ScholarshipNeedham Public
Schools
Proposed Needham High School Cafeteria & Classroom Expansion
Presented to Board of Selectmen
April 15, 2015
Needham High SchoolGiven many Town priorities, why consider adding space to
Needham High? How did we get here?
• After an extensive $64 million addition/renovation Needham High School was officially dedicated in the spring of 2009. Led by the efforts of the School Committee, Selectmen, and especially the PPBC, the Needham community celebrated the design and construction of a state-of-the-art facility matching the aspirations and needs of high performing and talented young people.
• Growing enrollment, curriculum recommendations & reforms, state mandates, and student needs have subsequently restricted the ability of the staff to schedule the kind of comprehensive academic program the community values and students and staff need.
Needham High SchoolGiven many Town priorities, why consider adding space to
Needham High? How did we get here?
• Since 2011, the Schools and Town have worked together to make adjustments and modifications: Juniors given off campus privilege at lunch; storerooms converted to classrooms; offices created out of conference rooms; a shipping container stores athletic equipment; and core academic class sizes have increased. Town Meeting has generously provided $200,000 to modify existing spaces to meet classroom and student needs.
• Despite the creative planning, modifications, repurposing of rooms, and construction of new walls, students, teachers, and families will continue to confront a lack of appropriate and necessary space to meet growing needs and expectations.
Lack of Space at NHS Limits ProgramWhat are the space constraints?
• The high school is and will remain over capacity by 200 students. NHS classrooms are designed for 22 students in 760 sq. ft.; contemporary MSBA standards are 23 students in 850 sq. ft.
• Over 125 sections (about 25% of all sections) hold 25 or more students; in 2007-08 the number of math, social studies, English, and foreign language sections with 25 or more students was 47—in the current year the number of sections with 25 or more has doubled to 95 sections.
Lack of Space at NHS Limits ProgramWhat are the space constraints?
• 53% of teachers are assigned to 2 or more classrooms. Over 12 storage rooms, offices, labs, and spaces have been or will be repurposed to accommodate growing enrollment. Small offices, closets, and conference areas have been repurposed to meet the growing demand for inclusive and effective special education programs.
• The cafeteria is undersized. Maximum occupancy is 488; the second lunch seating has an average of 620 students assigned.
• Next year’s enrollment is projected to be 1,686, 72 students over the current year. Enrollment is projected to level off to about 1,652 students over the next ten years.
Needham High School Enrollment Actual & Projected FY2008-FY2029
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16P
2016-17P
2017-18P
2018-19P
2019-20P
2020-21P
2021-22P
2022-23P
2023-24P
2024-25P
2025-26P
2026-27P
2027-28P
2028-29P
1300
1350
1400
1450
1500
1550
1600
1650
1700
1750
13891404
1438 1449
1522
1562
1582
1614
1686
1655 16541667
1603 16081623
16581675
1695 16941675
1695 1694 Enrollment Pro-jections
1450 Design Capacity
Actual
1,450 Design Capac-ity
Needham High School Enrollment Actual & Projected FY2008-FY2029
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16P
2016-17P
2017-18P
2018-19P
2019-20P
2020-21P
2021-22P
2022-23P
2023-24P
2024-25P
2025-26P
2026-27P
2027-28P
2028-29P
1300
1350
1400
1450
1500
1550
1600
1650
1700
1750
13891404
1438 1449
1522
1562
1582
1614
1686
1655 16541667
1603 16081623
16581675
1695 16941675
1695 1694 Enrollment Pro-jections
1450 Design Capacity
Actual
1,652 10 YearAver-age
2014-15 Needham High Room Usage
Needham High School Expansion - Options Space and Design Options
G
B
Option B – Courtyard Space and Design Options
Option B-1 Courtyard Space and Design Options
Option G Space and Design Options
Option G – Existing Webster St. Entry Space and Design Options
Option G – Schematic Space and Design Options
Drummey Rosane Anderson, Inc.
Cafeteria Expansion Space and Design Options
Webster Street
2,500 sq.
ft. Café
expansion
Lack of Space at NHS Limits ProgramNext Steps
• DRA Report and Cost Analysis due on April 20th; distribute to PPBC, School Committee, Finance Committee, Selectmen for review and discussion.
• May Town Meeting will discuss and vote on article to appropriate possible design funds.
• DRA completes design and November Town Meeting considers request for construction funds.
• The earliest a project could begin is June 2016 with construction over the summer months.
• The following slides will only be used if necessary
2015-16 Needham High Room Usage
New Room for 2015-2016Room in Use Room Available
High School Space Utilization
Nee
dham
Nat
ick
Dove
r-Sher
...
Lexi
ngton
Concord
Way
land
Linco
ln-S
ud...
Wes
twood
Fram
ingham
Norw
ood
Wes
ton
Wel
lesl
ey
Med
field
40
50
60
70
80
90
100
93 9290
85 85 85 85 84 83 83 8380
73
2014-2015 High School Utilization Percentage Compar-ison