Filming schedule This is the production schedule for my film opening.
Week 1 Research and planning – location ideas, costume ideas, risk assessments and daily filming sheets.
Week 2 Begin filming in shots needed for prologue.
Finish all filming for prologue.Week 3 Begin filming at opening credit shots of London and iconic places.
Finish all filming for the opening credits.Week 4 -5
Finish ALL filming (any other shots needed for film opening).
Week 6 Start editing process (upload footage). Arrange clips into bins.Add clips needed to timeline and arrange them.
Week 7 Should be half way through editing process, near finishing. Adding music and sound effects.
Week 8 Change visual styles.Add fades and other effects (adapt the video to the visual style planned)
Week 9 Finish ALL editing – Sequence should be finished