCHER

2 0093

CARE BY PARENT

2 1793

CARE BYPARENT

2 1803

WR

2 1823

WR

2 1813

CLEAN UT

2 1703

WR

2 0103

PARENT AREA

2 1833

WRB-F

2 1843

CORRIDOR

2 1933

2 0313

2 0133

STAFFWC

2 0963

MONITORING ARCHIVE

2 0773

CONFERENCE

2 1663

PHYSICIANAREA

2 1033

STORE BASSINET

2 1723

2 1283

2 12332 1243

CORRIDOR

2 1983

LAN

2 2013ELEC

2 2023

WR

2 1783

HANDWASH

2 1253

WKSTN

2 1263

MONITORING ARCHIVE

2 0773

OFFICENURSE EDUCATOR

2 2003

ISOLATION

2 1653

2 1133

ANTE ROOM

2 1143

WAITING

2 1733

VISIW

2 13

HANDWASH

2 1963

C-SECTION OR

2 0433

ANAESTHETIC SUPPORT RM

2 0463

CLEANSUPPLY

2 0943

C-SECTION OR

2 0443

SCRUBAREA

2 0933

HOUSEKEEPING

2 0953

SCRUB

2 3243

VEST

2 0023

WC

3546

EL-2-A

EL-2-B

ST-2-B

DN

DN

DN

DN

DN

DN

DN

DN DN

DN

N

ABC

KEY PLAN

FG

H

Checked by:Project No.:

Drawing Title:

© Cannon Design 2013

© C

anno

n D

esig

n 20

13A

ll rig

hts

rese

rved

. No

part

of th

is d

ocum

ent m

aybe

repr

oduc

ed o

r util

ized

in a

ny fo

rm, w

ithou

t prio

rw

ritte

n au

thor

izat

ion

by T

he C

anno

n C

orpo

ratio

n.

No. STAGE 3.2 COSTING SUBMISSION 06-28-2013

MMM Group LimitedMechanical and Electrical Engineering

100 Commerce Valley Drive W.Thornhill , ON L3T 0A1

905.882.1100

Halsall Associates Ltd.Structural Engineering

2300 Yonge Street, Suite 2300Toronto, Ontario M4P 1E4

416.487.5256

200 University Avenue, Suite 1200Toronto, Ontario M5H 3C6

T: 416.915.0121F: 416.915.0122

2200 Eglinton Ave WestMISSISSAUGA , ONTARIO

Drawings are not to be scaled.

Contractor must verify all dimensions on the job andreport any discrepancy to architects before proceedingwith the work

All drawings and specifications are the property of thearchitect and must be returned at the completion of thework

This drawing is not to be used for construction untilcountersigned.

Signature: Date:

Trillium Health Partners

020629.00 R.S.

Credit Valley HospitalPriority Areas

Redevelopment Project(Phase 3)

05/0

8/20

13 8

:55:

54

3.2.1.9.03.3

PHASING PLAN - LEVEL 3

2 DD Ministry Submission 3.2 forCosting Review

28.06.20133 DD Ministry Submission 3.2 09.08.2013

NOTES:

- ALL AREAS OUTSIDE AREA OF CONSTRUCTION TO BE MAINTAINED FULLY OPERATIONAL

- EXISTING AREAS SHOWN IN BLACK & WHITE

-COMPLETED & OCCUPIED NEW CONSTRUCTION SHOWN WITH COLOUR

-REFERENCE WORK SEQUENCING DIAGRAMS

AREA OF CONSTRUCTION

MAINTAIN ACCESS THROUGH CONSTRUCTION

L3-XX

STAGE 3

L2-5

L3-4

x-122

x-123

3242

3249

3247

3245

3243wc115

wc116

wc117

wc118wc119

wc120

wc121

wc122

3252

3254

3256

3258

wc112 wc111

3225

wc110wc109wc108

x-121

322332213219

wc107

3217

wc113

3235

3238

wc114

3261

wc106

wc105

3262

3265

wc104wc103

3271

3273

3270

wc102

3279 3281

wc101 wc100

3283 3285

wc99

wc97

wc96

wc98

3289

3292

wc95

3212

3234

3201

3205

3204

wc86

3208

3200

3207

3206

3295wc85

3294

3269

3260

3179 3181 3183 3185

3173

wc241 wc240 wc239 wc238 3187

wc212 wc213

3170

3169

3189

3192

wc236

wc237

3165

wc214

wc215

3162

3171

3194

wc2353195

3105

3104

3103

3102

3101 3100

3106

3107

3108wc234

3115

3117 3119 3121 3123

31313133

3134

wc225

3135

3138

wc224

3141

3142

3143wc223

3145wc222

wc2213147

3149wc220

3152wc219

3154wc218

3156

3158wc216

wc217

3160

31513251

3125

R25

RJ

RH

RG

RF

RE

F

L

K

N1x N1 N2 N3

NFx

NG

NH

NJ

NK

NL

NLx

H

N25

9y 10 11 12 13 14 15 16 17 18 19 20

21

23 24 25 26 27

Ax

A

Dx

Ex

G

N25

25x

Fx

N25

AC

AB

AD

AE

D

E

N4 N4x

NT

NU

N5 N5x

N5y

N6 N7 N8

NS

NR

NQ

NP

NN

NM

NS

NR

NQ

NP

NN

NM

N17N17x

N17y

N18N19 N20

NT

NU

N9 N10 N11 N12N13 N14 N15 N16N16x

NF

N8NE

ND

NC

NB

NA

H

NF

NE

ND

NC

NB

NA

H

N20xN21N22 N23 N24N24N24

NG

NK

x-90

x-89

3302

3301

x-119

x-116

x-117

3403

3514

x-118

3448

3320

3310

3308

3306

33053304

x-242

3316

3321

3416

3570

3572

3573

Closet 6

35843585

3586358335823581

3576 3577

3587

x-225

3410 3408 34063401

3412

x-223

x-222

x-221 x-220 x-218x-219

3546

3547

3544

3542

3540

3537

3538

3539

3531

3518

3515

x-217

3513

3520

x-208 x-209 x-210 x-211 x-213

x-214

x-215

x-216

x-212

3324

3342

3326

3323

3321

3325 3341

33303338

3340

3345

3341

3339

3337

3336

33353333

3331

3329

3349

3334

3332

x-227

3424

3440

3438

3422

454325430543644344432443

3445 3449 34513443x-228

3439 3453

346134633459

34553457

3400x-2293402

x-224

x-226

x-230x-231

3542

wc-242

wc-243

wc-244 wc-246

sh

wc-248

wc-245

FHC

wc-247

pipes

ACT @ 2.7m

SH

FHC

x-206

x-205

3100CONFERENCE

ROOM

3101CRITICAL

3102OFFICE

3103OFFICE

3100NOURISHMENT

3105ENVIRONMENTAL

SERVICES

3106STAFFLOUNGE

3107SOILEDUTILITY

3108PATIENTROOM

3108PATIENTROOM

3112PATIENTROOM

3115PATIENTROOM

3117PATIENTROOM

3119PATIENTROOM

3121PATIENTROOM

3123PATIENT

3125PATIENTROOM

3131PATIENTROOM

3133PATIENTROOM

3134SHOWERROOM

3135PATIENTROOM

3138PATIENTROOM3141

SHOWERROOM

3142CLEANUTILITY

3143PATIENTROOM

3145PATIENTROOM

3147PATIENTROOM

3149PATIENTROOM

3160MEDICATION

ROOM

3158PATIENTROOM

3156PATIENTROOM

3154PATIENTROOM

3152PATIENTROOM

3151PATIENT &FAMILY

3162PATIENTROOM

3165PATIENTROOM

3169

ROOM

3170OFFICE

3171PATIENTROOM

3173PATIENTROOM

3179PATIENTROOM

3181PATIENTROOM

3183PATIENTROOM

3185PATIENTROOM

3189PATIENTROOM

3192PATIENTROOM

3195PATIENTROOM

3108a

3112a

3115a

a3213a1213a9113a7113

3125a3131a

3135a

3138a

3143a

3145a

3147a

3149a

3156a

3154a

3152a

3158a

3200OR

BOOKING

3206OFFICE

3207SOILEDHOLDING

3208PATIENTROOM

3205ENVIRO.SERVICES

3205NOURISHMENT

CENTRE

3201WAITINGAREA

3213CRITICALCARE

3213a

3213b

3217PATIENTROOM

3217a

3219PATIENTROOM

3219a

3221PATIENTROOM

3221a

3223PATIENTROOM

3223a

3235PATIENTROOM

3235a

3238PATIENTROOM

3238a

3242PATIENTROOM

3243PATIENTROOM

3245PATIENTROOM

3247PATIENTROOM

3249PATIENTROOM

3242PATIENTROOM

3258PATIENTROOM

3256PATIENTROOM

3254PATIENTROOM

3252aPATIENTROOM

3243a

3245a

3247a

3249a

3258a

3256a

3254a

3252a

3261STAFF

3262PATIENTROOM

3265PATIENTROOM

3270JIT

SUPPLES

3271PATIENTROOM

3273PATIENTROOM

3279PATIENTROOM

3281PATIENTROOM

3283PATIENTROOM

3285PATIENTROOM

3262a

3262a

326932713273

a5823a5823a3823a1823a9723

3289a

3289PATIENTROOM

3292PATIENTROOM

3292a

3294a

3295a

3294aPATIENT ROOM

3234

3225SATELLITE

CARDIAC CARE UNIT

3225a 3225b

X-231O.R.

RECEPTION

###OFFICE

3328

3345

3347

3330

3340

3338

33363334

3332

3331

3331a

3329

3325

3323

3323a 3321 3416FEMALELOCKERS

3412O.R.

RECEPTION

3412PACU

3436SOILEDUTILITY

3438NURSING STATION

(RECOVERY)

3440OFFICE

M NLK

333733353333

3326

3442REC. ISO.ROOM

3444STORAGE

3446STAFFLOUNGE

3448CLEANSUPPLY

3450ANAE.

WORK ROOM

3452EQUIP.STORAGE

3454DEPT. OF

ANAESTHESIA

3451OPERATING ROOM

#05

3449OPERATING ROOM

#04

3449OPERATING ROOM

#03

3447OPERATING ROOM

#2

3439OPERATING ROOM

#11

3453MAIN

CLEAN SUPPLY

3463OPERATING ROOM

#09

3463OPERATING ROOM

#08

3457OPERATING ROOM

#07

3455OPERATING ROOM

#06

###STERIL.RM.

3459INSTRU.CLEAN

3410SURGICAL

CARE CENTRE

3962OPERATING ROOM

#01

3406CARTROOM

3402ENDO MECH.

ROOM

3402EVS

3402ENDO MECH.

ROOM

CARTROOM

X-229STORAGE

3301OFFICE

3302LOCKERROOM

3303LOCKERROOM

3304W/R

3305ENV.SER.

3316O.R.

STORAGE

X-242

X-119

3310IP

LEARNING LAB

3308IP

LEARNING LAB

3306IP

LEARNING LAB

3320OFFICE

3547CONFERENCE

ROOM

3544SOILEDUTILITY

X-224

3539NOURISHMENT

ROOM

X-117CLEANSUPPLY

###ENV.SER.

3541W/R

3546CLEANSUPPLY

3542ELEC.

CLOSET #09

###ANTEROOM

3518OFFICE

3514SOILEDUTILITY

3515CLEANSUPPLY

X-217STAFFLOUNGE

X-118CLEANSUPPLY

X-212ANTEROOM

3513STAFF

3512ENV.SER.

3540CRITICAL CARE

B

3520CRITICAL CARE

A

1

2

3

13

14

15

16

3570W/R

3572PHYSICIAN

W/R

3573CLOSET #06

W/R

3581TREATMENTROOM

3582INTERVIEWROOM #01

3583INTERVIEWROOM #02

3584W/R

3585INTERVIEWROOM #03

3586INTERVIEWROOM #04

3587W/R

3587RECOVERY

20272018

20092000

2036

2009.8

993.7 1000.0 1010.0

166.34

174.34

178.1

FHC

SPRINK.

FHC

FHC

FHC

FHC

MED GAS

FHC

FHC

DAY SURGERY A

PACU H

BIRTHING SUITE

CCB CCA

PACU SURGICAL SUITES

67

101112

2

3

1

8

6 488

#18#17

#21

EXISTING PENTHOUS

EXISTING ROOF

EXISTING ELEC.RM. EXISTING

MECHANICALRM.

EXISTINGMECHANICAL

RM.

