Scrum_BLR 11th meet up 13 dec-2014 - Seeing the Complete Picture - Deepak Gururaja
-
Upload
scrumblr -
Category
Technology
-
view
397 -
download
4
Transcript of Scrum_BLR 11th meet up 13 dec-2014 - Seeing the Complete Picture - Deepak Gururaja
Seeing the
Complete PictureDeepak T Gururaja CSP, CSM
Scrum Master @ Ellucian
The Game
We form teams
Each team gets a prototype/wireframe
This has to be converted to a product
Team gets 8 Minutes
We regroup the demo
Teams then do a retrospective
At the end of 3rd Iteration…
Learnings
Some Good practices
Collaborate at regular intervals
Plan together – Work together - Deliver together
One person or group who takes responsibility of the complete product release
Identify dependencies early
Shared product Vision
Integrated workflow, if possible
Some More Good practices…
Remember – Clean code, unit testing, code
reviews, coding standards…
Continuous integration
Regular technical checkpoints
Shared Codebase
Distributed and Scaled teams
Loc 1
Loc 2
Loc 3
Loc 4
Distributed and Scaled teams
Loc 1
Loc 2
Loc 3
Loc 4
Distributed and Scaled teams
Loc 1
Loc 2
Loc 3
Loc 4
Closing Thought…
9901014478 in.linkedin.com/in/deepaktgururaja