The Game

We form teams

Each team gets a prototype/wireframe

This has to be converted to a product

Team gets 8 Minutes

We regroup the demo

Teams then do a retrospective

At the end of 3rd Iteration…

Learnings

Some Good practices

Collaborate at regular intervals

Plan together – Work together - Deliver together

One person or group who takes responsibility of the complete product release

Identify dependencies early

Shared product Vision

Integrated workflow, if possible

Some More Good practices…

Remember – Clean code, unit testing, code

reviews, coding standards…

Continuous integration

Regular technical checkpoints

Shared Codebase

Distributed and Scaled teams

Loc 1

Loc 2

Loc 3

Loc 4

Distributed and Scaled teams

Loc 1

Loc 2

Loc 3

Loc 4

Distributed and Scaled teams

Loc 1

Loc 2

Loc 3

Loc 4

Closing Thought…

9901014478 in.linkedin.com/in/deepaktgururaja