Project Value: $14,250,000 Project Overview: The overall project consisted of the following five subprojects: Complete demolition and renovation of an existing 40,000 GSF office area including a complete external building skin replacement. Construction of a new 5,000 GSF data center within an existing warehouse, complete with mission critical mechanical and electrical systems. Construction of a new 12,000 GSF office area within an existing warehouse. Construction of a new 6,000 GSF two story central reception building and walkways to connect MAHLE’s existing Technology Center to their newly renovated office facility. Extensive site work and landscaping to complete a new site entry and parking for MAHLE’s overall North American Headquarter’s site. ACS Commissioned the following services: Chilled Water System including (2) chillers, (1) dry cooler, (3) primary and (3) secondary pumps. Humidification system for the data center. Fan coil units for mechanical cooling for the data center, electrical, and mechanical rooms. Emergency generator system including testing all shutdown modes of the overall data center. Hot water system including (2) boilers, (2) primary, and (2) secondary pumps that serve the approximately 100 VAV’s in the building. Air-Handing Unit (AHU-1 & 2) with chilled and hot water coils serving the FHA offices. PROJECT CAMEO NORTH AMERICAN HEADQUARTERS / MAHLE / FARMINGTON HILLS, MI Air-Handing Unit (AHU-3) with chilled and hot water coils serving the Aftermarket. Air-Handling Unit (AHU-4) serving the CRB. Exhaust Fans serving the mechanical room and bathrooms. Unit Heaters serving the stairwells. ACS Services: Turnkey Design Management, Construction Management, Commissioning Services, and Site Supervision Project Duration: 15 months Completion Date: June, 2013 Headquarters - Madison, WI - USA / Greenville, SC - USA / Troy, MI - USA / TEDA Tianjin, China / Leicester, UK / www.acscm.com / [email protected]

Transcript of project cameo north american headquarters / mahle / farmington ...

Page 1: project cameo north american headquarters / mahle / farmington ...

Project Value: $14,250,000

Project Overview:

The overall project consisted of the following five subprojects:

• Complete demolition and renovation of an existing 40,000 GSF office area

including a complete external building skin replacement.

• Construction of a new 5,000 GSF data center within an existing warehouse,

complete with mission critical mechanical and electrical systems.

• Construction of a new 12,000 GSF office area within an existing warehouse.

• Construction of a new 6,000 GSF two story central reception building and

walkways to connect MAHLE’s existing Technology Center to their newly

renovated office facility.

• Extensive site work and landscaping to complete a new site entry and parking for

MAHLE’s overall North American Headquarter’s site.

ACS Commissioned the following services:

• Chilled Water System including (2) chillers, (1) dry cooler, (3) primary and (3)

secondary pumps.

• Humidification system for the data center.

• Fan coil units for mechanical cooling for the data center, electrical, and mechanical

rooms.

• Emergency generator system including testing all shutdown modes of the overall

data center.

• Hot water system including (2) boilers, (2) primary, and (2) secondary pumps that

serve the approximately 100 VAV’s in the building.

• Air-Handing Unit (AHU-1 & 2) with chilled and hot water coils serving the FHA

offices.

P R O J E C T C A M E O

N O R T H A M E R I C A N H E A D Q U A R T E R S / M A H L E / F A R M I N G T O N H I L L S , M I

• Air-Handing Unit (AHU-3) with chilled and hot

water coils serving the Aftermarket.

• Air-Handling Unit (AHU-4) serving the CRB.

• Exhaust Fans serving the mechanical room and

bathrooms.

• Unit Heaters serving the stairwells.

ACS Services: Turnkey Design Management,

Construction Management, Commissioning Services,

and Site Supervision

Project Duration: 15 months

Completion Date: June, 2013