SUBMESIBLE PUMPS

FORM # G-007 (5/09)SHT 1 of 1SAUDI ARAMCO PRE-COMMISSIONING FORMSUBMERSIBLE PUMPS

EQUIPMENT TYPE:USER REFERENCE:

EQUIPMENT TAG NO.:DESCRIPTION:

BI/JO NO.:PLANT NO. / LOCATION:

REF. DRAWINGS & DOCUMENTS:

MANUFACTURER:

MODEL NO.:SERIAL NO.:

COMMISSIONING DATE:

1PUMPS CHECKED PER DATA SHEET_______YES____NO____ 2NAME PLATE DATA CHECKED.YES____NO____ 3PUMP UNDAMAGEDYES____NO____ 4POSITION & MOUNTING CHECKED PER _____YES____NO____ 5CAISSONS INSTALLATION CHECKED PER_____ YES____NO____N/A____6PUMP LEVEL CHECKEDYES____NO____ 7SEAL SYSTEM COMPLETEDYES____NO____ 8SUCTION STRAINER FITTEDYES____NO____ 9MOTOR WINDINGS MEGGER CHECKEDYES____NO____ 10CABLE MEGGER CHECKEDYES____NO____ 11ACCESS TO DISCHARGE VALVE CHECKEDYES____NO____ 12INSTRUMENTATION SYSTEM VERIFIEDYES____NO____ 13ELECTRICAL SYSTEM VERIFIEDYES____NO____ 14VENDOR'S RECOMMENDATIONS FOLLOWEDYES____NO____

NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.APPROVALSSAPMTINSPECTIONOTHER DEPT.OPERATIONS

Signature & Date