Reconfiguration Plan: CG06 RP 2

Post on 07-Jan-2022

3 views 0 download

Transcript of Reconfiguration Plan: CG06 RP 2

Byrne

side -

Gillie

ston R

d

Merrigum - Ardmona Rd

Davie

s Rd

Lilford Rd

Mulca

hy R

d

Manley Rd

11/3/

5A

1/20/6

1/19/6

20/6

11/3/

5A

2/18/6

11/3/6

3/6

17/6

18/6

10/3/6

1/18/6

6

19/6

RN1757RN1761

RN1762RN1763

RN1757A

RN1765

RN1758

RN1760A RN1760

RN1759

RN1755

RN1756

55\PP3178

2\LP215455

2\PS346877

1\PS401095

2\LP70235

2\PS401095

1\LP64011

2\LP64011

4\PS401095

3\PS401095

73\PP3178

1\LP132118

73A\PP3178

1\LP138355

1\PS346877

RN1759

RN1760

RNDS1763

GOULBURN-MURRAY WATER40 CASEY STREET (PO BOX 165)

TATURA VIC 3616Ph (03) 5833 5500 Fax (03) 58245827

gissupport@g-mwater.com.au

Reconfiguration Plan: CG06 RP 2

The content of this product is provided for information purposes only. No claim is made as to the accuracy of authenticity of the content of the product. In no event will G-MW, its agents, instrumentalities and employees be liable for the accuracy of the information contained within this product nor its use of reliance placed on it. The information used within this product is provided on the basis that all persons accessing the information undertake responsibility for assessing the relevance and accuracy of its content.

0 0.2 0.40.1 kmIR185583

SCALE AT A0 1:4,620

14 May 2018Boort

Cobram

Tatura

Echuca

KerangCohuna

Kyabram

Benalla

Swan Hill

Shepparton

YarrawongaPyramid Hill

Service Point Modernisation Action

Retain

Relocate

Replace

Rationalise

Relocation Point

Channel Modernisation Action

Retain channel with no modernisation

Retain channel with remediation

Retain channel with modernisation

Pipeline

Decommission channel

G-MW Irrigation Structures

Abandoned Structure

Bridge

Culvert

Drainage Inlet

Electrical Crossing

Farm Irrigation Crossing

Flume

Footbridge

Monitoring Station

Offtake

Outfall

Pump Station

Regulator

Regulator Combine

Subway

Syphon

Valve - Isolation

Weir

Channel Network

Backbone Channel

Non-Backbone

Decommissioned Channel

Pipeline

Proposed Pipeline

Transport

Freeway

Highway

Major Road

Semi-Major Road

Minor Road

Waterway

Reservoir

Lake

DCRP Customer Parcels

Other Customer Properties

Property/Land Not Serviced

All Proposed Works to be Completed By: / /