EXISTING ROOF

9101112

9101112

9101112

9101112

2

3

1

6 7

9 10

5

11 128

EXPANSION JOINT

EXISTING COURTYARDBELOW

#1

#3

#4

#5

#6

#7

3B CARDIO/MED3C

ACT

ACT

ACT

GYP CEILING, TERRAZZO FLOOR

ACT

ACT

ACT

ACT

ACTACT

ACT

ACT

ACT

ACT

ACT

GYP CEILING, TERRAZZO FLOOR

ACT

GYP

ACT

ACTACTACTACT

ACT

ACT

ACT

MTL PANEL

ACT

ACT

GYP

ACT

ACT

ACT

ACT ACT

ACT

ACT ACTACT ACT

ACT

ACT

ACT

ALUM CEILING

ACT

MTL PANEL

ALUM CEILING

ACTACT

ACTACT

ACTACT

ACTACT

ACTACT ACT

ACT

ACTACT

ACTACT

ACT ACT

ACTACT

Handwash

Handwash

DN

SS COUNTER SS COUNTER

skylight above

OR10

XXX

TWO-BED

1 0023

THREE-BED

1 0043

1 0053

1 0033

TWO

1 03

ONE-BED

1 1013

1 1023

1 1043

ONE-BEDBARRIER-FREE

1 1033

SOILEDWASH-UP/ UTILITY

1 2163

CLEANROOM

1 2173

CLEANROOM

1 2183 CYSTOSCOPY

1 2203

URODYNAMICS

1 2213

OPERATINGROOM A1

1 2223

OPERATINGROOM A2

1 2233

SCRUBAREA

1 2243

CORRIDOR

1 2253

CORRIDOR

1 2263

CLEAN UTILITYROOM

1 2193

CHANG

1

CHANGE

1 23

STORAGE RM

1 2043

W/C

1 2063

SOILEDHSE-KEE

1 2293

TRIAGE AND ASSESSMENTRECEPTION

2 0013

LBR/LBRP BEREAVEMENT C

2 0303

LBR/LBRP A

2 0123

LBR/LBRP A

2 0143

LBR/LBRP B

2 0163

LBR/LBRP A

2 0183

LBR/LBRP B

2 0203

LBR/LBRP A

2 0223

LBR

2

2 0153

2 0173

2 0193

2 0213

2 0233

2 0253

RECOVERYROOM

2 0513

OFFICE

2 0733

WR

2 0523

HK

2 0783

FEMALE CHANGE RM

2 0793

WR

2 0803

CLEANSUPPLY

2 0593

SOILED HOLDING

2 0603

OFFICE

2 0623

MONITORING ARCHIVE

2 0773

COMMUNICATIONCENTER

2 0653

WARMINGALCOVE

2 0683

STRTCHR AL

2 0583

REPORT/CONF

2 0723

CRCALC

23

SCRUB

2 0473

ALCOVE

2 0713

VISITOR WR B.F.

2 0743

FAMILY / PRE-OPWAITING

2 0763

EARLY LABOURFAMILY LOUNGE

2 0113

OFFICEON-CALL

2 0753

DISMANTLE& ASSEMBLY

2 1753

MOTHER RESIDNCE

2 1863

WR

2 1903

WR

2 1913

OR SUITE

2 3013

SHIELDED ORHDR

2 3143

CONTROL ROOM

2 3023

PLAN.WKRM

2 3033

CLEAN UTILITY

SOILED UTILITY

2 3063

EQUIP STORE

2 3073 RECOVERY BAYS

2 3083

PRE-OPHOLDING

2 3103

COUNSEL

2 3123 UNASS.

2 3133

CHNGE RM

2 3113

NRSHMNTCENTER

2 0643

SOILED

2 1713

RESPIRATORYTHERAPY

2 1763

MOTHER RESIDNCE

2 1873

MOTHERRESIDNCE

2 1893

MOTHER RESIDNCE

2 1883

CORRIDOR

2 0873

CORRIDOR

2 0843

CORRIDOR

2 0833

2 3093

2 3153

2 0533

2 0543

2 0553

2 0563

CORRIDOR

2 0883

CORRIDOR

2 0903

CORRIDOR

2 0823

TRIAGECHAIRS

2 0043

SCRUB AREA

2 3183

2 3203

LOCKERS

2 3213

EQUIPMENTSTORAGE

2 0633

NURSEPORTER

2 3223CRASH CART

2 3233

IMAV

23

NURSESTATION

2 0573

MED AREA

2 0023

TRIAGEWKSTN

2 0033

TRIAGECHAIRS

2 0053

TRIAGECHAIRS

2 0063

ELECTRICAL

2 0913

LAN

2 0923

CORRIDOR

2 0893

CORRIDOR

2 1963

CORRIDOR

2 1943

CORRIDOR

2 1953

CORRIDO

2 1973

KITCHEN

2 1853

H.K.

2 1183

WR

2 0813

EDUCATOROFFICE

2 2043

STRETCHER

2 0073STRETCHER

2 0083STRETCHER

2 0093

CARE BY PARENT

2 1793

CARE BYPARENT

2 1803

WR

2 1823

WR

2 1813

CLEAN UT

2 1703

WR

2 0103

PARENT AREA

2 1833

WRB-F

2 1843

CORRIDOR

2 1933

2 0313

2 0133

STAFFWC

2 0963

MONITORING ARCHIVE

2 0773

CONFERENCE

2 1663

PHYSICIANAREA

2 1033

STORE BASSINET

2 1723

2 1283

2 12332 1243

CORRIDOR

2 1983

LAN

2 2013ELEC

2 2023

WR

2 1783

HANDWASH

2 1253

WKSTN

2 1263

MONITORING ARCHIVE

2 0773

OFFICENURSE EDUCATOR

2 2003

ISOLATION

2 1653

2 1133

ANTE ROOM

2 1143

WAITING

2 1733

VISIW

2 13

HANDWASH

2 1963

C-SECTION OR

2 0433

ANAESTHETIC SUPPORT RM

2 0463

CLEANSUPPLY

2 0943

C-SECTION OR

2 0443

SCRUBAREA

2 0933

HOUSEKEEPING

2 0953

SCRUB

2 3243

VEST

2 0023

WC

3546

EL-2-A

EL-2-B

ST-2-B

DN

DN

DN

DN

DN

DN

DN

DN DN

DN

N

ABC

KEY PLAN

FG

H

Checked by:Project No.:

Drawing Title:

© Cannon Design 2013

© C

anno

n D

esig

n 20

13A

ll rig

hts

rese

rved

. No

part

of th

is d

ocum

ent m

aybe

repr

oduc

ed o

r util

ized

in a

ny fo

rm, w

ithou

t prio

rw

ritte

n au

thor

izat

ion

by T

he C

anno

n C

orpo

ratio

n.

No. STAGE 3.2 COSTING SUBMISSION 06-28-2013

MMM Group LimitedMechanical and Electrical Engineering

100 Commerce Valley Drive W.Thornhill , ON L3T 0A1

905.882.1100

Halsall Associates Ltd.Structural Engineering

2300 Yonge Street, Suite 2300Toronto, Ontario M4P 1E4

416.487.5256

200 University Avenue, Suite 1200Toronto, Ontario M5H 3C6

T: 416.915.0121F: 416.915.0122

2200 Eglinton Ave WestMISSISSAUGA , ONTARIO

Drawings are not to be scaled.

Contractor must verify all dimensions on the job andreport any discrepancy to architects before proceedingwith the work

All drawings and specifications are the property of thearchitect and must be returned at the completion of thework

This drawing is not to be used for construction untilcountersigned.

Signature: Date:

Trillium Health Partners

020629.00 R.S.

Credit Valley HospitalPriority Areas

Redevelopment Project(Phase 3)

05/0

8/20

13 8

:55:

54

3.2.1.9.03.4

PHASING PLAN - LEVEL 3

2 DD Ministry Submission 3.2 forCosting Review

28.06.20133 DD Ministry Submission 3.2 09.08.2013

NOTES:

- ALL AREAS OUTSIDE AREA OF CONSTRUCTION TO BE MAINTAINED FULLY OPERATIONAL

- EXISTING AREAS SHOWN IN BLACK & WHITE

-COMPLETED & OCCUPIED NEW CONSTRUCTION SHOWN WITH COLOUR

-REFERENCE WORK SEQUENCING DIAGRAMS

AREA OF CONSTRUCTION

MAINTAIN ACCESS THROUGH CONSTRUCTION

L3-XX

STAGE 4

L3-5

TEMP. RECOVERY(NO WORK REQUIRED)

x-122

x-123

3242

3249

3247

3245

3243wc115

wc116

wc117

wc118wc119

wc120

wc121

wc122

3252

3254

3256

3258

wc112 wc111

3225

wc110wc109wc108

x-121

322332213219

wc107

3217

wc113

3235

3238

wc114

3261

wc106

wc105

3262

3265

wc104wc103

3271

3273

3270

wc102

3279 3281

wc101 wc100

3283 3285

wc99

wc97

wc96

wc98

3289

3292

wc95

3212

3234

3201

3205

3204

wc86

3208

3200

3207

3206

3295wc85

3294

3269

3260

3179 3181 3183 3185

3173

wc241 wc240 wc239 wc238 3187

wc212 wc213

3170

3169

3189

3192

wc236

wc237

3165

wc214

wc215

3162

3171

3194

wc2353195

3105

3104

3103

3102

3101 3100

3106

3107

3108wc234

3115

3117 3119 3121 3123

31313133

3134

wc225

3135

3138

wc224

3141

3142

3143wc223

3145wc222

wc2213147

3149wc220

3152wc219

3154wc218

3156

3158wc216

wc217

3160

31513251

3125

R25

RJ

RH

RG

RF

RE

F

L

K

N1x N1 N2 N3

NFx

NG

NH

NJ

NK

NL

NLx

H

N25

9y 10 11 12 13 14 15 16 17 18 19 20

21

23 24 25 26 27

Ax

A

Dx

Ex

G

N25

25x

Fx

N25

AC

AB

AD

AE

D

E

N4 N4x

NT

NU

N5 N5x

N5y

N6 N7 N8

NS

NR

NQ

NP

NN

NM

NS

NR

NQ

NP

NN

NM

N17N17x

N17y

N18N19 N20

NT

NU

N9 N10 N11 N12N13 N14 N15 N16N16x

NF

N8NE

ND

NC

NB

NA

H

NF

NE

ND

NC

NB

NA

H

N20xN21N22 N23 N24N24N24

NG

NK

x-90

x-89

3302

3301

x-119

x-116

x-117

3403

3514

x-118

3448

3320

3310

3308

3306

33053304

x-242

3316

3321

3416

3570

3572

3573

Closet 6

35843585

3586358335823581

3576 3577

3587

x-225

3410 3408 34063401

3412

x-223

x-222

x-221 x-220 x-218x-219

3546

3547

3544

3542

3540

3537

3538

3539

3531

3518

3515

x-217

3513

3520

x-208 x-209 x-210 x-211 x-213

x-214

x-215

x-216

x-212

3324

3342

3326

3323

3321

3325 3341

33303338

3340

3345

3341

3339

3337

3336

33353333

3331

3329

3349

3334

3332

x-227

3424

3440

3438

3422

454325430543644344432443

3445 3449 34513443x-228

3439 3453

346134633459

34553457

3400x-2293402

x-224

x-226

x-230x-231

3542

wc-242

wc-243

wc-244 wc-246

sh

wc-248

wc-245

FHC

wc-247

pipes

ACT @ 2.7m

SH

FHC

x-206

x-205

3100CONFERENCE

ROOM

3101CRITICAL

3102OFFICE

3103OFFICE

3100NOURISHMENT

3105ENVIRONMENTAL

SERVICES

3106STAFFLOUNGE

3107SOILEDUTILITY

3108PATIENTROOM

3108PATIENTROOM

3112PATIENTROOM

3115PATIENTROOM

3117PATIENTROOM

3119PATIENTROOM

3121PATIENTROOM

3123PATIENT

3125PATIENTROOM

3131PATIENTROOM

3133PATIENTROOM

3134SHOWERROOM

3135PATIENTROOM

3138PATIENTROOM3141

SHOWERROOM

3142CLEANUTILITY

3143PATIENTROOM

3145PATIENTROOM

3147PATIENTROOM

3149PATIENTROOM

3160MEDICATION

ROOM

3158PATIENTROOM

3156PATIENTROOM

3154PATIENTROOM

3152PATIENTROOM

3151PATIENT &FAMILY

3162PATIENTROOM

3165PATIENTROOM

3169

ROOM

3170OFFICE

3171PATIENTROOM

3173PATIENTROOM

3179PATIENTROOM

3181PATIENTROOM

3183PATIENTROOM

3185PATIENTROOM

3189PATIENTROOM

3192PATIENTROOM

3195PATIENTROOM

3108a

3112a

3115a

a3213a1213a9113a7113

3125a3131a

3135a

3138a

3143a

3145a

3147a

3149a

3156a

3154a

3152a

3158a

3200OR

BOOKING

3206OFFICE

3207SOILEDHOLDING

3208PATIENTROOM

3205ENVIRO.SERVICES

3205NOURISHMENT

CENTRE

3201WAITINGAREA

3213CRITICALCARE

3213a

3213b

3217PATIENTROOM

3217a

3219PATIENTROOM

3219a

3221PATIENTROOM

3221a

3223PATIENTROOM

3223a

3235PATIENTROOM

3235a

3238PATIENTROOM

3238a

3242PATIENTROOM

3243PATIENTROOM

3245PATIENTROOM

3247PATIENTROOM

3249PATIENTROOM

3242PATIENTROOM

3258PATIENTROOM

3256PATIENTROOM

3254PATIENTROOM

3252aPATIENTROOM

3243a

3245a

3247a

3249a

3258a

3256a

3254a

3252a

3261STAFF

3262PATIENTROOM

3265PATIENTROOM

3270JIT

SUPPLES

3271PATIENTROOM

3273PATIENTROOM

3279PATIENTROOM

3281PATIENTROOM

3283PATIENTROOM

3285PATIENTROOM

3262a

3262a

326932713273

a5823a5823a3823a1823a9723

3289a

3289PATIENTROOM

3292PATIENTROOM

3292a

3294a

3295a

3294aPATIENT ROOM

3234

3225SATELLITE

CARDIAC CARE UNIT

3225a 3225b

X-231O.R.

RECEPTION

###OFFICE

3328

3345

3347

3330

3340

3338

33363334

3332

3331

3331a

3329

3325

3323

3323a 3321 3416FEMALELOCKERS

3412O.R.

RECEPTION

3412PACU

3436SOILEDUTILITY

3438NURSING STATION

(RECOVERY)

3440OFFICE

M NLK

333733353333

3326

3442REC. ISO.ROOM

3444STORAGE

3446STAFFLOUNGE

3448CLEANSUPPLY

3450ANAE.

