Project Value: $14,250,000

Project Overview:

The overall project consisted of the following five subprojects:

• Complete demolition and renovation of an existing 40,000 GSF office area

including a complete external building skin replacement.

• Construction of a new 5,000 GSF data center within an existing warehouse,

complete with mission critical mechanical and electrical systems.

• Construction of a new 12,000 GSF office area within an existing warehouse.

• Construction of a new 6,000 GSF two story central reception building and

walkways to connect MAHLE’s existing Technology Center to their newly

renovated office facility.

• Extensive site work and landscaping to complete a new site entry and parking for

MAHLE’s overall North American Headquarter’s site.

ACS Commissioned the following services:

• Chilled Water System including (2) chillers, (1) dry cooler, (3) primary and (3)

secondary pumps.

• Humidification system for the data center.

• Fan coil units for mechanical cooling for the data center, electrical, and mechanical

rooms.

• Emergency generator system including testing all shutdown modes of the overall

data center.

• Hot water system including (2) boilers, (2) primary, and (2) secondary pumps that

serve the approximately 100 VAV’s in the building.

• Air-Handing Unit (AHU-1 & 2) with chilled and hot water coils serving the FHA

offices.

P R O J E C T C A M E O

N O R T H A M E R I C A N H E A D Q U A R T E R S / M A H L E / F A R M I N G T O N H I L L S , M I

• Air-Handing Unit (AHU-3) with chilled and hot

water coils serving the Aftermarket.

• Air-Handling Unit (AHU-4) serving the CRB.

• Exhaust Fans serving the mechanical room and

bathrooms.

• Unit Heaters serving the stairwells.

ACS Services: Turnkey Design Management,

Construction Management, Commissioning Services,

and Site Supervision

Project Duration: 15 months

Completion Date: June, 2013

Headquar ters - Madison, WI - USA / Greenvi l le, SC - USA / Troy, MI - USA / TEDA Tianj in , China / Leicester, UK / w w w.acscm.com / acs-us@acscm.com