S5c13 chapter 13-flat primary canal (fpc1) river points.

Post on 23-Jan-2018

93 views 0 download

Transcript of S5c13 chapter 13-flat primary canal (fpc1) river points.

Contents of Section 5: Reticular canal system for Interlinking Indian Rivers. Chapter 13-Flat Primary canal (FPC1) river points. 13.1-FPC1 river points.

Chapter 13: Flat Primary canal (FPC1) river points:

13.1. FPC1 river points: At the FPC river points the water from the entire catchment area of that river above that level will

feed the FPC, to make the FPC to supply the water below that level all across the nation.

All the points in the following table will be at 500mts AMSL except R. Manjra 502, R. Krishna 509 or

495 (Two possibilities), R. Hagari 495. We get some depressed and elevated area in this path, where

we may have to create Bi dam and Direct Connector to overcome the level difference.

S. N.(FPC1 point)

(Latitude) (Longitude)

1(FPC1Start 500)

(270049’51.06”N) (750056’36.71”E)

2(FPC1Gambhir 500)

(270021’21.90”N) (750050’28.85”E)

3(FPC1Dhund 500)

(27008’25.21”N) (750059’29.65”E)

4(FPC1Bandi 500)

(27000’56.10”N)

(750045’25.82”E)

5(FPC1 Mashi500) Natural PC.

(260033’52.20”N)

(740050’43.50”E)

6(FPC1 Khairi500)

(250041’32.91”N)

(740015’40.42”E)

7(FPC1 Berach500)

(240048’25.80”N)

(730057’34.83”E)

8(FPC1 Sou 500)

(24003’52.11”N)

(740051’26.39”E)

9(FPC1 Chambal 500)

(220052’2.16”N)

(750029’11.13”E)

10(FPC1 Gambhir 500)

(220056’46.68”N)

(750040’6.62”E)

11(FPC1 Sipra 500)

(220058’11.42”N)

(750055’54.22”E)

12(FPC1 Kalisindh 500)

(230012’32.14”N)

(76006’39.34”E)

13(FPC1 Newaj 500)

(230011’28.09”N)

(760017’16.84”E)

14(FPC1 Ahu 500)

(220048’29.23”N)

(760023’19.87”E)

15(FPC1 Parwan 500)

(220058’42.49”N)

(760027’56.03”E)

16(FPC1 Parbathi 500)

(220056’14.58”N)

(760040’20.54”E)

17(FPC1 T. To T. Betwa 500)

(230019’15.22”N)

(770018’53.53”E)

18(FPC1 Betwa 500)

(23004’6.48”N)

(770021’10.60”E)

19(FPC1 Bina 500)

(230035’44.59”N)

(780019’12.65”E)

20(FPC1 Jawai 500)

(240010’59.56”N)

(780042’53.83”E)

21(FPC1 Dhasan 500)

(230044’41.59”N)

(780031’45.18”E)

22(FPC1 Bewas 500)

(230044’47.06”N)

(780048’17.80”E)

23(FPC1 Sonar 500)

(230030’55.38”N)

(780045’32.68”E)

24(FPC1 Bearma 500)

(230012’49.25”N)

(790011’16.18”E)

25(FPC1 Heran 500)

(230017’27.28”N)

(800012’39.84”E)

26(FPC1 Narmada 500)

(220057’30.37”N)

(800033’26.77”E)

27(FPC1 Burhner 500)

(220039’10.57”N)

(800044’16.23”E)

28(FPC1 Banjar 500)

(220015’31.10”N)

(800027’56.38”E)

29(FPC1 Weinganga 500)

(220022’58.11”N)

(790040’0.04”E)

30(FPC1 Panch 500)

(210049’43.43”N)

(790016’38.22”E)

31(FPC1 Kanhan 500)

(210054’42.39”N)

(780038’29.06”E)

32(FPC1 Warda 500)

(210036’50.56”N)

(780022’44.64”E)

The maximum level available in T. Warda catchment area is 450 mts AMSL.

34(FPC1 Penganga 500)

(20004’3.22”N)

(760050’54.06”E)

35(FPC1 Purna 500)

(190059’46.64”N)

(760017’14.88”E)

36(FPC1 Dudna 500)

(190048’31.87”N)

(750043’35.69”E)

37(FPC1 Godavari 500)

(190055’57.07”N)

(740020’7.93”E)

38(FPC1 Manjra 502)

(170039’37.45”N)

(78003’16.51”E)

We get an elevated area between T. Manjra and T. Kagna. We need to create Direct connector to by

pass this elevation.

40(FPC1 Kagna 500)

(170017’14.83”N)

(770045’7.86”E)

41(FPC1 Benithora 500)

(170039’42.63”N)

(760042’5.84”E)

42(FPC1 Sina 500)

(180022’12.34”N)

(750020’56.21”E)

43(FPC1 Bhima 500)

(180024’13.28”N)

(740047’22.25”E)

44(FPC1 Man 500)

(170023’20.39”N)

(750010’20.69”E)

45(FPC1 Don 500)

(160027’59.38”N)

(760017’41.93”E)

46(FPC1 Krishna 509)

(160026’49.13”N)

(750037’22.23”E)

47: or (FPC1 Krishna 495)

(160018’17.21”N)

(750056’46.93”E)

It is an alternate possibility.

48(FPC1 Malaprabha 500)

(16006’38.33”N)

(750056’53.47”E)

49(FPC1T. To T. Tungabhadra 500)

(150015’15.48”N)

(76007’11.60”E)

50(FPC1 Tungabhadra 500)

(15004’7.35”N)

(750054’35.34”E)

51(FPC1 Chikkahagari 500)

(140048’23.36”N)

(760046’15.42”E)

52(FPC1Hagari 500)

(140033’55.73”N)

(760052’37.50”E)

53(FPC1Pennar 500)

(140027’47.15”N)

(770016’56.82”E)

54(FPC1Papagani 500)

(130054’41.49”N)

(780018’27.84”E)

55(FPC1Cheyyaru 500)

(130042’36.17”N)

(780046’5.03”E)

56(FPC1 Palar 500)

(120043’12.57”N)

(780027’7.99”E)

57(FPC1 Ponniyar 500)

(120034’18.46”N)

(78008’21.41”E)

58(FPC1 Kaveri 500)

(120017’45.82”N)

(770010’9.04”E)

59(FPC1 Moyar 500)

(110036’52.46”N)

(760043’1.46”E)

60(FPC1 Bhavani 500)

(11008’50.65”N)

(760039’25.92”E)

61(FPC1 Noyil 500)

(100050’25.94”N)

(760041’43.11”E)

There is a depressed level batewenn T. Noyil and T. Amavaravathi . Maximum height available in this

area is 380mts AMSL. We may to create U tube to bypass this depressed area. The air distance

between the previous and the next point is 42 kms.

63(FPC1Amaravati 500)

(100020’23.10”N)

(770015’26.46”E)

64(FPC1 Nangangi 500)

(100026’14.28”N)

(770041’9.37”E)

65(FPC1 Surya – Vaigai 500)

(90038’58.07”N)

(770027’35.31”E)

66(FPC1 Arjuna 500)

(90035’13.57”N)

(770031’49.54”E)

67(FPC1 Vaippur500)

(90014’6.93”N)

(770018’23.71”E)

68(FPC1End Chittar 500)

(80024’5.56”N)

(770030’10.66”E)

69: The area below it will get the water through secondary canals.