WORK ROOM

3452EQUIP.STORAGE

3454DEPT. OF

ANAESTHESIA

3451OPERATING ROOM

#05

3449OPERATING ROOM

#04

3449OPERATING ROOM

#03

3447OPERATING ROOM

#2

3439OPERATING ROOM

#11

3453MAIN

CLEAN SUPPLY

3463OPERATING ROOM

#09

3463OPERATING ROOM

#08

3457OPERATING ROOM

#07

3455OPERATING ROOM

#06

###STERIL.RM.

3459INSTRU.CLEAN

3410SURGICAL

CARE CENTRE

3962OPERATING ROOM

#01

3406CARTROOM

3402ENDO MECH.

ROOM

3402EVS

3402ENDO MECH.

ROOM

CARTROOM

X-229STORAGE

3301OFFICE

3302LOCKERROOM

3303LOCKERROOM

3304W/R

3305ENV.SER.

3316O.R.

STORAGE

X-242

X-119

3310IP

LEARNING LAB

3308IP

LEARNING LAB

3306IP

LEARNING LAB

3320OFFICE

3547CONFERENCE

ROOM

3544SOILEDUTILITY

X-224

3539NOURISHMENT

ROOM

X-117CLEANSUPPLY

###ENV.SER.

3541W/R

3546CLEANSUPPLY

3542ELEC.

CLOSET #09

###ANTEROOM

3518OFFICE

3514SOILEDUTILITY

3515CLEANSUPPLY

X-217STAFFLOUNGE

X-118CLEANSUPPLY

X-212ANTEROOM

3513STAFF

3512ENV.SER.

3540CRITICAL CARE

B

3520CRITICAL CARE

A

1

2

3

13

14

15

16

3570W/R

3572PHYSICIAN

W/R

3573CLOSET #06

W/R

3581TREATMENTROOM

3582INTERVIEWROOM #01

3583INTERVIEWROOM #02

3584W/R

3585INTERVIEWROOM #03

3586INTERVIEWROOM #04

3587W/R

3587RECOVERY

20272018

20092000

2036

2009.8

993.7 1000.0 1010.0

166.34

174.34

178.1

FHC

SPRINK.

FHC

FHC

FHC

FHC

MED GAS

FHC

FHC

DAY SURGERY A

PACU H

BIRTHING SUITE

CCB CCA

PACU SURGICAL SUITES

67

101112

2

3

1

8

6 488

#18#17

#21

EXISTING PENTHOUS

EXISTING ROOF

EXISTING ELEC.RM. EXISTING

MECHANICALRM.

EXISTINGMECHANICAL

RM.

EXISTING ROOF

9101112

9101112

9101112

9101112

2

3

1

6 7

9 10

5

11 128

EXPANSION JOINT

EXISTING COURTYARDBELOW

#1

#3

#4

#5

#6

#7

3B CARDIO/MED3C

ACT

ACT

ACT

GYP CEILING, TERRAZZO FLOOR

ACT

ACT

ACT

ACT

ACTACT

ACT

ACT

ACT

ACT

ACT

GYP CEILING, TERRAZZO FLOOR

ACT

GYP

ACT

ACTACTACTACT

ACT

ACT

ACT

MTL PANEL

ACT

ACT

GYP

ACT

ACT

ACT

ACT ACT

ACT

ACT ACTACT ACT

ACT

ACT

ACT

ALUM CEILING

ACT

MTL PANEL

ALUM CEILING

ACTACT

ACTACT

ACTACT

ACTACT

ACTACT ACT

ACT

ACTACT

ACTACT

ACT ACT

ACTACT

Handwash

Handwash

DN

SS COUNTER SS COUNTER

skylight above

OR10

XXX

TWO-BED

1 0023

THREE-BED

1 0043

1 0053

1 0033

TWO

1 03

ONE-BED

1 1013

1 1023

1 1043

ONE-BEDBARRIER-FREE

1 1033

SOILEDWASH-UP/ UTILITY

1 2163

CLEANROOM

1 2173

CLEANROOM

1 2183 CYSTOSCOPY

1 2203

URODYNAMICS

1 2213

OPERATINGROOM A1

1 2223

OPERATINGROOM A2

1 2233

SCRUBAREA

1 2243

CORRIDOR

1 2253

CORRIDOR

1 2263

CLEAN UTILITYROOM

1 2193

CHANG

1

CHANGE

1 23

STORAGE RM

1 2043

W/C

1 2063

SOILEDHSE-KEE

1 2293

TRIAGE AND ASSESSMENTRECEPTION

2 0013

LBR/LBRP BEREAVEMENT C

2 0303

LBR/LBRP A

2 0123

LBR/LBRP A

2 0143

LBR/LBRP B

2 0163

LBR/LBRP A

2 0183

LBR/LBRP B

2 0203

LBR/LBRP A

2 0223

LBR

2

2 0153

2 0173

2 0193

2 0213

2 0233

2 0253

RECOVERYROOM

2 0513

OFFICE

2 0733

WR

2 0523

HK

2 0783

FEMALE CHANGE RM

2 0793

WR

2 0803

CLEANSUPPLY

2 0593

SOILED HOLDING

2 0603

OFFICE

2 0623

MONITORING ARCHIVE

2 0773

COMMUNICATIONCENTER

2 0653

WARMINGALCOVE

2 0683

STRTCHR AL

2 0583

REPORT/CONF

2 0723

CRCALC

23

SCRUB

2 0473

ALCOVE

2 0713

VISITOR WR B.F.

2 0743

FAMILY / PRE-OPWAITING

2 0763

EARLY LABOURFAMILY LOUNGE

2 0113

OFFICEON-CALL

2 0753

DISMANTLE& ASSEMBLY

2 1753

MOTHER RESIDNCE

2 1863

WR

2 1903

WR

2 1913

OR SUITE

2 3013

SHIELDED ORHDR

2 3143

CONTROL ROOM

2 3023

PLAN.WKRM

2 3033

CLEAN UTILITY

SOILED UTILITY

2 3063

EQUIP STORE

2 3073 RECOVERY BAYS

2 3083

PRE-OPHOLDING

2 3103

COUNSEL

2 3123 UNASS.

2 3133

CHNGE RM

2 3113

NRSHMNTCENTER

2 0643

SOILED

2 1713

RESPIRATORYTHERAPY

2 1763

MOTHER RESIDNCE

2 1873

MOTHERRESIDNCE

2 1893

MOTHER RESIDNCE

2 1883

CORRIDOR

2 0873

CORRIDOR

2 0843

CORRIDOR

2 0833

2 3093

2 3153

2 0533

2 0543

2 0553

2 0563

CORRIDOR

2 0883

CORRIDOR

2 0903

CORRIDOR

2 0823

TRIAGECHAIRS

2 0043

SCRUB AREA

2 3183

2 3203

LOCKERS

2 3213

EQUIPMENTSTORAGE

2 0633

NURSEPORTER

2 3223CRASH CART

2 3233

IMAV

23

NURSESTATION

2 0573

MED AREA

2 0023

TRIAGEWKSTN

2 0033

TRIAGECHAIRS

2 0053

TRIAGECHAIRS

2 0063

ELECTRICAL

2 0913

LAN

2 0923

CORRIDOR

2 0893

CORRIDOR

2 1963

CORRIDOR

2 1943

CORRIDOR

2 1953

CORRIDO

2 1973

KITCHEN

2 1853

H.K.

2 1183

WR

2 0813

EDUCATOROFFICE

2 2043

STRETCHER

2 0073STRETCHER

2 0083STRETCHER

2 0093

CARE BY PARENT

2 1793

CARE BYPARENT

2 1803

WR

2 1823

WR

2 1813

CLEAN UT

2 1703

WR

2 0103

PARENT AREA

2 1833

WRB-F

2 1843

CORRIDOR

2 1933

2 0313

2 0133

STAFFWC

2 0963

MONITORING ARCHIVE

2 0773

CONFERENCE

2 1663

PHYSICIANAREA

2 1033

STORE BASSINET

2 1723

2 1283

2 12332 1243

CORRIDOR

2 1983

LAN

2 2013ELEC

2 2023

WR

2 1783

HANDWASH

2 1253

WKSTN

2 1263

MONITORING ARCHIVE

2 0773

OFFICENURSE EDUCATOR

2 2003

ISOLATION

2 1653

2 1133

ANTE ROOM

2 1143

WAITING

2 1733

VISIW

2 13

HANDWASH

2 1963

C-SECTION OR

2 0433

ANAESTHETIC SUPPORT RM

2 0463

CLEANSUPPLY

2 0943

C-SECTION OR

2 0443

SCRUBAREA

2 0933

HOUSEKEEPING

2 0953

SCRUB

2 3243

VEST

2 0023

WC

3546

EL-2-A

EL-2-B

ST-2-B

DN

DN

DN

DN

DN

DN

DN

DN DN

DN

N

ABC

KEY PLAN

FG

H

Checked by:Project No.:

Drawing Title:

© Cannon Design 2013

© C

anno

n D

esig

n 20

13A

ll rig

hts

rese

rved

. No

part

of th

is d

ocum

ent m

aybe

repr

oduc

ed o

r util

ized

in a

ny fo

rm, w

ithou

t prio

rw

ritte

n au

thor

izat

ion

by T

he C

anno

n C

orpo

ratio

n.

No. STAGE 3.2 COSTING SUBMISSION 06-28-2013

MMM Group LimitedMechanical and Electrical Engineering

100 Commerce Valley Drive W.Thornhill , ON L3T 0A1

905.882.1100

Halsall Associates Ltd.Structural Engineering

2300 Yonge Street, Suite 2300Toronto, Ontario M4P 1E4

416.487.5256

200 University Avenue, Suite 1200Toronto, Ontario M5H 3C6

T: 416.915.0121F: 416.915.0122

2200 Eglinton Ave WestMISSISSAUGA , ONTARIO

Drawings are not to be scaled.

Contractor must verify all dimensions on the job andreport any discrepancy to architects before proceedingwith the work

All drawings and specifications are the property of thearchitect and must be returned at the completion of thework

This drawing is not to be used for construction untilcountersigned.

Signature: Date:

Trillium Health Partners

020629.00 R.S.

Credit Valley HospitalPriority Areas

Redevelopment Project(Phase 3)

05/0

8/20

13 8

:55:

54

3.2.1.9.03.7

PHASING PLAN - LEVEL 3

2 DD Ministry Submission 3.2 forCosting Review

28.06.20133 DD Ministry Submission 3.2 09.08.2013

NOTES:

