Recent Work Samples of Peng Wang

Post on 05-Dec-2014

905 views 0 download

description

Work samples from Portman and HOK

Transcript of Recent Work Samples of Peng Wang

Work Samples Work Samples - Peng Wang

Zayed Center, LahoreHigh-rise Mixed-

Company: HOK Group, DC OfficeRole: DesignerSupervisor: Duncan Lyons, Design Principal

Zayed Center, Lahore-use Complex

Company: HOK Group, DC OfficeRole: DesignerSupervisor: Duncan Lyons, Design Principal

Bird’s Eye View RenderingBird’s Eye View Rendering

Area SummaryArea Summary

• Total: 4,802,800 SF.• Office: 1,368,000 SF.• Hotel: 530,000 SF.• Apartments: 2,170,400 SF.• Retail: 696,200SF.• Cineplex: 38,200 SF.• Car Parking: 2,800 Cars

Harbour Station, Woodbridge, VAHigh-rise Service Apartment Complex

Company: HOK Group, DC OfficeRole: DesignerSupervisor: Duncan Lyons, Design Principal

Harbour Station, Woodbridge, VArise Service Apartment Complex

Company: HOK Group, DC OfficeRole: DesignerSupervisor: Duncan Lyons, Design Principal

Shanghai Jin Hongqiao CenterHigh-rise Office + Low

Company: John Portman & AssociatesRole: Design ArchitectSupervisor: Kinka Wong, Project Director

Shanghai Jin Hongqiao Centerrise Office + Low-rise Retail

Company: John Portman & AssociatesRole: Design ArchitectSupervisor: Kinka Wong, Project Director

Bird’s Eye View RenderingBird’s Eye View Rendering

Design Concept – City GateBird’s Eye View Rendering

City Gate, ShanghaiBird’s Eye View Rendering

Ground Floor Plan & North ElevationGround Floor Plan & North Elevation

Typical Low-RiseTower Plan & South ElevationRiseTower Plan & South Elevation

Hilton Bayfront Hotel & Convention CenterSan Diego, CA

High-rise Hotel + Convention Center

Company: John Portman & AssociatesRole: Design ArchitectSupervisor: Kinka Wong, Project Director

Hilton Bayfront Hotel & Convention CenterSan Diego, CA

rise Hotel + Convention Center

Company: John Portman & AssociatesRole: Design ArchitectSupervisor: Kinka Wong, Project Director

Bird’s Eye View RenderingBird’s Eye View Rendering

Project DataProject Data

l Hilton Bayfront Hotel

l 1190 room convention center hotel

l 92,900 sq. meters

l Two Large ballrooms (3160 sq. meters and 2230 sq. meters)

l 15,330 sq. meters total meeting space

l Three restaurants

Design Experience•The site was prone to eartquakes, requiring special structure throughout the building

•Our assignment during this project was to work with the developer to design and address voluminous project conditions.

•The site location adjacent to the bay had salt-laden air, complicating details which had metal exposed to the air

Design Experience•The site had been a ship building yard previously, so there was a necessity to remediate the soil

Ground Floor Plan, Views of Spa & BarGround Floor Plan, Views of Spa & Bar

Vertical Transportation

• From early design development to substantial completion took 3.5 years.

• Vertical transportation including elevator core/lobby and escalator lobby were part of my responsibility from design concept through construction document phase.

Vertical Transportation

Guestrooms

• From early design development to substantial completion took 3.5 years.

• Trying to get more guestrooms to enjoy the bay view.

Guestrooms