Work Zone Inspection Process
2013 Louisiana Transportation Conference
Barry L. Lacy, P.E.
Work Zone/Claims/Audit Engineer
7/29/2019 S16 Workzone Inspection Process LTC2013
2/62
Louisiana State Motto
7/29/2019 S16 Workzone Inspection Process LTC2013
3/62
Why is Temporary TrafficControl Important?
7/29/2019 S16 Workzone Inspection Process LTC2013
4/62
www.workzonesafety.org
7/29/2019 S16 Workzone Inspection Process LTC2013
5/62
TRAFFIC CONTROL MANAGEMENT
TCS's Traffic control daily diaries on file
Diaries reviewed by LA DOTD weekly
Night inspections conducted weekly,documented
MUTCD (Current) in LA DOTD district office
TCS's submitted statements concerningactivities to media on weekly basis
7/29/2019 S16 Workzone Inspection Process LTC2013
6/62
LAW ENFORCEMENT PRESENCE
Law enforcement present on project are
certified by LA DOTD for work zone
Law enforcement in proper position as
required in Traffic Control Drawing
7/29/2019 S16 Workzone Inspection Process LTC2013
7/62
Police Location
h h l h h
7/29/2019 S16 Workzone Inspection Process LTC2013
8/62
This is What a Fatal Crash at the
Queue Looks Like
7/29/2019 S16 Workzone Inspection Process LTC2013
9/62
Why You Should Pay Attention
7/29/2019 S16 Workzone Inspection Process LTC2013
10/62
Unfortunately, This Is What We Sometimes Get
7/29/2019 S16 Workzone Inspection Process LTC2013
11/62
And This
7/29/2019 S16 Workzone Inspection Process LTC2013
12/62
Impact Attenuators
Truck Mounted
Ground Mounted
Installed per specifications
Truck mounted attenuators used properly
Other attenuator types installed properly and
maintained
7/29/2019 S16 Workzone Inspection Process LTC2013
13/62
Attenuator Truck/Trailer
7/29/2019 S16 Workzone Inspection Process LTC2013
14/62
Tractor Launching TMA!!
7/29/2019 S16 Workzone Inspection Process LTC2013
15/62
Crash Cushion in Proper Place?
7/29/2019 S16 Workzone Inspection Process LTC2013
16/62
New DOTD Approved Attenuators?
7/29/2019 S16 Workzone Inspection Process LTC2013
17/62
WORKSITE TRAFFIC CONTROL
SUPERVISOR (TCS)
Current ATSSA Certification on file in project records
TCS requirements met
TCS (or TCT) available on project
TCS has current Traffic Control Plan and revisions
Is the DTOE involved in review of TTC revisions,
approval of non-standard DMS messages?
TCS has inspected traffic control devices daily & onceweekly at night (in use)
TCS coordinated pre-construction conference held
7/29/2019 S16 Workzone Inspection Process LTC2013
18/62
FLAGGERS (see MUTCD Chapter 6E)
Flagger Properly Trained
Appropriately dressed (ANSI Class 2 Lime Green vest duringdaylight; ANSI Class 3 Lime Green ensemble during night work)
Proper flagging methods used
Used in conjunction with a pilot car, or channelizing devices shall bedown centerline
Flagger location
Visible to traffic not standing in the shade, next to equipment,or does not have an escape route
Proper distance in advance of work
"STOP/SLOW" Paddle Correct size and shape (18 sign on 6 pole)
Satisfactory condition
Flags only in emergency operations
7/29/2019 S16 Workzone Inspection Process LTC2013
19/62
Proper Flagging
Improper Flagging
7/29/2019 S16 Workzone Inspection Process LTC2013
20/62
Improper Flagging
7/29/2019 S16 Workzone Inspection Process LTC2013
21/62
Is Training Needed?
7/29/2019 S16 Workzone Inspection Process LTC2013
22/62
Resting a Weary Head on a Hot Day!
7/29/2019 S16 Workzone Inspection Process LTC2013
23/62
Innovative?