- ALL AREAS OUTSIDE AREA OF CONSTRUCTION TO BE MAINTAINED FULLY OPERATIONAL

- EXISTING AREAS SHOWN IN BLACK & WHITE

-COMPLETED & OCCUPIED NEW CONSTRUCTION SHOWN WITH COLOUR

-REFERENCE WORK SEQUENCING DIAGRAMS

AREA OF CONSTRUCTION

MAINTAIN ACCESS THROUGH CONSTRUCTION

L3-XX

STAGE 7

L3-8

x-122

x-123

3242

3249

3247

3245

3243wc115

wc116

wc117

wc118wc119

wc120

wc121

wc122

3252

3254

3256

3258

wc112 wc111

3225

wc110wc109wc108

x-121

322332213219

wc107

3217

wc113

3235

3238

wc114

3261

wc106

wc105

3262

3265

wc104wc103

3271

3273

3270

wc102

3279 3281

wc101 wc100

3283 3285

wc99

wc97

wc96

wc98

3289

3292

wc95

3212

3234

3201

3205

3204

wc86

3208

3200

3207

3206

3295wc85

3294

3269

3260

3179 3181 3183 3185

3173

wc241 wc240 wc239 wc238 3187

wc212 wc213

3170

3169

3189

3192

wc236

wc237

3165

wc214

wc215

3162

3171

3194

wc2353195

3105

3104

3103

3102

3101 3100

3106

3107

3108wc234

3115

3117 3119 3121 3123

31313133

3134

wc225

3135

3138

wc224

3141

3142

3143wc223

3145wc222

wc2213147

3149wc220

3152wc219

3154wc218

3156

3158wc216

wc217

3160

31513251

3125

R25

RJ

RH

RG

RF

RE

F

L

K

N1x N1 N2 N3

NFx

NG

NH

NJ

NK

NL

NLx

H

N25

9y 10 11 12 13 14 15 16 17 18 19 20

21

23 24 25 26 27

Ax

A

Dx

Ex

G

N25

25x

Fx

N25

AC

AB

AD

AE

D

E

N4 N4x

NT

NU

N5 N5x

N5y

N6 N7 N8

NS

NR

NQ

NP

NN

NM

NS

NR

NQ

NP

NN

NM

N17N17x

N17y

N18N19 N20

NT

NU

N9 N10 N11 N12N13 N14 N15 N16N16x

NF

N8NE

ND

NC

NB

NA

H

NF

NE

ND

NC

NB

NA

H

N20xN21N22 N23 N24N24N24

NG

NK

x-90

x-89

3302

3301

x-119

x-116

x-117

3403

3514

x-118

3448

3320

3310

3308

3306

33053304

x-242

3316

3321

3416

3570

3572

3573

Closet 6

35843585

3586358335823581

3576 3577

3587

x-225

3410 3408 34063401

3412

x-223

x-222

x-221 x-220 x-218x-219

3546

3547

3544

3542

3540

3537

3538

3539

3531

3518

3515

x-217

3513

3520

x-208 x-209 x-210 x-211 x-213

x-214

x-215

x-216

x-212

3324

3342

3326

3323

3321

3325 3341

33303338

3340

3345

3341

3339

3337

3336

33353333

3331

3329

3349

3334

3332

x-227

3424

3440

3438

3422

454325430543644344432443

3445 3449 34513443x-228

3439 3453

346134633459

34553457

3400x-2293402

x-224

x-226

x-230x-231

3542

wc-242

wc-243

wc-244 wc-246

sh

wc-248

wc-245

FHC

wc-247

pipes

ACT @ 2.7m

SH

FHC

x-206

x-205

3100CONFERENCE

ROOM

3101CRITICAL

3102OFFICE

3103OFFICE

3100NOURISHMENT

3105ENVIRONMENTAL

SERVICES

3106STAFFLOUNGE

3107SOILEDUTILITY

3108PATIENTROOM

3108PATIENTROOM

3112PATIENTROOM

3115PATIENTROOM

3117PATIENTROOM

3119PATIENTROOM

3121PATIENTROOM

3123PATIENT

3125PATIENTROOM

3131PATIENTROOM

3133PATIENTROOM

3134SHOWERROOM

3135PATIENTROOM

3138PATIENTROOM3141

SHOWERROOM

3142CLEANUTILITY

3143PATIENTROOM

3145PATIENTROOM

3147PATIENTROOM

3149PATIENTROOM

3160MEDICATION

ROOM

3158PATIENTROOM

3156PATIENTROOM

3154PATIENTROOM

3152PATIENTROOM

3151PATIENT &FAMILY

3162PATIENTROOM

3165PATIENTROOM

3169

ROOM

3170OFFICE

3171PATIENTROOM

3173PATIENTROOM

3179PATIENTROOM

3181PATIENTROOM

3183PATIENTROOM

3185PATIENTROOM

3189PATIENTROOM

3192PATIENTROOM

3195PATIENTROOM

3108a

3112a

3115a

a3213a1213a9113a7113

3125a3131a

3135a

3138a

3143a

3145a

3147a

3149a

3156a

3154a

3152a

3158a

3200OR

BOOKING

3206OFFICE

3207SOILEDHOLDING

3208PATIENTROOM

3205ENVIRO.SERVICES

3205NOURISHMENT

CENTRE

3201WAITINGAREA

3213CRITICALCARE

3213a

3213b

3217PATIENTROOM

3217a

3219PATIENTROOM

3219a

3221PATIENTROOM

3221a

3223PATIENTROOM

3223a

3235PATIENTROOM

3235a

3238PATIENTROOM

3238a

3242PATIENTROOM

3243PATIENTROOM

3245PATIENTROOM

3247PATIENTROOM

3249PATIENTROOM

3242PATIENTROOM

3258PATIENTROOM

3256PATIENTROOM

3254PATIENTROOM

3252aPATIENTROOM

3243a

3245a

3247a

3249a

3258a

3256a

3254a

3252a

3261STAFF

3262PATIENTROOM

3265PATIENTROOM

3270JIT

SUPPLES

3271PATIENTROOM

3273PATIENTROOM

3279PATIENTROOM

3281PATIENTROOM

3283PATIENTROOM

3285PATIENTROOM

3262a

3262a

326932713273

a5823a5823a3823a1823a9723

3289a

3289PATIENTROOM

3292PATIENTROOM

3292a

3294a

3295a

3294aPATIENT ROOM

3234

3225SATELLITE

CARDIAC CARE UNIT

3225a 3225b

X-231O.R.

RECEPTION

###OFFICE

3328

3345

3347

3330

3340

3338

33363334

3332

3331

3331a

3329

3325

3323

3323a 3321 3416FEMALELOCKERS

3412O.R.

RECEPTION

3412PACU

3436SOILEDUTILITY

3438NURSING STATION

(RECOVERY)

3440OFFICE

M NLK

333733353333

3326

3442REC. ISO.ROOM

3444STORAGE

3446STAFFLOUNGE

3448CLEANSUPPLY

3450ANAE.

WORK ROOM

3452EQUIP.STORAGE

3454DEPT. OF

ANAESTHESIA

3451OPERATING ROOM

#05

3449OPERATING ROOM

#04

3449OPERATING ROOM

#03

3447OPERATING ROOM

#2

3439OPERATING ROOM

#11

3453MAIN

CLEAN SUPPLY

3463OPERATING ROOM

#09

3463OPERATING ROOM

#08

3457OPERATING ROOM

#07

3455OPERATING ROOM

#06

###STERIL.RM.

3459INSTRU.CLEAN

3410SURGICAL

CARE CENTRE

3962OPERATING ROOM

#01

3406CARTROOM

3402ENDO MECH.

ROOM

3402EVS

3402ENDO MECH.

ROOM

CARTROOM

X-229STORAGE

3301OFFICE

3302LOCKERROOM

3303LOCKERROOM

3304W/R

3305ENV.SER.

3316O.R.

STORAGE

X-242

X-119

3310IP

LEARNING LAB

3308IP

LEARNING LAB

3306IP

LEARNING LAB

3320OFFICE

3547CONFERENCE

ROOM

3544SOILEDUTILITY

X-224

3539NOURISHMENT

ROOM

X-117CLEANSUPPLY

###ENV.SER.

3541W/R

3546CLEANSUPPLY

3542ELEC.

CLOSET #09

###ANTEROOM

3518OFFICE

3514SOILEDUTILITY

3515CLEANSUPPLY

X-217STAFFLOUNGE

X-118CLEANSUPPLY

X-212ANTEROOM

3513STAFF

3512ENV.SER.

3540CRITICAL CARE

B

3520CRITICAL CARE

A

1

2

3

13

14

15

16

3570W/R

3572PHYSICIAN

W/R

3573CLOSET #06

W/R

3581TREATMENTROOM

3582INTERVIEWROOM #01

3583INTERVIEWROOM #02

3584W/R

3585INTERVIEWROOM #03

3586INTERVIEWROOM #04

3587W/R

3587RECOVERY

20272018

20092000

2036

2009.8

993.7 1000.0 1010.0

166.34

174.34

178.1

FHC

SPRINK.

FHC

FHC

FHC

FHC

MED GAS

FHC

FHC

DAY SURGERY A

PACU H

BIRTHING SUITE

CCB CCA

PACU SURGICAL SUITES

67

101112

2

3

1

8

6 488

#18#17

#21

EXISTING PENTHOUS

EXISTING ROOF

EXISTING ELEC.RM. EXISTING

MECHANICALRM.

EXISTINGMECHANICAL

RM.

EXISTING ROOF

9101112

9101112

9101112

9101112

2

3

1

6 7

9 10

5

11 128

EXPANSION JOINT

EXISTING COURTYARDBELOW

#1

#3

#4

#5

#6

#7

3B CARDIO/MED3C

ACT

ACT

ACT

GYP CEILING, TERRAZZO FLOOR

ACT

ACT

ACT

ACT

ACTACT

ACT

ACT

ACT

ACT

ACT

GYP CEILING, TERRAZZO FLOOR

ACT

GYP

ACT

ACTACTACTACT

ACT

ACT

ACT

MTL PANEL

ACT

ACT

GYP

ACT

ACT

ACT

ACT ACT

ACT

ACT ACTACT ACT

ACT

ACT

ACT

ALUM CEILING

ACT

MTL PANEL

ALUM CEILING

ACTACT

ACTACT

ACTACT

ACTACT

ACTACT ACT

ACT

ACTACT

ACTACT

ACT ACT

ACTACT

Handwash

Handwash

DN

SS COUNTER SS COUNTER

skylight above

OR10

XXX

TWO-BED

1 0023

THREE-BED

1 0043

1 0053

1 0033

TWO

1 03

ONE-BED

1 1013

1 1023

1 1043

ONE-BEDBARRIER-FREE

1 1033

SOILEDWASH-UP/ UTILITY

1 2163

CLEANROOM

1 2173

CLEANROOM

1 2183 CYSTOSCOPY

1 2203

URODYNAMICS

1 2213

OPERATINGROOM A1

1 2223

OPERATINGROOM A2

1 2233

SCRUBAREA

1 2243

CORRIDOR

1 2253

CORRIDOR

1 2263

CLEAN UTILITYROOM

1 2193

CHANG

1

CHANGE

1 23

STORAGE RM

1 2043

W/C

1 2063

SOILEDHSE-KEE

1 2293

TRIAGE AND ASSESSMENTRECEPTION

2 0013

LBR/LBRP BEREAVEMENT C

2 0303

LBR/LBRP A

2 0123

LBR/LBRP A

2 0143

LBR/LBRP B

2 0163

LBR/LBRP A

2 0183

LBR/LBRP B

2 0203

LBR/LBRP A

2 0223

LBR

2

2 0153

2 0173

2 0193

2 0213

2 0233

2 0253

RECOVERYROOM

2 0513

OFFICE

2 0733

WR

2 0523

HK

2 0783

FEMALE CHANGE RM

2 0793

WR

2 0803

CLEANSUPPLY

2 0593

SOILED HOLDING

2 0603

OFFICE

2 0623

MONITORING ARCHIVE

2 0773

COMMUNICATIONCENTER

2 0653

WARMINGALCOVE

2 0683

STRTCHR AL

2 0583

REPORT/CONF

2 0723

CRCALC

23

SCRUB

2 0473

ALCOVE

2 0713

VISITOR WR B.F.

2 0743

FAMILY / PRE-OPWAITING

2 0763

EARLY LABOURFAMILY LOUNGE

2 0113

OFFICEON-CALL

2 0753

DISMANTLE& ASSEMBLY

2 1753

MOTHER RESIDNCE

2 1863

WR

2 1903

WR

2 1913

OR SUITE

2 3013

SHIELDED ORHDR

2 3143

CONTROL ROOM

2 3023

PLAN.WKRM

2 3033

CLEAN UTILITY

SOILED UTILITY

2 3063

EQUIP STORE

2 3073 RECOVERY BAYS

2 3083

PRE-OPHOLDING

2 3103

COUNSEL

2 3123 UNASS.

2 3133

CHNGE RM

2 3113

NRSHMNTCENTER

2 0643

SOILED

2 1713

RESPIRATORYTHERAPY

2 1763

MOTHER RESIDNCE

2 1873

MOTHERRESIDNCE

2 1893

MOTHER RESIDNCE

2 1883

CORRIDOR

2 0873

CORRIDOR

2 0843

CORRIDOR

2 0833

2 3093

2 3153

2 0533

2 0543

2 0553

2 0563

CORRIDOR

2 0883

CORRIDOR

2 0903

CORRIDOR

2 0823

TRIAGECHAIRS

2 0043

SCRUB AREA

2 3183

2 3203

LOCKERS

2 3213

EQUIPMENTSTORAGE

2 0633

NURSEPORTER

2 3223CRASH CART

2 3233

IMAV

23

NURSESTATION

2 0573

MED AREA

2 0023

TRIAGEWKSTN

2 0033

TRIAGECHAIRS

2 0053

TRIAGECHAIRS

2 0063

ELECTRICAL

2 0913

LAN

2 0923

CORRIDOR

2 0893

CORRIDOR

2 1963

CORRIDOR

2 1943

CORRIDOR

2 1953

CORRIDO

2 1973

KITCHEN

2 1853

H.K.

2 1183

WR

2 0813

EDUCATOROFFICE

2 2043

STRETCHER

2 0073STRETCHER

2 0083STRETCHER

2 0093

CARE BY PARENT

2 1793

CARE BYPARENT

2 1803

WR

2 1823

WR

2 1813

CLEAN UT

2 1703

WR

2 0103

PARENT AREA

2 1833

WRB-F

2 1843

CORRIDOR

2 1933

2 0313

2 0133

STAFFWC

2 0963

MONITORING ARCHIVE

2 0773

CONFERENCE

2 1663

PHYSICIANAREA

2 1033

STORE BASSINET

2 1723

2 1283

2 12332 1243

CORRIDOR

2 1983

LAN

2 2013ELEC

2 2023

WR

2 1783

HANDWASH

2 1253

WKSTN

2 1263

MONITORING ARCHIVE

2 0773

OFFICENURSE EDUCATOR

2 2003

ISOLATION

2 1653

2 1133

ANTE ROOM

2 1143

WAITING

2 1733

VISIW

2 13

HANDWASH

2 1963

C-SECTION OR

2 0433

ANAESTHETIC SUPPORT RM

2 0463

CLEANSUPPLY

2 0943

C-SECTION OR

2 0443

SCRUBAREA

2 0933

HOUSEKEEPING

2 0953

SCRUB

2 3243

VEST

2 0023

WC

3546

EL-2-A

EL-2-B

ST-2-B

DN

DN

DN

DN

DN

DN

DN

DN DN

DN

N

ABC

KEY PLAN

FG

H

Checked by:Project No.:

Drawing Title:

© Cannon Design 2013

© C

anno

n D

esig

n 20

13A

ll rig

hts

rese

rved

. No

part

of th

is d

ocum

ent m

aybe

repr

oduc

ed o

r util

ized

in a

ny fo

rm, w

ithou

t prio

rw

ritte

n au

thor

izat

ion

by T

he C

anno

n C

orpo

ratio

n.

No. STAGE 3.2 COSTING SUBMISSION 06-28-2013

MMM Group LimitedMechanical and Electrical Engineering

100 Commerce Valley Drive W.Thornhill , ON L3T 0A1

905.882.1100

Halsall Associates Ltd.Structural Engineering

2300 Yonge Street, Suite 2300Toronto, Ontario M4P 1E4

416.487.5256

200 University Avenue, Suite 1200Toronto, Ontario M5H 3C6

T: 416.915.0121F: 416.915.0122

2200 Eglinton Ave WestMISSISSAUGA , ONTARIO

Drawings are not to be scaled.

