Scaffold Inspection Register

Name of person inspecting:

Date/time: 01.02.18 @ 14.20 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 02.01.18 @ 13.10 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 02.11.2017 @ 15.15 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 04.01.18 @ 14.32 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 04.05.2017 @ 10.45 am

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 04.08.2017 @ 13.00 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 06.04.2017 @ 10.30 am

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 07.09.2017 @ 13.30 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 08.06.2017 @ 11.20 am

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 12.10.2017 @ 14.25 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 15.05.2017 @ 11.45 am

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 17.08.2017 @ 13.15 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 19.10.2017 @ 15.40 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 20.04.2017 @ 14.40 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 20.07.2017 @ 13.00pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 21.12.2017 @ 14.45 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 23.03.2017 @ 12.25 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 24.08.2017 @ 13.30 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 25.04.2017 @ 11.00 am

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 27.07.2017 @ 12.20 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 28.09.2017 @ 14.30 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 29.06.2017 @ 13.30 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 31.08.2017 @ 13.15 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 05.01.2017 @ 10.30 am

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 02.02.2017 @ 11.15 am

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 09.02.2017 @ 09.40 am

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 12.01.2017 @ 13.00 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Scaffold Inspection Register

Name of person inspecting:

Date/time: 26.01.2017 @ 11.25 am

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y