Public Private Partnerships (PPP’s)…… Why BIM should be ...€¦ · PFI Private Finance...

Post on 09-Apr-2020

5 views 0 download

Transcript of Public Private Partnerships (PPP’s)…… Why BIM should be ...€¦ · PFI Private Finance...

Andy Bradley

Qld & NT - Building Services LeaderAustralasia - Healthcare Leader

Public Private Partnerships (PPP’s)……

Why BIM should be mandatory!!!

Andy Bradley

• Not just Scottish…. Glaswegian!

• 1 wife, 3 kids, no dog, no hair, no boat (yet)

• Still plays “real” football….

• First true love Celtic

• Australasia Health Leader

• Qld & NT Building Services & ESD Leader

• 20 years experience in delivery of major projects around the globe – over 50 procured via PPP

• Likes dressing up as a cowboy….

Arup | Who We Are

We are truly global. From 90 offices in 35 countries, our 10,000 planners, designers, engineers and consultants deliver projects with creativity and passion.

Beijing National Swimming Centre

AIA & Be Awards 2005

Marina Bay Sands

BIM Process Innovation Award 2010

AAMI Stadium Melbourne

BIM Process Innovation Award 2008

Marina Bay Bridge Singapore

Analysis & Design Award 2007

Sydney Opera House

BIM Process Innovation Award 2008

Botanical Gardens Stone Sculpture

Consult Australia

So, what is PPP……?

Public Private PartnershipPFI

Private

Finance

Initiative

P3s

PFI

Public Sector

+

Private Sector=

PFI

Fund

+

Design

+

Construct

+

Operate (25-60 years)

=

Current Market

2020 Market

$7.5 trillion

$71 trillion…

How big is this PPP thingy????

Who pays what……?

YOU!!!!!(Monthly rent)

What do you pay?

Operational

costs per month

Construction

costs per month

Traditional Govt

Procured Asset

PPP Procured

Asset

What’s the outcome?

• High Quality Facilities

• Well Maintained

Facilities

• Monthly Payments

• Slightly higher bills…

Why does it cost more?

• PPP Co has to price risk

• PPP Co has to make profit

• PPP Co has to deliver

benchmarked quality service

• Govt. probably didn’t spend

enough in first place….

All very interesting….

What has this to do

with BIM????

Is it just like love….????

Can BIM conquer all????

Erm, no….

But it can help deliver….

Cost Effective

Design,

Construction &

Operation

BIM can help…. • Improve design process

• Facilitate smart construction

• Reduce construction waste

• Reduce construction capital cost

• Provide a true asset register

• Facilitate real Planned

Preventative Maintenance

(PPM)

• Reduce operational costs

REDUCE OUR MONTHLY BILLS!!!!

• Site coordination time reduced

• Design changes reduced

• Site installation time reduced

• Energy efficiency guaranteed

Traditional Design Process Design for Prefabrication - BIM

• Installation risk reduced

• Designer time increased

• Site Waste reduced

• Construction emissions

reduced

Concept Design10%

Scheme Design15%

Design Development25%

Contract Documentation

15%

Construction35%

Column1

Concept Design15%

Scheme Design20%

Design Development

35%

Contract Documentation

20%

Construction10%

Column1Design

Design

BIM functions

• Costing - BoQs

• Programming

• Equipment to have technical

information embedded

• Name and reference/asset

number

• Design info i.e. design flow

rates, heat outputs

• Full technical specification

Environmental

conditions for

monitoring

against

benchmarks

Design

Hong Kong International Airport

Design: Example

Mark Hawley | Project Director | Airport Authority Hong Kong

‘…. we see the midfield concourse as

the start of our, Airport Authority Hong Kong, BIM journey

into achieving FM & asset interaction ….’

Midfield Development Integrated Systems

Existing Infrastructure Modifications

Design Realised

Design Realised

Design Realised

Case Study – Queen Elizabeth, UK

• 1,300 beds

• PFI (PPP UK-Stylie)

• Very fast programme

• Very low Energy Target

• Very high Penalties….

Queen Elizabeth Hospital, Birmingham UK, 1300 Beds

Case Study – Queen Elizabeth, UK

Case Study – Queen Elizabeth, UK

• Steel Frame

• Unitised, High Performance Cladding System

• Riser Modules

• GRP Modules (Pods)

• Modular Plantrooms

• Integrated Modular Wall

• Flat Packed Theatres

• Modular Wiring

• Multi-Service Corridor Modules

Case Study – Queen Elizabeth, UK

Case Study – Queen Elizabeth, UK

Case Study – Queen Elizabeth, UK

Case Study – Queen Elizabeth, UK

Case Study – Queen Elizabeth, UK

Case Study – Queen Elizabeth, UK

Case Study – Queen Elizabeth, UK

Case Study – Queen Elizabeth, UK

Case Study – Queen Elizabeth, UK

Case Study – Queen Elizabeth, UK

Case Study – Queen Elizabeth, UK

Case Study – Queen Elizabeth, UK

Case Study – Queen Elizabeth, UK

The Result????

• More cost efficient building

• Plant area only 11% of gross building area

• Project handed over 6 months early

• Quality very high standard

• Early unitary payment…. Good profit

• Lower monthly costs!!!

• PPP – A Big Success Story!!!!!

Case Study – Queen Elizabeth, UK

Andy.Bradley@arup.com

Mob: 044 992 6144

Thank You