Redditch Branch Enhancement. Introduction Roger Clarke – NWR Project Manager Roger Clarke – NWR...

Post on 05-Jan-2016

217 views 0 download

Tags:

Transcript of Redditch Branch Enhancement. Introduction Roger Clarke – NWR Project Manager Roger Clarke – NWR...

Redditch Branch Enhancement

Introduction

• Roger Clarke – NWR Project Manager• Bob Aldridge – NWR Scheme Project Mgr• Marc Riley – BGCL Contracts Manager• Dominic Eldridge – BGCL Project Manager• Susan Fisher – LM Estates Manager• Karen Allington – LM Bus Replacement

Focus of Presentation

• Provide information on forthcoming works (4x29hr weekend possessions & 8 week blockade).

• Advise what alternative transport arrangements are proposed whilst the train service is disrupted.

• Meeting will not centre on previous complaints – purpose is to be “informative”.

Scheme Details• Install a 3km length of passing loop between Alvechurch and Redditch• Aim to increase capacity on the Redditch Branch Line from 2 to 3 trains per

hour

Main Lines

Redditch Branch

Existing LayoutNorth to Barnt Green Station South to Redditch Station

Alvechurch Station O/Br. 12 Grange Lane

O/Br.10 Station RoadCutting

Embankment

54 MP53 ¼ MP 55 MP 55 ¼ MP

Proposed Layout

North to Barnt Green Station South to Redditch Station

Alvechurch Station

New Up Line

Down Line

New Platform & Footbridge

54 MP53 ¼ MP 55 MP 55 ¼ MP

Existing Arrangement

Proposed Arrangement

Alvechurch Station 1950s

Alvechurch Station Existing

Looking South towards Redditch

Alvechurch Station Proposed

New Up Line

New Footbridge & LiftsNew OLE

Looking South towards Redditch

Grange Lane Existing

Looking North towards Alvechurch

Grange Lane Proposed

Looking North towards Alvechurch

New Up Line

New OLE

29 Hour Possessions• Week 11 – 00:10 Sun 8th June to 05:30 Mon 9th June

• Installation of OLE gantries to South• Delivery of points to Alvechurch• Installation of track drainage through station• Placement of bottom ballast • Installation of OLE foundations

• Week 12 - 00:10 Sun 15th June to 05:30 Mon 16th June• Installation of OLE gantries to South to mid-point• Delivery of points to Weights Lane• Installation of track drainage south of station• Placement of bottom ballast • Delivery of station footbridge• Installation of OLE foundations

29 Hour Possessions• Week 13 – 00:10 Sun 22nd June to 05:30 Mon 23rd June

• Installation of OLE gantries to Mid-point to north of Grange Lane• Placement of bottom ballast • Installation of OLE foundations• Wingwall retaining wall to Overbridge at Station Road

• Week 14 - 00:10 Sun 29th June to 05:30 Mon 30th June• Installation of OLE gantries to Grange Lane to Alvechurch• Placement of bottom ballast • Wingwall retaining wall to Overbridge at Station Road

Blockade Works• Install new signal panel at Saltley PSB• Removal of 72 no. OLE gantries & cantilevers• Removal of 85 no. existing OLE foundations• Relay 1500m of existing track on Down Line• Slew 1700m of existing track on Down Line• Install new 3000m track.• Install S&C (2no.) • 10 no. engineering trains• 12 no. tamping shifts• Install 116 no. OLE gantries - 7900m of wire runs• Install signalling equipment • Install CCTV, PA systems, CIS etc at Station• Testing & commissioning• Open Line & Station

Working next to Existing Line

Existing Track

Existing OLE Gantries

NewOLE Gantries

Foundation Excavation Exclusion Zone

Bottom ballast installed prior to blockade

Redditch Branch Enhancement

Blockade Works

Alvechurch53.40

Kings Norton46.59

Longbridge49.12

Northfield48.12

Barnt Green51.67

Redditch56.60

Five Ways43.18

University 44.73

Selly Oak45.50

Bournville46.58

Hazelwell45.07

Stage 2b – Blockade WorksMain Blockade Works

• Blockade Shortened back to Redditch Branch Only.

52.40

Area affected by works

Blockade Overview

Week 1 & 2 of the Blockade

03:45 Mon – 03:45 Wed

03:45 Wed – 03:45 Sun

00:45 Sun – 05:45 Mon

03:45 Wed – 03:45 Fri

19:45 Fri – 04:15 Sat

04:15 Sat – 04:15 Tue

04:15 Sat – 18:15 Sat

04:15 Tue– 18:15 Sat

Week 3 to 6 of the Blockade

13:15 Sun– 12:00 Thu

04:00 Sat – 12:00 Fri

Weeks 7 to 8 of the Blockade

04:45 Mon – 04:00 Mon

Remove OLE8 Week Blockade

• Isolation to include Barnt Green Station – first 27hrs only• Install Earth Section & Remove OLE (2 Days)

Week 1

South to Redditch Station

North to Barnt Green Station

54 MP53 ¼ MP 55 MP 55 ¼ MP

UPSIDE

DOWNSIDE

Gantry Removal8 Week Blockade

Week 1 - 2

South to Redditch Station

North to Barnt Green Station

54 MP53 ¼ MP 55 MP 55 ¼ MP

UPSIDE

DOWNSIDE

Thimble North Rails (570m)

