Ukraine, Kramatorsk, 2012.

World Wind Energy, GW

Fuhrlander AG and Fuhrlander windtechnolodgyin world

Wind potential map of Ukraine

Average wind speed :

V < 4,5 m/s

V = 4,5 m/s

V < 5,0 m/s

V = 5,0 m/s

Production workshop

Production of the nacelle :

• length - 114 m

• width - 24 m

• area - 2736 sq.m.

Production of rotor hub :

• length - 30 m

• width - 24 m

• area - 720 sq.m.

Main warehouse :

• length - 18 m

• width - 48 m

• area - 864 sq.m.

Additional warehouse :

• length – 24,5 m

• width - 18 m

• area - 441 sq.m.

Wind turbine capacity 2,5 MW FL2500

Technical characteristics :

1. Rated power - 2500 kW.

2. Height to the rotor axis - 98,2 m.

3. Rotor diameter, – 100 m.

4. Starting wind speed - 3,5 m/s.

5. Rated wind speed - 11,5 m/s.

6. Shutdown at speed of a wind– 25 m/s.

7. Operation at t from -20°С to +40°С.

8. Sound power - 104,5±2 dBA.

9. Range of number of turns - 9,4 - 16,5 rpm.

10. Rated number of turns of a rotor - 14,4 rpm.

11. The angle of the nacelle - 5°.

12. Transfer number of a gear box - 79,2.

Ø 100 m

98,2 m

Production of wind turbine

FoundationTower94,2 m

Hub34 000 kg

Nacelle95 000 kg

Blades

Wind turbine capacity 2,5 MW

Logistics, freight scheme

Kramatorsk

Parts of wind turbines

ServiceTransportation

to the wind park

Suppliers

Logistics

Logistics

Erection

Erection

Centers of service support

Service staff

Composition of service staff

South region:• 15 peoples (in 2012);• 33 peoples (in 2013).Eastern region:• 15 peoples (in 2012);• 35 peoples (in 2013).

Warehouse of spare parts andconsumables

The high-tech warehouse:• more then 300 titles of part;• consumables;• fuels and lubricants ;• crane and loading equipment.

Dispatching office

Workplace

Workplace

WorkplaceReporting

Dispatcher on duty

Server SQL/VPN

Wind park 1 Dispatcher on duty

Wind park 2

Wind park n+1