7/29/2019 S16 Workzone Inspection Process LTC2013
24/62
Who will win these battles?
7/29/2019 S16 Workzone Inspection Process LTC2013
25/62
And these battles?
7/29/2019 S16 Workzone Inspection Process LTC2013
26/62
CONSTRUCTION/MAINTENANCE
SIGNING
Placement (spacing/mounting height/angle/offset/sight
distance) conforms to approved TC Drawing/MUTCD
Conforms to MUTCD/TC plans (size, layout, color)
Satisfactory condition (clean, readable, no obstructions,no wear/tear/wrinkling/bowing) per ATTSA
Satisfactory breakaway posts or NCHRP 350 compliant
clipped in correctly
Correct signing for situation
Conflicting signs properly treated (covered, turned,
removed)
Appropriate fluorescent & reflective sheeting on all sign
7/29/2019 S16 Workzone Inspection Process LTC2013
27/62
Signs (contd)
Wrong application of signs, not telling the
truth or left overnight
Signs need to be cleaned, straightened, or
replaced if necessary
Mesh signs are prohibited
Sign heights are 7 in urban areas, 5 in rural
areas and 1 on portable stands.
Signs are required on both sides of the road
on a 4 lane divided highway
7/29/2019 S16 Workzone Inspection Process LTC2013
28/62
Proper Coverings?
H T Kill 2 Bi d With 1 St !
7/29/2019 S16 Workzone Inspection Process LTC2013
29/62
How To Kill 2 Birds With 1 Stone!
7/29/2019 S16 Workzone Inspection Process LTC2013
30/62
Is This
Standard orUniform?
7/29/2019 S16 Workzone Inspection Process LTC2013
31/62
Is This Standard or Uniform?
7/29/2019 S16 Workzone Inspection Process LTC2013
32/62
Conflicting Signs?
7/29/2019 S16 Workzone Inspection Process LTC2013
33/62
TRAFFIC CONTROL DEVICES
Arrow Panel
Correct size, number of lights, etc.
Correct mounting height
Correct placement (at beginning of taper)
All lights working
Correct operating mode
Auto dimmer for night use operational
Do not leave in clear zone when not in use
Wrong application such as shifting tapers or
flagging one lane road operation
7/29/2019 S16 Workzone Inspection Process LTC2013
34/62
TRAFFIC CONTROL DEVICES (contd)
Channelizing devices (barricades, cones, drums, etc.)
Correct dimensions
Clean, adequately maintained, and functional
(upright, etc.)
Correct taper length
Correct spacing between devices
Warning lights working Termination Taper
Quality Guidelines govern Acceptable,
Marginal, Unacceptable
7/29/2019 S16 Workzone Inspection Process LTC2013
35/62
Good Public Relations?
What message are we
sending?
We dont careabout your
safety!
Good Public Relations?
7/29/2019 S16 Workzone Inspection Process LTC2013
36/62
Good Public Relations?
7/29/2019 S16 Workzone Inspection Process LTC2013
37/62
Proper Drum Ballast?
7/29/2019 S16 Workzone Inspection Process LTC2013
38/62
Clear Path?
How About
at Night?
7/29/2019 S16 Workzone Inspection Process LTC2013
39/62
TRAFFIC CONTROL DEVICES (contd)
Concrete Barriers (temporary)
Correctly pinned
Proper reflector spacing
End treatment installed, or Clear zone
established
Correct Flare Rate (15:1) Reflectors are required every 15
Proper Taper?
7/29/2019 S16 Workzone Inspection Process LTC2013
40/62
Proper Taper?
7/29/2019 S16 Workzone Inspection Process LTC2013
41/62
7/29/2019 S16 Workzone Inspection Process LTC2013
42/62
PAVEMENT MARKINGS
Pavement marking plan on file
Conflicting markings properly removed
Pavement markings placed correctly (full
compliance, width, length, location, waviness)
(Table 713-1)
No passing zones in full compliance. (Table 713-1)
Satisfactory condition (not overly faded,
damaged or obscured)
Is Black Paint Allowed?
