1
Byrneside - Gillieston Rd Merrigum - Ardmona Rd Davies Rd Lilford Rd Mulcahy Rd Manley Rd 11/3/5A 1/20/6 1/19/6 20/6 11/3/5A 2/18/6 11/3/6 3/6 17/6 18/6 10/3/6 1/18/6 6 19/6 RN1757 RN1761 RN1762 RN1763 RN1757A RN1765 RN1758 RN1760A RN1760 RN1759 RN1755 RN1756 55\PP3178 2\LP215455 2\PS346877 1\PS401095 2\LP70235 2\PS401095 1\LP64011 2\LP64011 4\PS401095 3\PS401095 73\PP3178 1\LP132118 73A\PP3178 1\LP138355 1\PS346877 RN1759 RN1760 RNDS1763 GOULBURN-MURRAY WATER 40 CASEY STREET (PO BOX 165) TATURA VIC 3616 Ph (03) 5833 5500 Fax (03) 58245827 [email protected] Reconfiguration Plan: CG06 RP 2 The content of this product is provided for information purposes only. No claim is made as to the accuracy of authenticity of the content of the product. In no event will G-MW, its agents, instrumentalities and employees be liable for the accuracy of the information contained within this product nor its use of reliance placed on it. The information used within this product is provided on the basis that all persons accessing the information undertake responsibility for assessing the relevance and accuracy of its content. 0 0.2 0.4 0.1 km IR185583 SCALE AT A0 1:4,620 14 May 2018 Boort Cobram Tatura Echuca Kerang Cohuna Kyabram Benalla Swan Hill Shepparton Yarrawonga Pyramid Hill Service Point Modernisation Action Retain Relocate Replace Rationalise Relocation Point Channel Modernisation Action Retain channel with no modernisation Retain channel with remediation Retain channel with modernisation Pipeline Decommission channel G-MW Irrigation Structures Abandoned Structure Bridge Culvert Drainage Inlet Electrical Crossing Farm Irrigation Crossing Flume Footbridge Monitoring Station Offtake Outfall Pump Station Regulator Regulator Combine Subway Syphon Valve - Isolation Weir Channel Network Backbone Channel Non-Backbone Decommissioned Channel Pipeline Proposed Pipeline Transport Freeway Highway Major Road Semi-Major Road Minor Road Waterway Reservoir Lake DCRP Customer Parcels Other Customer Properties Property/Land Not Serviced All Proposed Works to be Completed By: / /

Transcript of Reconfiguration Plan: CG06 RP 2

Byrne

side -

Gillie

ston R

d

Merrigum - Ardmona Rd

Davie

s Rd

Lilford Rd

Mulca

hy R

d

Manley Rd

11/3/

5A

1/20/6

1/19/6

20/6

11/3/

5A

2/18/6

11/3/6

3/6

17/6

18/6

10/3/6

1/18/6

6

19/6

RN1757RN1761

RN1762RN1763

RN1757A

RN1765

RN1758

RN1760A RN1760

RN1759

RN1755

RN1756

55\PP3178

2\LP215455

2\PS346877

1\PS401095

2\LP70235

2\PS401095

1\LP64011

2\LP64011

4\PS401095

3\PS401095

73\PP3178

1\LP132118

73A\PP3178

1\LP138355

1\PS346877

RN1759

RN1760

RNDS1763

GOULBURN-MURRAY WATER40 CASEY STREET (PO BOX 165)

TATURA VIC 3616Ph (03) 5833 5500 Fax (03) 58245827

[email protected]

Reconfiguration Plan: CG06 RP 2

The content of this product is provided for information purposes only. No claim is made as to the accuracy of authenticity of the content of the product. In no event will G-MW, its agents, instrumentalities and employees be liable for the accuracy of the information contained within this product nor its use of reliance placed on it. The information used within this product is provided on the basis that all persons accessing the information undertake responsibility for assessing the relevance and accuracy of its content.

0 0.2 0.40.1 kmIR185583

SCALE AT A0 1:4,620

14 May 2018Boort

Cobram

Tatura

Echuca

KerangCohuna

Kyabram

Benalla

Swan Hill

Shepparton

YarrawongaPyramid Hill

Service Point Modernisation Action

Retain

Relocate

Replace

Rationalise

Relocation Point

Channel Modernisation Action

Retain channel with no modernisation

Retain channel with remediation

Retain channel with modernisation

Pipeline

Decommission channel

G-MW Irrigation Structures

Abandoned Structure

Bridge

Culvert

Drainage Inlet

Electrical Crossing

Farm Irrigation Crossing

Flume

Footbridge

Monitoring Station

Offtake

Outfall

Pump Station

Regulator

Regulator Combine

Subway

Syphon

Valve - Isolation

Weir

Channel Network

Backbone Channel

Non-Backbone

Decommissioned Channel

Pipeline

Proposed Pipeline

Transport

Freeway

Highway

Major Road

Semi-Major Road

Minor Road

Waterway

Reservoir

Lake

DCRP Customer Parcels

Other Customer Properties

Property/Land Not Serviced

All Proposed Works to be Completed By: / /