Scaffold Inspection Register

52
Scaffold Inspection Register Name of person inspecting: Date/time: 01.02.18 @ 14.20 pm Name and address of Contractor Osborne’s: Liphook station Description /location of Scaffold being inspected: Support scaffolds to platform staircases Answer Y, N or N/A: Base sound avoiding drains and services Boards adequately supported by transoms Double guardrails and toeboards fitted Sole boards correct size, free from cracks, firm and level Boards free from defects including notches and paint Brickguards fitted where materials Are to be stored/stacked on platform Standards correctly spaced, plumb, true and joints staggered Board overhang not more than 150mm on Transoms for standard 38mmboard Debris netting/Monarflex sheeting Fixed correctly. Ledgers level, true & joints staggered Work platform sufficient width & Not overloaded. Ladders free from defects and adequately tied Ledgers braced at alternate standards. Facade bracing installed Ties correctly spaced, fitted & a percentage tested. Handing over certificate issued/ Scafftag fitted. Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding. Scaffold secure against adverse weather e.g. boards secured down Record of any defects: none @ time of inspection . Can work be carried out safely? If No- Name of person reported to- Action taken Date corrected: Signature of Inspector: H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by Y Y Y Y Y N/A Y Y Y N/A N/A N/A Y N/A N/A N/A N/A Y Y

Transcript of Scaffold Inspection Register

Page 1: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 01.02.18 @ 14.20 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 2: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 02.01.18 @ 13.10 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 3: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 02.11.2017 @ 15.15 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 4: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 04.01.18 @ 14.32 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 5: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 04.05.2017 @ 10.45 am

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 6: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 04.08.2017 @ 13.00 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 7: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 06.04.2017 @ 10.30 am

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 8: Scaffold Inspection Register
Page 9: Scaffold Inspection Register
Page 10: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 07.09.2017 @ 13.30 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 11: Scaffold Inspection Register
Page 12: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 08.06.2017 @ 11.20 am

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 13: Scaffold Inspection Register
Page 14: Scaffold Inspection Register
Page 15: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 12.10.2017 @ 14.25 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 16: Scaffold Inspection Register
Page 17: Scaffold Inspection Register
Page 18: Scaffold Inspection Register
Page 19: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 15.05.2017 @ 11.45 am

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 20: Scaffold Inspection Register
Page 21: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 17.08.2017 @ 13.15 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 22: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 19.10.2017 @ 15.40 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 23: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 20.04.2017 @ 14.40 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 24: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 20.07.2017 @ 13.00pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 25: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 21.12.2017 @ 14.45 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 26: Scaffold Inspection Register
Page 27: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 23.03.2017 @ 12.25 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 28: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 24.08.2017 @ 13.30 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 29: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 25.04.2017 @ 11.00 am

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 30: Scaffold Inspection Register
Page 31: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 27.07.2017 @ 12.20 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 32: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 28.09.2017 @ 14.30 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 33: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 29.06.2017 @ 13.30 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 34: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 31.08.2017 @ 13.15 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 35: Scaffold Inspection Register
Page 36: Scaffold Inspection Register
Page 37: Scaffold Inspection Register
Page 38: Scaffold Inspection Register
Page 39: Scaffold Inspection Register
Page 40: Scaffold Inspection Register
Page 41: Scaffold Inspection Register
Page 42: Scaffold Inspection Register
Page 43: Scaffold Inspection Register
Page 44: Scaffold Inspection Register
Page 45: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 05.01.2017 @ 10.30 am

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 46: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 02.02.2017 @ 11.15 am

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 47: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 09.02.2017 @ 09.40 am

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 48: Scaffold Inspection Register
Page 49: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 12.01.2017 @ 13.00 pm

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y

Page 50: Scaffold Inspection Register
Page 51: Scaffold Inspection Register
Page 52: Scaffold Inspection Register

Scaffold Inspection Register

Name of person inspecting:

Date/time: 26.01.2017 @ 11.25 am

Name and address of Contractor Osborne’s: Liphook station

Description /location of Scaffold being inspected: Support scaffolds to platform staircases

Answer Y, N or N/A: Base sound avoiding drains and services

Boards adequately supported by transoms

Double guardrails and toeboards fitted

Sole boards correct size, free from cracks, firm and level

Boards free from defects including notches and paint

Brickguards fitted where materials Are to be stored/stacked on platform

Standards correctly spaced, plumb, true and joints staggered

Board overhang not more than 150mm on Transoms for standard 38mmboard

Debris netting/Monarflex sheeting Fixed correctly.

Ledgers level, true & joints staggered

Work platform sufficient width & Not overloaded.

Ladders free from defects and adequately tied

Ledgers braced at alternate standards. Facade bracing installed

Ties correctly spaced, fitted & a percentage tested.

Handing over certificate issued/ Scafftag fitted.

Are warning signs displayed on the Scaffold e.g. Scaffold Incomplete Do Not Use

Is the public protection//security in place? Around the scaffold e.g. Heras fencing Alarms, lights or hoarding.

Scaffold secure against adverse weather e.g. boards secured down

Record of any defects: none @ time of inspection . Can work be carried out safely?

If No- Name of person reported to-

Action taken

Date corrected:

Signature of Inspector:

H/S Doc Insp Rev 02 2015 A copy of this report to be left on site Created by

Y

Y

Y

Y

Y

N/A

Y

Y

Y

N/A

N/A

N/A

Y

N/A

N/A

N/A

N/A

Y

Y