Contractor must verify all dimensions on the job andreport any discrepancy to architects before proceedingwith the work

All drawings and specifications are the property of thearchitect and must be returned at the completion of thework

This drawing is not to be used for construction untilcountersigned.

Signature: Date:

Trillium Health Partners

020629.00 R.S.

Credit Valley HospitalPriority Areas

Redevelopment Project(Phase 3)

05/0

8/20

13 8

:55:

54

3.2.1.9.03.1

PHASING PLAN - LEVEL 3

2 DD Ministry Submission 3.2 forCosting Review

28.06.20133 DD Ministry Submission 3.2 09.08.2013

NOTES:

- ALL AREAS OUTSIDE AREA OF CONSTRUCTION TO BE MAINTAINED FULLY OPERATIONAL

- EXISTING AREAS SHOWN IN BLACK & WHITE

-COMPLETED & OCCUPIED NEW CONSTRUCTION SHOWN WITH COLOUR

-REFERENCE WORK SEQUENCING DIAGRAMS

AREA OF CONSTRUCTION

MAINTAIN ACCESS THROUGH CONSTRUCTION

L3-XX

2

STAGE 2

L2-5

L3-3

TEMP.CRITICAL CARE

TEMP.BEDROOMS

x-122

x-123

3242

3249

3247

3245

3243wc115

wc116

wc117

wc118wc119

wc120

wc121

wc122

3252

3254

3256

3258

wc112 wc111

3225

wc110wc109wc108

x-121

322332213219

wc107

3217

wc113

3235

3238

wc114

3261

wc106

wc105

3262

3265

wc104wc103

3271

3273

3270

wc102

3279 3281

wc101 wc100

3283 3285

wc99

wc97

wc96

wc98

3289

3292

wc95

3212

3234

3201

3205

3204

wc86

3208

3200

3207

3206

3295wc85

3294

3269

3260

3179 3181 3183 3185

3173

wc241 wc240 wc239 wc238 3187

wc212 wc213

3170

3169

3189

3192

wc236

wc237

3165

wc214

wc215

3162

3171

3194

wc2353195

3105

3104

3103

3102

3101 3100

3106

3107

3108wc234

3115

3117 3119 3121 3123

31313133

3134

wc225

3135

3138

wc224

3141

3142

3143wc223

3145wc222

wc2213147

3149wc220

3152wc219

3154wc218

3156

3158wc216

wc217

3160

31513251

3125

R25

RJ

RH

RG

RF

RE

F

L

K

N1x N1 N2 N3

NFx

NG

NH

NJ

NK

NL

NLx

H

N25

9y 10 11 12 13 14 15 16 17 18 19 20

21

23 24 25 26 27

Ax

A

Dx

Ex

G

N25

25x

Fx

N25

AC

AB

AD

AE

D

E

N4 N4x

NT

NU

N5 N5x

N5y

N6 N7 N8

NS

NR

NQ

NP

NN

NM

NS

NR

NQ

NP

NN

NM

N17N17x

N17y

N18N19 N20

NT

NU

N9 N10 N11 N12N13 N14 N15 N16N16x

NF

N8NE

ND

NC

NB

NA

H

NF

NE

ND

NC

NB

NA

H

N20xN21N22 N23 N24N24N24

NG

NK

x-90

x-89

3302

3301

x-119

x-116

x-117

3403

3514

x-118

3448

3320

3310

3308

3306

33053304

x-242

3316

3321

3416

3570

3572

3573

Closet 6

35843585

3586358335823581

3576 3577

3587

x-225

3410 3408 34063401

3412

x-223

x-222

x-221 x-220 x-218x-219

3546

3547

3544

3542

3540

3537

3538

3539

3531

3518

3515

x-217

3513

3520

x-208 x-209 x-210 x-211 x-213

x-214

x-215

x-216

x-212

3324

3342

3326

3323

3321

3325 3341

33303338

3340

3345

3341

3339

3337

3336

33353333

3331

3329

3349

3334

3332

x-227

3424

3440

3438

3422

454325430543644344432443

3445 3449 34513443x-228

3439 3453

346134633459

34553457

3400x-2293402

x-224

x-226

x-230x-231

3542

wc-242

wc-243

wc-244 wc-246

sh

wc-248

wc-245

FHC

wc-247

pipes

ACT @ 2.7m

SH

FHC

x-206

x-205

3100CONFERENCE

ROOM

3101CRITICAL

3102OFFICE

3103OFFICE

3100NOURISHMENT

3105ENVIRONMENTAL

SERVICES

3106STAFFLOUNGE

3107SOILEDUTILITY

3108PATIENTROOM

3108PATIENTROOM

3112PATIENTROOM

3115PATIENTROOM

3117PATIENTROOM

3119PATIENTROOM

3121PATIENTROOM

3123PATIENT

3125PATIENTROOM

3131PATIENTROOM

3133PATIENTROOM

3134SHOWERROOM

3135PATIENTROOM

3138PATIENTROOM3141

SHOWERROOM

3142CLEANUTILITY

3143PATIENTROOM

3145PATIENTROOM

3147PATIENTROOM

3149PATIENTROOM

3160MEDICATION

ROOM

3158PATIENTROOM

3156PATIENTROOM

3154PATIENTROOM

3152PATIENTROOM

3151PATIENT &FAMILY

3162PATIENTROOM

3165PATIENTROOM

3169

ROOM

3170OFFICE

3171PATIENTROOM

3173PATIENTROOM

3179PATIENTROOM

3181PATIENTROOM

3183PATIENTROOM

3185PATIENTROOM

3189PATIENTROOM

3192PATIENTROOM

3195PATIENTROOM

3108a

3112a

3115a

a3213a1213a9113a7113

3125a3131a

3135a

3138a

3143a

3145a

3147a

3149a

3156a

3154a

3152a

3158a

3200OR

BOOKING

3206OFFICE

3207SOILEDHOLDING

3208PATIENTROOM

3205ENVIRO.SERVICES

3205NOURISHMENT

CENTRE

3201WAITINGAREA

3213CRITICALCARE

3213a

3213b

3217PATIENTROOM

3217a

3219PATIENTROOM

3219a

3221PATIENTROOM

3221a

3223PATIENTROOM

3223a

3235PATIENTROOM

3235a

3238PATIENTROOM

3238a

3242PATIENTROOM

3243PATIENTROOM

3245PATIENTROOM

3247PATIENTROOM

3249PATIENTROOM

3242PATIENTROOM

3258PATIENTROOM

3256PATIENTROOM

3254PATIENTROOM

3252aPATIENTROOM

3243a

3245a

3247a

3249a

3258a

3256a

3254a

3252a

3261STAFF

3262PATIENTROOM

3265PATIENTROOM

3270JIT

SUPPLES

3271PATIENTROOM

3273PATIENTROOM

3279PATIENTROOM

3281PATIENTROOM

3283PATIENTROOM

3285PATIENTROOM

3262a

3262a

326932713273

a5823a5823a3823a1823a9723

3289a

3289PATIENTROOM

3292PATIENTROOM

3292a

3294a

3295a

3294aPATIENT ROOM

3234

3225SATELLITE

CARDIAC CARE UNIT

3225a 3225b

X-231O.R.

RECEPTION

###OFFICE

3328

3345

3347

3330

3340

3338

33363334

3332

3331

3331a

3329

3325

3323

3323a 3321 3416FEMALELOCKERS

3412O.R.

RECEPTION

3412PACU

3436SOILEDUTILITY

3438NURSING STATION

(RECOVERY)

3440OFFICE

M NLK

333733353333

3326

3442REC. ISO.ROOM

3444STORAGE

3446STAFFLOUNGE

3448CLEANSUPPLY

3450ANAE.

WORK ROOM

3452EQUIP.STORAGE

3454DEPT. OF

ANAESTHESIA

3451OPERATING ROOM

#05

3449OPERATING ROOM

#04

3449OPERATING ROOM

#03

3447OPERATING ROOM

#2

3439OPERATING ROOM

#11

3453MAIN

CLEAN SUPPLY

3463OPERATING ROOM

#09

3463OPERATING ROOM

#08

3457OPERATING ROOM

#07

3455OPERATING ROOM

#06

###STERIL.RM.

3459INSTRU.CLEAN

3410SURGICAL

CARE CENTRE

3962OPERATING ROOM

#01

3406CARTROOM

3402ENDO MECH.

ROOM

3402EVS

3402ENDO MECH.

ROOM

CARTROOM

X-229STORAGE

3301OFFICE

3302LOCKERROOM

3303LOCKERROOM

3304W/R

3305ENV.SER.

3316O.R.

STORAGE

X-242

X-119

3310IP

LEARNING LAB

3308IP

LEARNING LAB

3306IP

LEARNING LAB

3320OFFICE

3547CONFERENCE

ROOM

3544SOILEDUTILITY

X-224

3539NOURISHMENT

ROOM

X-117CLEANSUPPLY

###ENV.SER.

3541W/R

3546CLEANSUPPLY

3542ELEC.

CLOSET #09

###ANTEROOM

3518OFFICE

3514SOILEDUTILITY

3515CLEANSUPPLY

X-217STAFFLOUNGE

X-118CLEANSUPPLY

X-212ANTEROOM

3513STAFF

3512ENV.SER.

3540CRITICAL CARE

B

3520CRITICAL CARE

A

1

2

3

13

14

15

16

3570W/R

3572PHYSICIAN

W/R

3573CLOSET #06

W/R

3581TREATMENTROOM

3582INTERVIEWROOM #01

3583INTERVIEWROOM #02

3584W/R

3585INTERVIEWROOM #03

3586INTERVIEWROOM #04

3587W/R

3587RECOVERY

20272018

20092000

2036

2009.8

993.7 1000.0 1010.0

166.34

174.34

178.1

FHC

SPRINK.

FHC

FHC

FHC

FHC

MED GAS

FHC

FHC

DAY SURGERY A

PACU H

BIRTHING SUITE

CCB CCA

PACU SURGICAL SUITES

67

101112

2

3

1

8

6 488

#18#17

#21

EXISTING PENTHOUS

EXISTING ROOF

EXISTING ELEC.RM. EXISTING

MECHANICALRM.

EXISTINGMECHANICAL

RM.

EXISTING ROOF

9101112

9101112

9101112

9101112

2

3

1

6 7

9 10

5

11 128

EXPANSION JOINT

EXISTING COURTYARDBELOW

#1

#3

#4

#5

#6

#7

3B CARDIO/MED3C

ACT

ACT

ACT

GYP CEILING, TERRAZZO FLOOR

ACT

ACT

ACT

ACT

ACTACT

ACT

ACT

ACT

ACT

ACT

GYP CEILING, TERRAZZO FLOOR

ACT

GYP

ACT

ACTACTACTACT

ACT

ACT

ACT

MTL PANEL

ACT

ACT

GYP

ACT

ACT

ACT

ACT ACT

ACT

ACT ACTACT ACT

ACT

ACT

ACT

ALUM CEILING

ACT

MTL PANEL

ALUM CEILING

ACTACT

ACTACT

ACTACT

ACTACT

ACTACT ACT

ACT

ACTACT

ACTACT

ACT ACT

ACTACT

Handwash

Handwash

DN

SS COUNTER SS COUNTER

skylight above

OR10

XXX

TWO-BED

1 0023

THREE-BED

1 0043

1 0053

1 0033

TWO

1 03

ONE-BED

1 1013

1 1023

1 1043

ONE-BEDBARRIER-FREE

1 1033

SOILEDWASH-UP/ UTILITY

1 2163

CLEANROOM

1 2173

CLEANROOM

1 2183 CYSTOSCOPY

1 2203

URODYNAMICS

1 2213

OPERATINGROOM A1

1 2223

OPERATINGROOM A2

1 2233

SCRUBAREA

1 2243

CORRIDOR

1 2253

CORRIDOR

1 2263

CLEAN UTILITYROOM

1 2193

CHANG

1

CHANGE

1 23

STORAGE RM

1 2043

W/C

1 2063

SOILEDHSE-KEE

1 2293

TRIAGE AND ASSESSMENTRECEPTION

2 0013

LBR/LBRP BEREAVEMENT C

2 0303

LBR/LBRP A

2 0123

LBR/LBRP A

2 0143

LBR/LBRP B

2 0163

LBR/LBRP A

2 0183

LBR/LBRP B

2 0203

LBR/LBRP A

2 0223

LBR

2

2 0153

2 0173

2 0193

2 0213

2 0233

2 0253

RECOVERYROOM

2 0513

OFFICE

2 0733

WR

2 0523

HK

2 0783

FEMALE CHANGE RM

2 0793

WR

2 0803

CLEANSUPPLY

2 0593

SOILED HOLDING

2 0603

OFFICE

2 0623

MONITORING ARCHIVE

2 0773

COMMUNICATIONCENTER

2 0653

WARMINGALCOVE

2 0683

STRTCHR AL

2 0583

REPORT/CONF

2 0723

CRCALC

23

SCRUB

2 0473

ALCOVE

2 0713

VISITOR WR B.F.

2 0743

FAMILY / PRE-OPWAITING

2 0763

EARLY LABOURFAMILY LOUNGE

2 0113

OFFICEON-CALL

2 0753

DISMANTLE& ASSEMBLY

2 1753

MOTHER RESIDNCE

2 1863

WR

2 1903

WR

2 1913

OR SUITE

2 3013

SHIELDED ORHDR

2 3143

CONTROL ROOM

2 3023

PLAN.WKRM

2 3033

CLEAN UTILITY

SOILED UTILITY

2 3063

EQUIP STORE

2 3073 RECOVERY BAYS

2 3083

PRE-OPHOLDING

2 3103

COUNSEL

2 3123 UNASS.

