S2 DP 7 PROPOSED KWU TUNG NORTH FLUSHING WATER … · kwu tung north potential activity centre dp 4...

Post on 18-Jan-2021

3 views 0 download

Transcript of S2 DP 7 PROPOSED KWU TUNG NORTH FLUSHING WATER … · kwu tung north potential activity centre dp 4...

29/01/13

29/01/13

KTN NDA LANDSCAPE MITIGATION PLAN ( ZOOM B )

S2 DP 7 PROPOSED KWU TUNG NORTH FLUSHING WATER

SERVICE RESERVOIR

LO WU FIRING RANGE

LO WU SADDLE CLUB

KWU TUNG NORTH POTENTIAL ACTIVITY CENTRE

DP 4 ROAD D5

0 50 100 200

1:2000 @ A3

(metres)

N

KWU TUNG NORTHNDA BOUNDARY

MM4, MM5, MM7, MM12

MM1, MM4, MM5, MM6, MM7, MM9, MM10, MM11, MM17

MM6

LEGEND

DISTRICT DISTRIBUTOR - ROAD D5

LEGENDROAD

GREEN ROOF(MM10)

CYCLE TRACK /FOOTPATH

ENCLOSURE(SEMI / FULL)

MM8 BOUNDARY

WATER POND/FEATURE

MITIGATION MEASURESLEGENDMM1 MINIMISING TOPOGRAPHICAL CHANGEMM2 DETAILED DESIGN - VISUAL*

OPEN SPACE PROVISIONMM3

MM4 TREE PROTECTION AND PRESERVATION

MM5 TREE TRANSPLANTATION

MM6 SLOPE LANDSCAPING

MM7 COMPENSATORY PLANTING

MM8 WOODLAND COMPENSATORY PLANTING

MM9 VERTICAL GREENING

MM10 GREEN ROOF

MM11 SCREEN PLANTING

MM12 ROAD GREENING

MM13 MARSH/ WETLAND COMPENSATION

MM14.1 WATERCOURSE IMPACT MITIGATION- REPROVISION OF NATURAL STREAM

MM14.2 WATERCOURSE IMPACT MITIGATION- STREAM BUFFER PLANTING

MM14.3 WATERCOURSE IMPACT MITIGATION- ENHANCEMENT PLANTING ALONG EMBANKMENT

MM14.4 WATERCOURSE IMPACT MITIGATION- AVOID AFFECTING WATERCOURSES

MM15 POND REPLACEMENTMM16 SCREEN HOARDING *MM17 LIGHT CONTROL ** Mitigation Measure(s) (MM) does/ do not include in this plan is/are considered good practice throughout the NDA.

S3 DP PROPOSED KWU TUNG NORTH FRESH WATER SERVICE RESERVOIR

Figure 12.15.2

MM1, MM6

MM10

MM6, MM11, MM12

MM5, MM7

MM4

MM8

MM8