8 Week Blockade

Week 1

South to Redditch Station

North to Barnt Green Station

54 MP53 ¼ MP 55 MP 55 ¼ MP

UPSIDE

DOWNSIDE

Remove North Sleepers8 Week Blockade

Week 1

South to Redditch Station

North to Barnt Green Station

54 MP53 ¼ MP 55 MP 55 ¼ MP

UPSIDE

DOWNSIDE

Excavate to Formation8 Week Blockade

Week 2

South to Redditch Station

North to Barnt Green Station

54 MP53 ¼ MP 55 MP 55 ¼ MP

UPSIDE

DOWNSIDE

Place Bottom Ballast8 Week Blockade

Week 2

South to Redditch Station

North to Barnt Green Station

54 MP53 ¼ MP 55 MP 55 ¼ MP

UPSIDE

DOWNSIDE

Install S&C via PEMS8 Week Blockade

Week 2

South to Redditch Station

North to Barnt Green Station

UPSIDE

DOWNSIDE

54 MP53 ¼ MP 55 MP 55 ¼ MP

Install North Sleepers8 Week Blockade

Week 2

South to Redditch Station

North to Barnt Green Station

54 MP53 ¼ MP 55 MP 55 ¼ MP

UPSIDE

DOWNSIDE

Install North Rails8 Week Blockade

Week 2

South to Redditch Station

North to Barnt Green Station

UPSIDE

DOWNSIDE54 MP53 ¼ MP 55 MP 55 ¼ MP

Install S&C via PEMs8 Week Blockade

Week 2

South to Redditch Station

North to Barnt Green Station

54 MP53 ¼ MP 55 MP 55 ¼ MP

UPSIDE

DOWNSIDE

Install South Sleepers8 Week Blockade

Week 2

South to Redditch Station

North to Barnt Green Station

54 MP53 ¼ MP 55 MP 55 ¼ MP

UPSIDE

DOWNSIDE

Install South Rails8 Week Blockade

Week 2

South to Redditch Station

North to Barnt Green Station

54 MP53 ¼ MP 55 MP 55 ¼ MP

UPSIDE

DOWNSIDE

1 of 2 No. Autoballasters8 Week Blockade

Week 3

South to Redditch Station

North to Barnt Green Station

54 MP53 ¼ MP 55 MP 55 ¼ MP

UPSIDE

DOWNSIDE

Tamp Down Line incl. S&C8 Week Blockade

Week 3

South to Redditch Station

North to Barnt Green Station

54 MP53 ¼ MP 55 MP 55 ¼ MP

UPSIDE

DOWNSIDE

Rail Drop

8 Week Blockade

Week 3

South to Redditch Station

North to Barnt Green Station

54 MP53 ¼ MP 55 MP 55 ¼ MP

UPSIDE

DOWNSIDE

1 of 2 Sleeper Trains

8 Week Blockade

Week 3

South to Redditch Station

North to Barnt Green Station

54 MP53 ¼ MP 55 MP 55 ¼ MP

UPSIDE

DOWNSIDE

Thimble Rail to Up Line

8 Week Blockade

Week 3

South to Redditch Station

North to Barnt Green Station

54 MP53 ¼ MP 55 MP 55 ¼ MP

UPSIDE

DOWNSIDE

1 of 3 Ballast Trains

8 Week Blockade

Week 3

South to Redditch Station

North to Barnt Green Station

54 MP53 ¼ MP 55 MP 55 ¼ MP

UPSIDE

DOWNSIDE

Tamp Up Line

Week 3

South to Redditch Station

North to Barnt Green Station

8 Week Blockade

54 MP53 ¼ MP 55 MP 55 ¼ MP

UPSIDE

DOWNSIDE

Install Cantilevers & RC

Week 4 & 5

South to Redditch Station

North to Barnt Green Station

8 Week Blockade

54 MP53 ¼ MP 55 MP 55 ¼ MP

UPSIDE

DOWNSIDE

Install Catenary & Contact

8 Week Blockade

Week 5 & 6

South to Redditch Station

North to Barnt Green Station

54 MP53 ¼ MP 55 MP 55 ¼ MP

UPSIDE

DOWNSIDE

Autoballasters

Week 6

South to Redditch Station

North to Barnt Green Station

8 Week Blockade

54 MP53 ¼ MP 55 MP 55 ¼ MP

UPSIDE

DOWNSIDE

Final Tamp

Week 6

South to Redditch Station

North to Barnt Green Station

8 Week Blockade

54 MP53 ¼ MP 55 MP 55 ¼ MP

UPSIDE

DOWNSIDE

Final OLE Adjustments

Week 6

South to Redditch Station

North to Barnt Green Station

8 Week Blockade

54 MP53 ¼ MP 55 MP 55 ¼ MP

UPSIDE

DOWNSIDE

Communications with NWR

• All communications will be via the help line:-

08457 11 4141

Public Relations team have been advised of forthcoming works and will be able to provide updated information.