2 3133

CHNGE RM

2 3113

NRSHMNTCENTER

2 0643

SOILED

2 1713

RESPIRATORYTHERAPY

2 1763

MOTHER RESIDNCE

2 1873

MOTHERRESIDNCE

2 1893

MOTHER RESIDNCE

2 1883

CORRIDOR

2 0873

CORRIDOR

2 0843

CORRIDOR

2 0833

2 3093

2 3153

2 0533

2 0543

2 0553

2 0563

CORRIDOR

2 0883

CORRIDOR

2 0903

CORRIDOR

2 0823

TRIAGECHAIRS

2 0043

SCRUB AREA

2 3183

2 3203

LOCKERS

2 3213

EQUIPMENTSTORAGE

2 0633

NURSEPORTER

2 3223CRASH CART

2 3233

IMAV

23

NURSESTATION

2 0573

MED AREA

2 0023

TRIAGEWKSTN

2 0033

TRIAGECHAIRS

2 0053

TRIAGECHAIRS

2 0063

ELECTRICAL

2 0913

LAN

2 0923

CORRIDOR

2 0893

CORRIDOR

2 1963

CORRIDOR

2 1943

CORRIDOR

2 1953

CORRIDO

2 1973

KITCHEN

2 1853

H.K.

2 1183

WR

2 0813

EDUCATOROFFICE

2 2043

STRETCHER

2 0073STRETCHER

2 0083STRETCHER

2 0093

CARE BY PARENT

2 1793

CARE BYPARENT

2 1803

WR

2 1823

WR

2 1813

CLEAN UT

2 1703

WR

2 0103

PARENT AREA

2 1833

WRB-F

2 1843

CORRIDOR

2 1933

2 0313

2 0133

STAFFWC

2 0963

MONITORING ARCHIVE

2 0773

CONFERENCE

2 1663

PHYSICIANAREA

2 1033

STORE BASSINET

2 1723

2 1283

2 12332 1243

CORRIDOR

2 1983

LAN

2 2013ELEC

2 2023

WR

2 1783

HANDWASH

2 1253

WKSTN

2 1263

MONITORING ARCHIVE

2 0773

OFFICENURSE EDUCATOR

2 2003

ISOLATION

2 1653

2 1133

ANTE ROOM

2 1143

WAITING

2 1733

VISIW

2 13

HANDWASH

2 1963

C-SECTION OR

2 0433

ANAESTHETIC SUPPORT RM

2 0463

CLEANSUPPLY

2 0943

C-SECTION OR

2 0443

SCRUBAREA

2 0933

HOUSEKEEPING

2 0953

SCRUB

2 3243

VEST

2 0023

WC

3546

EL-2-A

EL-2-B

ST-2-B

DN

DN

DN

DN

DN

DN

DN

DN DN

DN

N

ABC

KEY PLAN

FG

H

Checked by:Project No.:

Drawing Title:

© Cannon Design 2013

© C

anno

n D

esig

n 20

13A

ll rig

hts

rese

rved

. No

part

of th

is d

ocum

ent m

aybe

repr

oduc

ed o

r util

ized

in a

ny fo

rm, w

ithou

t prio

rw

ritte

n au

thor

izat

ion

by T

he C

anno

n C

orpo

ratio

n.

No. STAGE 3.2 COSTING SUBMISSION 06-28-2013

MMM Group LimitedMechanical and Electrical Engineering

100 Commerce Valley Drive W.Thornhill , ON L3T 0A1

905.882.1100

Halsall Associates Ltd.Structural Engineering

2300 Yonge Street, Suite 2300Toronto, Ontario M4P 1E4

416.487.5256

200 University Avenue, Suite 1200Toronto, Ontario M5H 3C6

T: 416.915.0121F: 416.915.0122

2200 Eglinton Ave WestMISSISSAUGA , ONTARIO

Drawings are not to be scaled.

Contractor must verify all dimensions on the job andreport any discrepancy to architects before proceedingwith the work

All drawings and specifications are the property of thearchitect and must be returned at the completion of thework

This drawing is not to be used for construction untilcountersigned.

Signature: Date:

Trillium Health Partners

020629.00 R.S.

Credit Valley HospitalPriority Areas

Redevelopment Project(Phase 3)

05/0

8/20

13 8

:55:

54

3.2.1.9.03.5

PHASING PLAN - LEVEL 3

2 DD Ministry Submission 3.2 forCosting Review

28.06.20133 DD Ministry Submission 3.2 09.08.2013

NOTES:

- ALL AREAS OUTSIDE AREA OF CONSTRUCTION TO BE MAINTAINED FULLY OPERATIONAL

- EXISTING AREAS SHOWN IN BLACK & WHITE

-COMPLETED & OCCUPIED NEW CONSTRUCTION SHOWN WITH COLOUR

-REFERENCE WORK SEQUENCING DIAGRAMS

AREA OF CONSTRUCTION

MAINTAIN ACCESS THROUGH CONSTRUCTION

L3-XX

STAGE 5

L3-6

N

ABC

KEY PLAN

FG

H

Checked by:Project No.:

Drawing Title:

© Cannon Design 2013

© C

anno

n D

esig

n 20

13A

ll rig

hts

rese

rved

. No

part

of th

is d

ocum

ent m

aybe

repr

oduc

ed o

r util

ized

in a

ny fo

rm, w

ithou

t prio

rw

ritte

n au

thor

izat

ion

by T

he C

anno

n C

orpo

ratio

n.

No. STAGE 3.2 COSTING SUBMISSION 06-28-2013

MMM Group LimitedMechanical and Electrical Engineering

100 Commerce Valley Drive W.Thornhill , ON L3T 0A1

905.882.1100

Halsall Associates Ltd.Structural Engineering

2300 Yonge Street, Suite 2300Toronto, Ontario M4P 1E4

416.487.5256

200 University Avenue, Suite 1200Toronto, Ontario M5H 3C6

T: 416.915.0121F: 416.915.0122

2200 Eglinton Ave WestMISSISSAUGA , ONTARIO

Drawings are not to be scaled.

Contractor must verify all dimensions on the job andreport any discrepancy to architects before proceedingwith the work

All drawings and specifications are the property of thearchitect and must be returned at the completion of thework

This drawing is not to be used for construction untilcountersigned.

Signature: Date:

Trillium Health Partners

020629.00 R.S.

Credit Valley HospitalPriority Areas

Redevelopment Project(Phase 3)

05/0

8/20

13 8

:36:

18

3.2.1.9.02.1

PHASING PLAN - LEVEL 2

2 DD Ministry Submission 3.2 forCosting Review

28.06.20133 DD Ministry Submission 3.2 09.08.2013

NOTES:

- ALL AREAS OUTSIDE AREA OF CONSTRUCTION TO BE MAINTAINED FULLY OPERATIONAL

- EXISTING AREAS SHOWN IN BLACK & WHITE

-COMPLETED & OCCUPIED NEW CONSTRUCTION SHOWN WITH COLOUR

-REFERENCE WORK SEQUENCING DIAGRAMS

AREA OF CONSTRUCTION

MAINTAIN ACCESS THROUGH CONSTRUCTION

L2-XX

STAGE 2

2

TEMP.AMBULANCE

GARAGE

TEMP.FAST TRACK

RETAILPHARMACY

INFO DESK

TEMP.MAIN

ENTRANCE

L2-5

L2-5

L2-6

L2-7

L2-8

N

ABC

KEY PLAN

FG

H

Checked by:Project No.:

Drawing Title:

© Cannon Design 2013

© C

anno

n D

esig

n 20

13A

ll rig

hts

rese

rved

. No

part

of th

is d

ocum

ent m

aybe

repr

oduc

ed o

r util

ized

in a

ny fo

rm, w

ithou

t prio

rw

ritte

n au

thor

izat

ion

by T

he C

anno

n C

orpo

ratio

n.

No. STAGE 3.2 COSTING SUBMISSION 06-28-2013

MMM Group LimitedMechanical and Electrical Engineering

100 Commerce Valley Drive W.Thornhill , ON L3T 0A1

905.882.1100

Halsall Associates Ltd.Structural Engineering

2300 Yonge Street, Suite 2300Toronto, Ontario M4P 1E4

416.487.5256

200 University Avenue, Suite 1200Toronto, Ontario M5H 3C6

T: 416.915.0121F: 416.915.0122

2200 Eglinton Ave WestMISSISSAUGA , ONTARIO

Drawings are not to be scaled.

Contractor must verify all dimensions on the job andreport any discrepancy to architects before proceedingwith the work

All drawings and specifications are the property of thearchitect and must be returned at the completion of thework

This drawing is not to be used for construction untilcountersigned.

Signature: Date:

Trillium Health Partners

020629.00 R.S.

Credit Valley HospitalPriority Areas

Redevelopment Project(Phase 3)

05/0

8/20

13 8

:36:

18

3.2.1.9.02.1

PHASING PLAN - LEVEL 2

2 DD Ministry Submission 3.2 forCosting Review

28.06.20133 DD Ministry Submission 3.2 09.08.2013

NOTES:

- ALL AREAS OUTSIDE AREA OF CONSTRUCTION TO BE MAINTAINED FULLY OPERATIONAL

- EXISTING AREAS SHOWN IN BLACK & WHITE

-COMPLETED & OCCUPIED NEW CONSTRUCTION SHOWN WITH COLOUR

-REFERENCE WORK SEQUENCING DIAGRAMS

AREA OF CONSTRUCTION

MAINTAIN ACCESS THROUGH CONSTRUCTION

L2-XX

STAGE 3

3

REMOVE TEMP.AMBULANCE

GARAGE

TEMP.FAST TRACK

RETAILPHARMACY

INFO DESK

TEMP.MAIN

ENTRANCE

L2-9

L2-9

L2-10

L2-11

N

ABC

KEY PLAN

FG

H

Checked by:Project No.:

Drawing Title:

© Cannon Design 2013

© C

anno

n D

esig

n 20

13A

ll rig

hts

rese

rved

. No

part

of th

is d

ocum

ent m

aybe

repr

oduc

ed o

r util

ized

in a

ny fo

rm, w

ithou

t prio

rw

ritte

n au

thor

izat

ion

by T

he C

anno

n C

orpo

ratio

n.

No. STAGE 3.2 COSTING SUBMISSION 06-28-2013

MMM Group LimitedMechanical and Electrical Engineering

100 Commerce Valley Drive W.Thornhill , ON L3T 0A1

905.882.1100

Halsall Associates Ltd.Structural Engineering

2300 Yonge Street, Suite 2300Toronto, Ontario M4P 1E4

416.487.5256

200 University Avenue, Suite 1200Toronto, Ontario M5H 3C6

T: 416.915.0121F: 416.915.0122

2200 Eglinton Ave WestMISSISSAUGA , ONTARIO

Drawings are not to be scaled.

Contractor must verify all dimensions on the job andreport any discrepancy to architects before proceedingwith the work

All drawings and specifications are the property of thearchitect and must be returned at the completion of thework

This drawing is not to be used for construction untilcountersigned.

Signature: Date:

Trillium Health Partners

020629.00 R.S.

Credit Valley HospitalPriority Areas

Redevelopment Project(Phase 3)

05/0

8/20

13 8

:36:

18

3.2.1.9.02.1

PHASING PLAN - LEVEL 2

2 DD Ministry Submission 3.2 forCosting Review

28.06.20133 DD Ministry Submission 3.2 09.08.2013

NOTES:

- ALL AREAS OUTSIDE AREA OF CONSTRUCTION TO BE MAINTAINED FULLY OPERATIONAL

- EXISTING AREAS SHOWN IN BLACK & WHITE

-COMPLETED & OCCUPIED NEW CONSTRUCTION SHOWN WITH COLOUR

-REFERENCE WORK SEQUENCING DIAGRAMS

AREA OF CONSTRUCTION

MAINTAIN ACCESS THROUGH CONSTRUCTION

L2-XX

STAGE 4

4

REMOVE TEMP.ENTRY

TEMP.FAST TRACK

RETAILPHARMACY

INFO DESK

L2-12

CANNON DESIGN

CREDIT VALLEY HOSPITAL PHASING PLANS

Page 28: ShengWu portfolio 2014

28

cs&PARchITEcTsY E A RLOCALET Y P E

B R I E F

R O L E

2B WORKTERM CO-OPSEPT - DEC. 2012TORONTO, CANADAEDUCATION/JUDICIAL/RECREATIONAL/TEMP. RESIDENTIAL

Worked in a fast-paced environment involved in multiple projects on various stages of developmemt. Projects worked on: University of Windsor, McMaster University, Cresent School, Nelson Mandela Park Public School, Sterling Hall School, Artisian Drive Public School Addition York Region Women’s Shelter, Regina Police Headquarters, Sarnia Cineplex, 101 Erskine Condo.

