Route from Calvert to Twyford - - drawing number HS2...

Post on 27-Apr-2018

222 views 1 download

Transcript of Route from Calvert to Twyford - - drawing number HS2...

www.arup.com

T +44(0)121 213 3000 F +44(0)121 213 3001

Solihull, West Midlands B90 8AE

The Arup Campus, Blythe Gate, Blythe Valley Park

Feasibility Study

High Speed 2

Sheet 13 of 33

Plan and Profile

Rail

209742-00

HS2-ARP-00-DR-RW-05013 3.0

As Shown

/ /2212 11 CO MP CL

For Coordination

2.0

/ /05 0112 CO MP CL

3.0

Post Consultation Route

J:\209000\2

09742-0

0\4 Intern

al Project

Data\4-1

0 P

ost

Consultation Dra

win

gs\0

_Dra

win

gs\H

S2-A

RP-0

0-D

R-R

W-0

5013.d

gn

Approved

Approved

60

60

60

60 60

60

80

80

80

80 8080 80

80

80

80

80

80

80

80

80

80

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

76+000

77+000

78+00079+000

80+000

81+000

82+000

83+000

84+000

40.0

50.0

60.0

70.0

80.0

90.0

100.0

110.0

120.0

130.0

140.0

150.0

160.0160.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

110.0

120.0

130.0

140.0

150.0

160.0160.0

Chainage

76+800

76+900

77+000

77+100

77+200

77+300

77+400

77+500

77+600

77+700

77+800

77+900

78+000

78+100

78+200

78+300

78+400

78+500

78+600

78+700

78+800

78+900

79+000

79+100

79+200

79+300

79+400

79+500

79+600

79+700

79+800

79+900

80+000

80+100

80+200

80+300

80+400

80+500

80+600

80+700

80+800

80+900

81+000

81+100

81+200

81+300

81+400

81+500

81+600

81+700

81+800

81+900

82+000

82+100

82+200

82+300

82+400

82+500

82+600

82+700

82+800

82+900

83+000

83+100

83+200

Horizontal Alignment

L=349.9R=8215.3

L=838.2L=349.9L=510.8

L=365.0R=7275.0

L=2880.5

L=365.0

L=375.0R=8250.0

L=4820.4

Vertical Alignment L=1653.2G=0.54%

L=366.1

R=56000.0

L=2240.5

G=-0.12%

L=144.1

R=-56000.0

L=3833.0

G=0.14%

Existing Level 79.6

79.9

79.8

80.4

81.5

81.9

84.2

84.1

85.6

83.4

87.1

88.4

90.7

88.6

90.0

88.0

88.8

87.6

86.6

86.2

86.3

86.7

87.2

89.8

89.8

88.6

88.6

88.4

86.8

86.8

90.1

90.4

91.4

89.7

89.5

89.0

88.7

88.8

88.0

87.1

87.3

86.0

85.4

85.8

85.8

85.9

86.5

84.4

82.7

82.7

83.4

83.7

84.1

84.0

83.6

83.3

83.4

84.6

86.1

87.3

88.7

89.7

90.5

91.3

91.3

Proposed Level 79.4

79.9

80.5

81.0

81.5

82.1

82.6

83.2

83.7

84.2

84.8

85.3

85.8

86.4

86.9

87.5

87.9

88.3

88.4

88.4

88.3

88.1

88.0

87.9

87.8

87.7

87.6

87.4

87.3

87.2

87.1

87.0

86.9

86.8

86.6

86.5

86.4

86.3

86.2

86.1

85.9

85.8

85.7

85.8

86.0

86.1

86.3

86.4

86.5

86.7

86.8

87.0

87.1

87.2

87.4

87.5

87.7

87.8

87.9

88.1

88.2

88.4

88.5

88.7

88.8

+0.7

+0.6

+0.2

+0.8

+0.7

+1.8

+2.2

+2.0

+1.4

+0.8

+0.5

+0.4

+0.3

+0.2

+0.2

+2.0

+3.8

+4.0

+3.4

+3.3

+3.0

+3.2

+3.8

+4.2

+4.3

+3.2

+1.8

+0.8

Cut and Fill -0.2

-1.6

-0.9

-1.9

-2.3

-3.1

-4.9

-2.2

-3.1

-0.5

-0.9

-1.9

-2.0

-0.9

-1.0

-1.0

-3.0

-3.4

-4.5

-2.9

-2.9

-2.5

-2.3

-2.5

-1.8

-1.0

-1.4

-0.2

-0.2

-0.5

-1.3

-2.0

-2.6

-2.5

Design Speed 400km/h

Ch.7

8329.1

96

TP.8

7.6

09

Ch.7

8695.2

81

TP.8

8.3

81

Ch.8

0935.7

32

TP.8

5.7

82

Ch.8

1079.8

70

TP.8

5.8

01

New HS2 Viaduct over Flood Plain 280m

New Possible Permanent

Realignment of East West

Railway over HS2

Widening of Existing Railway Corridor 8000mNew HS2 Viaduct over Flood Plain 310m

New Possible Permanent Realignment

of East West Railway over HS2

New Infrastructure Maintenance Depot.

For Depot Drawing refer to

HS2-ARP-00-DR-RW-05302

New Possible Permanent

Road Diversion over HS2

New Possible School Hill

Road Diversion over HS2

New HS2 Viaduct

over Flood Plain

New Possible Permanent

Road Diversion over HS2

New HS2 Viaduct

over Flood Plain

New Possible Permanent School

Hill Diversion over HS2Possible

Road Closure

Possible

Road Closure

PlanScale 1:10000

ProfileScale H 1:10000 V 1:1000

N

For

Continuation R

efer

To H

S2-A

RP-D

R-R

W-0

5014

For C

ontin

uatio

n R

efer T

o H

S2-A

RP-D

R-R

W-0

5012

Legend National Parks

Flood Risk Zones

Special Areas of Conservation

Special Protection Areas

National Nature Reserves

Parks and Gardens

Scheduled Ancient Monuments

Historical Battlefields

Listed buildings

Area of Outstanding Natural Beauty

RAMSAR

World Heritage Site

SSSI

A1 A

9

B C D E F G H I J K L M N O P

Drawing No

Drawing Status

Discipline

Scale at A1

Job No

Issue

Drawing Title

Issue Date By Chkd Appd

Job TitleClient

10

8

7

6

5

4

2

1

3

' Arup

' Crown copyright and database rights 2011 Ordnance Survey 10049190

0.040.02 0.030 0.01 0.05 Metres at 1:1 (Scale with caution as distortion can occur)

Railway

Embankment

Highway

Embankment

Highway

Cutting

Railway

Cutting