Production schedule

Post on 09-Aug-2015

269 views 0 download

Transcript of Production schedule

Filming schedule This is the production schedule for my film opening.

Week 1 Research and planning – location ideas, costume ideas, risk assessments and daily filming sheets.

Week 2 Begin filming in shots needed for prologue.

Finish all filming for prologue.Week 3 Begin filming at opening credit shots of London and iconic places.

Finish all filming for the opening credits.Week 4 -5

Finish ALL filming (any other shots needed for film opening).

Week 6 Start editing process (upload footage). Arrange clips into bins.Add clips needed to timeline and arrange them.

Week 7 Should be half way through editing process, near finishing. Adding music and sound effects.

Week 8 Change visual styles.Add fades and other effects (adapt the video to the visual style planned)

Week 9 Finish ALL editing – Sequence should be finished