- Prepared working drawings in AutoCAD and Revit- Helped set Revit office standards for all subsequent projects- Prepared presentation material using Photoshop, Illustrator, Powerpoint, Indesign, Excel- Coordinate with consultants and external landscape designers - Conducted facade, solar + programmatic space studies using Google sketch-up- Drew column and wall details for cineplex cinema - Built physical programmatic area pieces of Regina Police Station for client meetings - Calculated area of exposed building face to comply with Ontario Building Code requirements- Responsible for the site plan approval set for a small school addition - Troubleshoot with contractors on CAD related issues- Issue addendum and various contract admin- Assist marketing department with int. and ext. office events - Became unofficial designer of all internal office posters

INTERNshIP

2

1

Page 29: ShengWu portfolio 2014

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY AN AU

TOD

ESK STUD

ENT PR

OD

UC

T

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY

AN A

UTO

DES

K ST

UD

ENT

PRO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY AN AU

TOD

ESK STUD

ENT PR

OD

UC

T

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY

AN A

UTO

DES

K ST

UD

ENT

PRO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY AN AU

TOD

ESK STUD

ENT PR

OD

UC

T

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY

AN A

UTO

DES

K ST

UD

ENT

PRO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY AN AU

TOD

ESK STUD

ENT PR

OD

UC

T

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY

AN A

UTO

DES

K ST

UD

ENT

PRO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY AN AU

TOD

ESK STUD

ENT PR

OD

UC

T

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY

AN A

UTO

DES

K ST

UD

ENT

PRO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY AN AU

TOD

ESK STUD

ENT PR

OD

UC

T

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY

AN A

UTO

DES

K ST

UD

ENT

PRO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY AN AU

TOD

ESK STUD

ENT PR

OD

UC

T

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY

AN A

UTO

DES

K ST

UD

ENT

PRO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY AN AU

TOD

ESK STUD

ENT PR

OD

UC

T

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY

AN A

UTO

DES

K ST

UD

ENT

PRO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY AN AU

TOD

ESK STUD

ENT PR

OD

UC

T

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY

AN A

UTO

DES

K ST

UD

ENT

PRO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY AN AU

TOD

ESK STUD

ENT PR

OD

UC

T

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY

AN A

UTO

DES

K ST

UD

ENT

PRO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY AN AU

TOD

ESK STUD

ENT PR

OD

UC

T

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY

AN A

UTO

DES

K ST

UD

ENT

PRO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY AN AU

TOD

ESK STUD

ENT PR

OD

UC

T

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRO

DU

CED

BY

AN A

UTO

DES

K ST

UD

ENT

PRO

DU

CT

CS&P ARchITEcTs

1. UNIVERSITY OF WINDOR ELEVATIONS REVIT+ ILLUSTRATOR

2. ARTISIAN PUBLIC SCHOOL ADDITIONAUTOCAD

3. SPECIALTY EQUIPMENT FAMILIESREVIT

3

Page 30: ShengWu portfolio 2014

30

PARKINARchITEcTsY E A RT E R MT Y P E

B R I E F

R O L E

TORONTO, CANADAJAN - APR. 2012 | MAY - AUG 20142A + 3B WORKTERM CO-OPP3 HEALTHCARE

Worked on schematic design for Milton Hospital and Joseph Brant Hospital P3 competition (2014)Worked on DD and CD for New Oakvile Hospital (2012)

- Designed Milton Hospital Main Entrance Lobby- Developed interior details and renders for public spaces (drawings confidential due to nature of competition)- Developed graphics, animation and drawing set for Day-in-the-Life experience- Attended user group meetings

RENDER PROVIDED BY DESIGNSTOR

INTERNshIP

Page 31: ShengWu portfolio 2014

FHC

FHC & DSCC

PTS

FHC

PPE

PPE

tag#tag#

tag#

PPE

SCOPECLEANER

SCOPECLEANER

1800

1565

∅2100

BIOLOGICALINDICATOR556x1024

BIOLOGICA

LIN

DICATO

R556x1024

B IOLOGICALINDICATOR556x1024

1545

1300

BENCH

1390

3 1 . 7 3

31.44

1 d a t a o ut l e t p e rse a t

( 8 - 1 0 p r o g r a m m e d )

S-8 UTILITY SINK

S-8 UTILITY SINK

S H O W E R

760

760

L SK

L DD

610 610 610 25

L DR L DRL D3

S-8 UTILITY SINK

S-8 UTILITY SINK

S-8 UTILITY SINK

XX-XX

XX-XX

ACCESS FROM BEHINDEQUIPMENT FO R SERVICE -ESSENTIAL RULE 6.5.1.1

9 1 5 m m

1220mm

1 2 2 0 m m1 2 2 0 m m

915mm

915mm

9 1 5 m m

9 1 5 m m

2x815mm

9 1 5 m mG L A S S 5 0 0 m m

F R A M E 6 0 0 m m

G L A S S 5 0 0 m m

F R A M E 6 0 0 m m

1220mm

915mm

915m

m

2x1070mm

2x1070mm

1220mm915m

m

1 2 2 0 m m

1 2 2 0 m m

915m

m

9 1 5 m m

ST O RA G ETO WE R

61 0 x6 1 0

FHC +DS CC

FHC

9 1 5 m m

S - 2 A

915m

m

915mm

TABLE,RAC

KING

STATION

3200x508

FRAME 1300mm

9 1 5 m m

915mm

I N T E G R A L S I N K

2x1070mm

2x1070mm

PTDWASTE

SD1

S-4

S - 1 7

W C - 3

W C - 3

GRB-2

G R B - 1

D E C O N T A M I N A T I O NS Y S T E M7 5 0 X 8 9 0

D E C O N T A M I N A T I O NS Y S T E M7 5 0 X 8 9 0

CLEAN

ER,ULTRASONIC

1524x635 C

LEANER,ULTRASO

NIC

1524x635

TABLE,W

ORK

2565x1118

WASH

ER/DISIN

FECTO

RAC

C.,RAC

KSTO

RAGEUNIT

3080x610

WASHER/DISINFECTO

RAC

C.,

TRAN

SFER

CART

759x730

WASHER/DISINFECTO

RAC

C.,

TRAN

SFER

CART

759x730

WASHER/DISINFECTO

RAC

C.,

TRAN

SFER

CART

759x730

WASHER/DISINFECTO

RAC

C.,

TRAN

SFER

CART

759x730

WASHER/DISINFECTO

RAC

C.,

TRAN

SFER

CART

759x730

WASHER/DISINFECTO

RAC

C.,

TRAN

SFER

CART

759x730

WASHER/DISINFECTO

RAC

C.,

TRAN

SFER

CART

759x730

WASHER/DISINFECTO

RAC

C.,

TRAN

SFER

CART

759x730

WASHER/DISINFECTO

RAC

C.,

TRAN

SFER

CART

759x730

WASHER/DISINFECTO

RAC

C.,

TRAN

SFER

CART

759x730

T A B L EP A C K I N G

1 8 5 4 x 1 1 4 3

T A B L EP A C K I N G

1 8 5 4 x 1 1 4 3

T A B L EP A C K I N G

1 8 5 4 x 1 1 4 3

T A B L EP A C K I N G

1 8 5 4 x 1 1 4 3

T A B L EP A C K I N G

1 8 5 4 x 1 1 4 3

T A B L EP A C K I N G

1 8 5 4 x 1 1 4 3

T A B L EP A C K I N G

1 8 5 4 x 1 1 4 3

T A B L EP A C K I N G

1 8 5 4 x 1 1 4 3

T A B L EP A C K I N G

1 8 5 4 x 1 1 4 3

HS 1

PTD 1

EW-1

PTD

WASTE

SD1

E W - 1

EW-1

E W - 1

EW-1

GD 1

24x72WORKSURFACE

24x42WORK

SURFAC

E

16x36

OVERH

EAD

BINDER BIN

24x72WORKSURFACE

24x42

WORK

SURFAC

E

16x36OVERH

EADBINDER B

IN

16x30OVERH

EADBINDER B

IN

E S - 1

LOCKER

LOCKER

FHC

9 1 5 m m

1 2 2 0 m m

FHC

FHC

915m

m

1220mm

9 1 5 m m 2 4 x 7 2W O R K S U R F A C E

24x42

WORK

SURFAC

E

16x36OVERH

EADBINDER B

IN

16x30OVERH

EADBINDER B

IN

F D

F D

F D

F D

TABLE, M

EETING

1524x762

TABLE, MEETING1524x762

TABLE, MEETING1524x762

JANITOR'S SINK

MS-

1

FD

JANITOR'S SINK

M S - 1

FHC

FHC

E W - 1

SHELVIN

G,OPEN

1426x305

EW-1

F D

SHELVING,

OPEN

1426x305

PT D

WASTE

SD 1

S - 1

PTD

WASTE

SD1

S-1

F D

PTD

WASTE

SD1

S-1

PT D

WASTE

SD 1

S - 1

PTDSD1

S-1

ST O RA G ETO WE R

61 0 x6 1 0

1 2 2 0 m m

915m

m

915mm

S - 2 A

W C - 3

F D F D

WASHER/DISINFECTO

RAC

C.,

TRAN

SFER

CART

759x730

WASHER/DISINFECTO

RAC

C.,

TRAN

SFER

CART

759x730

WASHER/DISINFECTO

RAC

C.,

TRAN

SFER

CART

759x730

WASHER/DISINFECTO

RAC

C.,

TRAN

SFER

CART

759x730

WASHER/DISINFECTO

RAC

C.,

TRAN

SFER

CART

759x730

WASHER/DISINFECTO

RAC

C.,

TRAN

SFER

CART

759x730

2x815mm

1220mm

1220mm

2x815mm

460m

m460m

m460m

m460m

m

460m

m

460mm

24x42WORKSURFACE

16x30OVERHEADBINDER BIN

16x42OVERHEADBINDER BIN

1 6 x 2 2 B B F

FRAME 1150mm

9 1 5 m m

GD 1

PTD

WASTE

SD1

S-1

915mm

915mm

GLASS 1050m

m

FRAM

E 1150m

m

915mm

PTD

SD1

S-1

PT D WASTE

SD 1

S - 1

PT DSD 1

S - 1

PT DSD 1

S - 1

460m

m

FHC

FHC

FHC

31.67comp. st .

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

CART,C

ASE,CLO

SED991x686

CART,C

ASE,CLO

SED991x686

CART,C

ASE,CLO

SED991x686

CART,C

ASE,CLO

SED991x686

CART,C

ASE,CLO

SED991x686

CART,C

ASE,CLO

SED991x686

CART,C

ASE,CLO

SED991x686

CART,C

ASE,CLO

SED991x686

CART,C

ASE,CLO

SED991x686

CART,C

ASE,CLO

SED991x686

CART,C

ASE,CLO

SED991x686

CART,C

ASE,CLO

SED991x686

CART,C

ASE,CLO

SED991x686

CART,C

ASE,CLO

SED991x686

CART,C

ASE,CLO

SED991x686

CART ,C

ASE,CLO

SED991x686

CART,C

ASE,CLO

SED991x686

CART,C

ASE,CLO

SED991x686

CART,C

ASE,CLO

SED991x686

CART,C

ASE,CLO

SED991x686

CART,C

ASE,CLO

SED991x686

CART,C

ASE,CLO

SED991x686

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

CART,C

ASE,CLO

SED991x686

CART,C

ASE,CLO

SED991x686

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

SUPPLY

CART

1219x610

S U P P L YC A R T

1 3 2 1 x 7 1 1

S U P P L YC A R T

1 5 7 5 x 6 8 6

S U P P L YC A R T

1 6 0 0 x 7 1 1

S U P P L YC A R T

1 5 7 5 x 6 8 6

SUPPLY

CART

1626x559

SUPPLY

CART

1626x559

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

SUPPLY

CART

1626x559

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

SUPPLY

CART

1626x559

SUPPLY

CART

1626x559

SUPPLY

CART

1626x559

SUPPLY

CART

1626x559

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

SUPPLY

CART

1564x610

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9 S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

