Brgy. Julio OuanoProject Cost: 1,700,000.00

Source of Fund: 20% Development Fund

Brgy. JULIO OUANO

Project Cost: 411,000.00

Source of Fund:20% Development Fund

CONCRETE LINE CANAL

PUBLIC COMFORT ROOMS

OUTSIDE OF CR

Project Cost: 180,000.00

Source of Fund: 20% Development Fund

INSIDE OF CR

Street lights Installation at the NationalHighway from Brgy. Gamuton to Brgy.

San Pedro

Source Of fund: 20% Development Fund

Project Cost: 350,000.00

Birthing Clinic

Project Cost: 80,000.00Source of Fund: 20% Development Fund

TB RoomProject Cost: 35,000.00Source of Fund 20% Development Fund

ALEGRIA COMMERCIAL CENTER

CRISIS INTERVENTION AND

LIVELIHOOD TRAINING CENTER

Rev. Fr. Nick officiates the blessing

of 4 units sewing machine for

Alegria Livelihood Center

Source of Funds: SNPIDA World

Vision Australia

Project Cost: 500,000.00

CONSTRUCTION OF THE MUNICIPAL

DEVELOPMENT TRAINING CENTER

ALEGRIA COMMUNITY STAGE

AND BASKETBALL COURT

BLEACHERS

CONSTRUCTION OF BRGY. POBLACION GYMNASIUM/BASKETBALL COVERED COURT

Project Cost: 100,000.00

Source of Fund: DA/LGU Alegria Equity

Tennis Court (Solar Dryer)

Bgry. Poblacion Fish Port

Poblacion to Danao Road

Project Cost: 5,100,000.00

Source of Funds: DA / LGU-Alegria

Pongtud Potable Water System Level II

Project Cost: 3,883,310.80Source of Fund: IFAD-NMCIREMP/ LGU Alegria

Alipao Potable Water System Level II

Project Cost: 1,500,000.00Source of Fund: IFAD-NMCIREMP/ LGU Alegria

Newly completed Classroom Bldng. w/ Built in Comfort Room in Brgy. Budlingin

Project Cost: 1,800,000.00Source of Fund: Kalahi- Kalayaanthrough the Engineering Batallion of the Phil. Army

Concreting of 0.8 km of FMR at Brgy. Budlingin

Project Cost: 2,800,000.00

Source of Fund: DAR-IFAD NMCIREMP / LGU-Alegria

COMPLETED ALIPAO GYMNASIUM /

BASKETBALL COVERED COURT

Project Cost: 1,850,000.00

Source of funds: Congressional Funds of Former Congressman Ace

Barbers and Incumbent Cong. Guillermo Romarate, Jr.

COMPLETED PONGTUD GYMNASIUM /

BASKETBALL COVERED COURT

Project Cost: 1,850,000.00

Source of funds: Congressional Funds of Former Congressman Ace

Barbers and Incumbent Cong. Guillermo Romarate, Jr.

ONE UNIT CLASSROOM BUILDING

Located at ANHS

Project Cost:

Php 570,000.00

Source of Fund:

SNPIDA-World

Vision Australia

ON-GOING CONSTRUCTION OF BUS

TERMINAL

Project Cost: 9,870,000.00 Source of fund: DOF-MDFO /LGU

Alegria

ONGOING CONSTRUCTION OF OUR NEW

MUNICIPAL BUILDING

Project Cost: 15,000,000.00 Source of fund: Congressional/Senatorial

CDF Funds

COMPLETED SAN PEDRO BRGY. HALL

POCTOY BOAT LANDING

Source of Funds:

USAID GEM &

PDAF Equity of Cong. Romarate

Project Cost: 3,251,575.00

CAMP EDWARD FMR

ONGOING CONSTRUCTION OF JULIO OUANO

WATER RESERVOIR

CAMP EDWARD TRADING

CENTER