7/29/2019 S16 Workzone Inspection Process LTC2013
43/62
Is Black Paint Allowed?
7/29/2019 S16 Workzone Inspection Process LTC2013
44/62
MISCELLANEOUS ITEMS
Clear Zone free of obstructions
Construction materials/equipment out of clear
zone or protected
Hazards in clear zone (other than barrier)delineated or protected
Pavement edge drop-offs minimized, marked if
present
Proper Clear Zone?
7/29/2019 S16 Workzone Inspection Process LTC2013
45/62
Proper Clear Zone?
Clear Zone Crashworthy or Cr*pworthy?
7/29/2019 S16 Workzone Inspection Process LTC2013
46/62
Clear Zone Crashworthy or Cr pworthy?
?
7/29/2019 S16 Workzone Inspection Process LTC2013
47/62
MISCELLANEOUS ITEMS
Any provision for accomodating pedestrians,bicycles, transit stops in workzone?
7/29/2019 S16 Workzone Inspection Process LTC2013
48/62
TRAFFIC IMPACTS
Queue Analysis Performed (EDSM No. VI.I.I.4) Adequate driver guidance (Drivers understand where
to go)
Traffic delays being mitigated (Alt Rte, delays
advertised etc.) Accidents documented
Are lane closure restrictions in contract beingfollowed?
Work Zone speed limit Speed reduction appropriate for operation (TC-00)
Speed Limit Signs and return to speed limit signs properlyplaced (TC-00)
WORK ZONE AREA AND INSPECTOR
7/29/2019 S16 Workzone Inspection Process LTC2013
49/62
WORK ZONE AREA AND INSPECTOR
SAFETY
Safe entrance/exit to work zone for equipment
and workers
Work zone buffer adequate (MUTCD 6C.06)
7/29/2019 S16 Workzone Inspection Process LTC2013
50/62
NIGHTTIME CONSTRUCTION
Approved lighting plan on file for nighttime
construction (105.20)
Is lighting plan being executed accordingly?
7/29/2019 S16 Workzone Inspection Process LTC2013
51/62
BARRICADES
Barricades are not crashworthy
Chevrons pointing in the wrong direction
Barricades need to be cleaned or replaced if
necessary
Barricades shall be sheeted on both sides.
7/29/2019 S16 Workzone Inspection Process LTC2013
52/62
Correct Barricade
C fli i M ?
7/29/2019 S16 Workzone Inspection Process LTC2013
53/62
Conflicting Message?
7/29/2019 S16 Workzone Inspection Process LTC2013
54/62
Changeable Message Signs
Correct message on CMS?
Blank CMS in clear zone not allowed
CMS shall be delineated
Not enough CMSs in use
2 miles & 5 miles from work zone
7/29/2019 S16 Workzone Inspection Process LTC2013
55/62
Proper Message & Storage?
7/29/2019 S16 Workzone Inspection Process LTC2013
56/62
How About This Work Zone?
7/29/2019 S16 Workzone Inspection Process LTC2013
57/62
How About This Work Zone?
f i ?
7/29/2019 S16 Workzone Inspection Process LTC2013
58/62
How Many Infractions?
Wrong
Taper
NoArrow
Board
Sidewalk
Blocked
WheresThe
Sign?
P d i B Ki kl d WA
7/29/2019 S16 Workzone Inspection Process LTC2013
59/62
Pedestrian Bonus Kirkland, WA
Seattle Seaha ks QBs
7/29/2019 S16 Workzone Inspection Process LTC2013
60/62
Seattle Seahawks QBs
Recycle Old Cones??
7/29/2019 S16 Workzone Inspection Process LTC2013
61/62
yOr What You Think of This
Presentation??
7/29/2019 S16 Workzone Inspection Process LTC2013
62/62
Questions?
Barry L. Lacy, P.E.
Work Zone/Claims/Audit Engineer
barry.lacy@la.gov
(225) 379-1584
mailto:barry.lacy@la.govmailto:barry.lacy@la.gov