SUPPLYCART

1626x559

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

T R A N S F E RC A R T

7 5 9 x 7 3 9

T R A N S F E RC A R T

7 5 9 x 7 3 9

T R A N S F E RC A R T

7 5 9 x 7 3 9

T R A N S F E RC A R T

7 5 9 x 7 3 9

T R A N S F E RC A R T

7 5 9 x 7 3 9

T R A N S F E RC A R T

7 5 9 x 7 3 9

T R A N S F E RC A R T

7 5 9 x 7 3 9

T R A N S F E RC A R T

7 5 9 x 7 3 9

T R A N S F E RC A R T

7 5 9 x 7 3 9

T R A N S F E RC A R T

7 5 9 x 7 3 9

WI R EC A R T

1 5 2 4 x 6 1 0

WI R EC A R T

1 5 2 4 x 6 1 0

WI R EC A R T

1 5 2 4 x 6 1 0

WI R EC A R T

1 2 1 9 x 6 1 0

WIRE

CART

1524x610

WIRE

CART

1524x610

WIRE

CART

1524x610

WIRE

CART

1524x610

WIRE

CART

1524x610

WIRE

CART

1524x610

WIRE

CART

152 4x610

WIRE

CART

1524x610

CAB

INET

1219x457

C A B I N E T1 2 1 9 x 4 5 7

CART,

HOUSEK

EEPING

559x1226

HAM

PER,LIN

EN483x381

H A M P E R ,LI N E N

4 8 3 x 3 8 1

H A M P E R ,LI N E N

4 8 3 x 3 8 1

H A M P E R ,LI N E N

4 8 3 x 3 8 1

HAM

PER,LIN

EN483x381

HAM

PER,LIN

EN483x381

H A M P E R ,LI N E N

4 8 3 x 3 8 1

H A M P E R ,LI N E N

4 8 3 x 3 8 1

H A M P E R ,LI N E N

4 8 3 x 3 8 1

H A M P E R ,LI N E N

4 8 3 x 3 8 1

H A M P E R ,LI N E N

4 8 3 x 3 8 1

H A M P E R ,LI N E N

4 8 3 x 3 8 1

H A M P E R ,LI N E N

4 8 3 x 3 8 1

H A M P E R ,LI N E N

4 8 3 x 3 8 1

S H E L V I N G ,S T E E L

9 1 4 x 4 5 7

S H E L V I N G ,S T E E L

9 1 4 x 4 5 7

UT I LI T YC A R T

5 8 4 x 1 3 9 7

UT I LI T YC A R T

5 8 4 x 1 3 9 7

UT I LI T YC A R T

5 8 4 x 1 3 9 7

UTILITY

CART

584x1397

UTILITY

CART

584x1397

LI N E NC A R T

1 6 5 1 x 6 1 0

LI N E NC A R T

1 6 5 1 x 6 1 0

LINEN

CART

1651x610

LI N E NC A R T

1 6 5 1 x 6 1 0

LI N E NC A R T

1 6 5 1 x 6 1 0

R A C K , D I S P O S A B L E W R A P1 6 0 0 x 6 8 6

R A C K , D I S P O S A B L E W R A P1 6 0 0 x 6 8 6

RACK, DISPO

SABLE W

RAP1600x686

RACK, DISPOSABLE W

RAP

1600x533

CHAIR-

STACKING

CHAIR-

STACKING

CHAIR-

STACKING

CHAIR-

STACKING

CHAIR-STACKING

C H A I R -T A S K w /

A R M S

CHAIR-TASK w/ARMS

CHAIR-TASK w/ARMS

CHAIR-TASK w/ARMS

CHAIR-TASK w/ARMS

C H A I R -T A S K

S T A N D A R D

CHAIR-

TASK w

/ARMS

FRIDGE

FI L E , L A T E R A LD R A W E R S9 1 4 x 3 0 5

FILE,LATERALDRAW

ERS914x305

FILE,LATERALDRAW

ERS914x305

FILE,LATERALDRAW

ERS914x305

FI L E , L A T E R A LD R A W E R S9 1 4 x 3 0 5

CART, RESU

SCITATIO

N, C

ARDIAC1092x584

CART, RESU

SCITATIO

N, C

ARDIAC1092x584

CART, RESU

SCITATIO

N, C

ARDIAC1092x584

24x42WORKSURFACE

C O P I E R -L A R G E

TABLE, MEETING1524x762

CART, RESU

SCITATIO

N, C

ARDIAC1092x584

CHAIR-

TASK w/

ARMS

16x22 BBF

CHAIR-

TASK w

/ARMS

16x22 BBF

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

SUPPLY

CART

1626x559

SUPPLY

CART

1626x559

T R U C K ,R E F U S E / U T I L I T Y

1 0 8 0 x 7 7 5

H A M P E R ,LI N E N

4 8 3 x 3 8 1

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

SUPPLYCART

1626x559

C A R T , R E S U S C I T A T I O N , C A R D I A C1 0 9 2 x 5 8 4

C A R T , R E S U S C I T A T I O N , C A R D I A C1 0 9 2 x 5 8 4

CART, RESU

SCITATIO

N, C

ARDIAC1092x584

C A R T , R E S U S C I T A T I O N , C A R D I A C1 0 9 2 x 5 8 4

H E A TS E A L E R5 0 8 x 2 7 9

H E A TS E A L E R5 0 8 x 2 7 9

DVD

BOOKCASE

914X305

W/R5 C H A I R -S T A C K I N G

C H A I R -S T A C K I N G

C H A I R -S T A C K I N G

C H A I R -S T A C K I N G

C H A I R -S T A C K I N G

CHAIR-

STAC

KING

CHAIR-

STAC

KING

CHAIR-

STAC

KING

CHAIR-

STAC

KING

CHAIR-

STAC

KING

CHAIR-

STAC

KING

CHAIR-

STAC

KING

CHAIR-

STAC

KING

C H A I R -S T A C K I N G

CHAIR-TA SK w/AR MS

CART,

HOUSEK

EEPING

559x1226

C A R T , R E S U S C I T A T I O N , C A R D I A C1 0 9 2 x 5 8 4

LI N E NC A R T

1 6 5 1 x 6 1 0

LI N E NC A R T

1 6 5 1 x 6 1 0C A B I N E T7 6 2 x 7 3 7

CHAIR-

TASK w

/ARMS

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

SUPPLY

CART

1626x559

SUPPLY

CART

1626x559

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

CART,C

ASE,CLO

SED991x686

CART,C

ASE,CLO

SED991x686

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

CART,C

ASE,CLO

SED991x686

CART,C

AS E,CLO

SED991x686

S U P P L YC A R T

1 5 4 2 x 5 5 9

C H A I R -T A S K w /

A R M S

C H A I R -T A S K

S T A N D A R D

CHAIR-

STACKING

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , C A S E , C L O S E D9 9 1 x 6 8 6

C A R T , R E S U S C I T A T I O N , C A R D I A C1 0 9 2 x 5 8 4

CART,C

ASE,CLO

SED991x686

SUPPLYCART

1626x559

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

S U P P L YC A R T

1 6 2 6 x 5 5 9

1 2 3 4 5 6 7 8 9 10 11

d1

d2

d3

d4

d4.3

d5

d6

Aa7-201 4A-

-

Aa7-201 3A

Aa7-201

2AFEMALE STAFF

FACIL

31.10cB1- 007

?

MANAGER

31.1cB1- 014

?

UNIFORM

31.11cB1- 010

?

INTER CHANGE

31.13cB1- 009

?

31.14

31.15

31.16

31.17

31.18

31.20

?

??

?

31.21

31.22

31.23

31.25

31.27

PATIENTEQUIPMENTCLEANING

31.28cB1 -02 1B

?

RO WATER

31.30cB1- 023

?

31.3

DETERGENT

31.31cB1- 024

?

SOILEDELEVATOR

C-S9

31.32C-S9

0.41

HSKP

31.33cB1- 045

?

INTER CHANGE

31.37cB1- 011

?

31.38

31.39

31.40

COMMUNICATION/RECEPTION

31.4cB1- 005

?

31.41

31.42

31.43

31.44

31.45

31.46

31.47

31.48

STERILIZERCOOL DOWN

AREA

31.49cB1- 026

0.41

?

FILES

31.5cB1- 006

?

31.51

31.52

HSKP

31.53cB1- 036

0.41

31.56

?31.60

31.61

31.62

?

EQUIPSTORAGE

31.64cB1- 002

?

?

31.66

31.67

31.69

CONFERENCE

31.7cB1- 020

?

31.73

BREAKOUT

31.76cB1- 004

?

31.77

STAFFLOUNGE

31.8cB1- 013

?

MALE STAFFFACIL

31.9cB1- 008

?

31.19-01

31.19-02

31.24-01

31.24-02

31.26-01

31.26-02

31.29.1

31.29.2

31.29.3

SINK/ EYEWASH

31.34-01cB1 -02 1A

?

SINK/EYEWASH

31.34-02cB1 -02 1C

?

SINK/ EYEWASH

31.54-01cB1 -02 5A

?

SINK/ EYEWASH

31.54-02cB1 -02 5B

?

31.55.1

31.55.2

31.57-a

31.57-b

31.57-c

31.57-d

31.57-e

31.57- f

31.57-g

ST-WR-BF

31-?????cB1- 046

0.3

VESTIBULE

C-B1- V4cB1 -C 12

0.3

EQUIP STOR

38.35-02cB1- 047

38.35

STORESBIO-ENG

38.38.bcB1- 039

?

STORESPHARMACY

38.38.hcB1- 037

?

STORES RADIOFILM

38.38.kcB1- 040

?

STORESOCCUPATIONAL

HEALTH ANDSAFETY

38.38.lcB1- 038

?

ST-WR

31.9cB1 -00 8A

?

ST-WR

31.10cB1 -00 7A

?

P42 C P42 P42P42 C

P42C P42 C

P42C

P42 C P42 C P42 C

P42C

P42 C P42 C P42 C

P42C

P42 C

P42 C

P42 C

P42C

P42

P42

P42

P42

P48P4 2 B

P48

P42

P42

P42

P42 P4 2 B

P49

P42

P42 C

P3

P42

P42

P48

P48

P42

P49

P48

P42

P42

P42

P42

P42

P3

P3 P3

P3

P3P3

P3

P3

P3

P3

P48

P42P4

2

P23

P22

P48

P42

P3 P48B

P49

P22 P22

P42

P42

P22

P22

P22

P42

P23

P3P3

P23

P23

P48

P48

P3

P3

P3

P49

P23

P42 C

P42C

P4 2 B

P4 2 B

P42

P4 2 B

P4 2 BP4 2 B

P23

P23

P49

P20

P23

P42

P42 C

P3

P3

P42

P48

P49

P48

P49

P42B

P23

P42

P42C

P3

P40

P40P40

P49

P42B

P42 C P48

P42

P48

P48 P42

P42

P42

P42

P42

P23

P48

P42

P42

P42B

P42C

P42 P42C

P23

DECONTAMINATIONcB1- 021

CLEANcB1- 025

STERILEcB1- 001

CONTROLROOM

C-B1- C2cB1- 003

?

CONTROLROOM

C-B1- C1cB1- 022

?

IT/LV

C-B1 -I1cB1- 061

?

SHELLcB1- 060

STOREScB1- 041

VESTIBULE

C-B1- V1cB1 -C 03

?

VESTIBULE

C-B1- V2cB1 -C 08

?

???cB1- 048

ELEVATORSCONTROL

ROOMcB1- 049

VESTIBULE

C-B1- V3cB1 -C 11

?cB1-C11.1

cB1-C11.2

cB1-060

cB1-

036

cB1-

003

cB1-

004.

1

cB1-

041

cB1-

046

cB1-

047

cB1-

048

cB1-

049

cB1-C08.2

cB1-

C03

.2cB

1-C

03.1

cB1-002

cB1-

004.

2

cB1-026

cB1-025.2

cB1-024 cB1-023

cB1-

02

cB1-025.1

cB1-

014

cB1-

013

cB1-

005.

1

cB1-

007

cB1-007B

cB1-008

cB1-

012

cB1-

011.

1

cB1-

011.

2

cB1-

009.

1

cB1-

020

cB1-

100

cB1-C08.1

cB1-

061

cB1-C12.2

cB1-

C12

.1

ZONE

1 /

Ad3-

B11

STAIR10C- B1

ELEVATORC-S4

ELEVATORC-S5

ELEVATORC-S6

ELEVATOR PITC-S7

CLEANELEVATOR

C-S8

31.7431.74

0.41

HWScB1 -00 5A

cB1-007A

cB1-

008A

cB1-

008B

ST-SHWR

31.9cB1 -00 8B

?

ST-SHWR

31.10cB1 -00 7B

?

cB1-

C01

ELECTRICAL

C-B1- E1cB1- 050

?

CORRIDORcB1 -C 01

CORRIDORcB1 -C 02

CORRIDORcB1 -C 04

CORRIDORcB1 -C 05

SERVICELOBBY

C-B1- S1cB1 -C 06

0.25

CORRIDORcB1 -C 07

CORRIDORcB1 -C 10

CORRIDORcB1 -C 09

2476

2440

1800

2440

2440

2325

2060

24402295

cB1-050

ZONE 2 / Ac3-B12 ZONE 2 / Ac3-B12

Ask-c041Ask-c04 2

cB1-

001

cB1-005.2

cB1-

009.

2

cB1-

021.

1

cB1-021.2

300

1145 1660 1070 2250

380

2213

dB1-

001.

2

H

TRUE NORTHCONSTRUCTION NORTH

A Partnership of Corporat ions

A R C H I T E C T S L I M I T E D

KEY PLAN

NO. ISSUED DATE

REVISIONS

Discrepancies must be reported immediately to theArchitect before proceeding. Only figured dimensons areto be used. Contractors must check all dimensions onsite. This drawing is protected by copyright.

ALL DIMENSIONS ARE SHOWN IN METRIC.

DRAWING TITLE

DRAWN CHECKED

SCALE @ A0 DATE

PROJECT NO.

DRAWING NO. ISSUED NO.

PROJECT

STAMP

ARCHITECTS IN JOINT VENTURE

+

STAMP

DRAWING STATUS

ab

dc

p

PROG

RESS

1 : 100

6/5/

2012

8:2

0:32

PM

C:\U

sers

\pu0

45\D

ocum

ents

\100

5-no

h-bu

ildin

g-c_

Fred

die

Cha

n.rv

t

6/5/

2012

8:20

:32

PM

01 ISSUED FOR 50% DD SUBMISSION 21.SEPT.2011

Ac3-B11

Interior Fit -up PackageBlock C Level B1 Basement Plan

- Zone C1

06

03/20/12

MMMAuthor

1005-1003

02 ISSUDE FOR PROGRESS SET 14.OCT.2011

03 ISSUED FOR BUILDING ENVELOPEPERMIT 12.DEC.2011

04 ISSUED FOR 100% DD SUBMISSION 22.FEB.2012

NOT FOR CONSTRUCTION

ALL PARTIT IONS ARE P1 UNLESS INDICATED OTHERWISEALL FURRING ARE P20 UNLESS INDICATED OTHERWISE

CENTRAL STERILE PROCESSING DEPARTMENT100% DD SUBMISSION

INTERIOR COURTYARDS SECTION

PARKIN ARchITEcTs

Page 32: ShengWu portfolio 2014

32

NKARchITEcTsY E A RLOCALET Y P E

B R I E F

R O L E

SUMMER INTERNAPRIL - MAY 2011TORONTO, CANADARESIDENTIAL

Involved in the design development of a two-storey private residential house in Toronto. Working in an intimate studio environment allowed for participation in the design discussion of all office projects.

- Built physical and digital sketch models for facade studies and central courtyard light studies- Schematic design of upper bedroom floorplan - Went on site-visits to check construction progress- Attended client meetings

UPPER FLOOR PLAN

INTERNshIP

Page 33: ShengWu portfolio 2014

FACADE ITERATIONS

NKA ARchITEcTs

Page 34: ShengWu portfolio 2014

ThANK yOu

SHENG WU

[email protected]@gmail.com