Overview of Preventive Maintenance (PPP01)

PMs Procedures and Projects Track

1 Open Internet Explorer 2 Type into the address bar wwwmaintenanceconnectioncom 3 Click Log In button 4 Enter the following

Member ID PPP_CHECKPOINT Password Checkpoint2014

Note During the seminar please do not ldquoSaverdquo while following along with a specific example unless directed to do so by your course instructor

Wireless SSID CHECKPOINT Wireless Password CHECKPOINT

Logon Instructions

Presenter Name Dave Putnam

Background information

bull Role and expertise at Maintenance Connection

bull Fun Fact

Presenter Bio

Preventive Maintenance Defined

PM Details

PM Tabs

PM Preferences

Agenda

What is a Preventive Maintenance (PM) Schedule

What is a Procedure

PM Configuration

PM Generation Process

Preventive Maintenance Defined

Scheduled or planned work based on a passage of time or usage

Individual PM record will generate Work Orders for Assets added based on schedule defined

What is a Preventive Maintenance (PM) Schedule

Also used for

bull Inspections

bull Rounds

bull Compliance

bull hellip Any scheduled activity requiring a Work Order

What is a Preventive Maintenance (PM) Schedule (contrsquod)

Set of tasks for work to be completed

Pre-defined template for specific fields to be populated on Work Orders

bull Details

bull Estimated costs

bull Indicators

bull Photo

bull Authorization

What is a Procedure

Flexible configuration options

bull Run a procedure after a specified time or usage

bull Combined schedule (meter and time based ndash whichever occurs first)

bull Multiple procedures can be scheduled for different intervals

PM Configuration

Two general types of schedules

bull Fixed Schedule

bull Floating Schedule

PM Configuration (contrsquod)

Basic Configuration Process

bull PM record is created

bull Schedule is defined

bull Procedure is defined

bull Assets are added

bull Automation is set

PM Configuration (contrsquod)

Based on automation settings

bull Work Orders auto-generated

bull Home Page notification to manually generate

PM Info section on Home Page provides summary information and link to generate

PM Generation Process

PM Details Overview

PM Details Fields

PM Details

Stores key information for the PM

Fields carry over to generated Work Orders

PM Details Overview

ID and Name

bull Important to remain consistent in naming structure

bull ID is the unique identifier

bull Name is the descriptive indicator

Category is used strictly for locating in PM Lookup

Details Fields

Type and Priority transfer over to Work Orders (overridden by Procedure)

Shift transferred unless specified at PM Asset level

Details Fields (contrsquod)

Shop and Supervisor fields used for filtering and locating schedules only

Details Fields (contrsquod)

Library

bull Repair Center selection to auto-filter in the PM Explorer

bull If left blank will appear in Explorer for all Repair Centers

Details Fields (contrsquod)

Status and Work Order Status

bull Status determines whether PM is active or inactive

bull Work Order Status sets default status for generated Work Orders

Details Fields (contrsquod)

Schedule

Procedures

Assets

Automation

Attach

Reports

PM Tabs

Schedule Tab displays type and definition of schedule

bull Details for schedule are also defined (weekly monthly etc)

Two sub-tabs

bull Schedule

bull Start End

Schedule

Schedule Sub-Tab

bull Displayed by default

bull Defines base schedule

Schedule (contrsquod)

Start End Sub-Tab

bull Specify begin and end parameters

bull Disable PM

Schedule (contrsquod)

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

1 Open Internet Explorer 2 Type into the address bar wwwmaintenanceconnectioncom 3 Click Log In button 4 Enter the following

Member ID PPP_CHECKPOINT Password Checkpoint2014

Note During the seminar please do not ldquoSaverdquo while following along with a specific example unless directed to do so by your course instructor

Wireless SSID CHECKPOINT Wireless Password CHECKPOINT

Logon Instructions

Presenter Name Dave Putnam

Background information

bull Role and expertise at Maintenance Connection

bull Fun Fact

Presenter Bio

Preventive Maintenance Defined

PM Details

PM Tabs

PM Preferences

Agenda

What is a Preventive Maintenance (PM) Schedule

What is a Procedure

PM Configuration

PM Generation Process

Preventive Maintenance Defined

Scheduled or planned work based on a passage of time or usage

Individual PM record will generate Work Orders for Assets added based on schedule defined

What is a Preventive Maintenance (PM) Schedule

Also used for

bull Inspections

bull Rounds

bull Compliance

bull hellip Any scheduled activity requiring a Work Order

What is a Preventive Maintenance (PM) Schedule (contrsquod)

Set of tasks for work to be completed

Pre-defined template for specific fields to be populated on Work Orders

bull Details

bull Estimated costs

bull Indicators

bull Photo

bull Authorization

What is a Procedure

Flexible configuration options

bull Run a procedure after a specified time or usage

bull Combined schedule (meter and time based ndash whichever occurs first)

bull Multiple procedures can be scheduled for different intervals

PM Configuration

Two general types of schedules

bull Fixed Schedule

bull Floating Schedule

PM Configuration (contrsquod)

Basic Configuration Process

bull PM record is created

bull Schedule is defined

bull Procedure is defined

bull Assets are added

bull Automation is set

PM Configuration (contrsquod)

Based on automation settings

bull Work Orders auto-generated

bull Home Page notification to manually generate

PM Info section on Home Page provides summary information and link to generate

PM Generation Process

PM Details Overview

PM Details Fields

PM Details

Stores key information for the PM

Fields carry over to generated Work Orders

PM Details Overview

ID and Name

bull Important to remain consistent in naming structure

bull ID is the unique identifier

bull Name is the descriptive indicator

Category is used strictly for locating in PM Lookup

Details Fields

Type and Priority transfer over to Work Orders (overridden by Procedure)

Shift transferred unless specified at PM Asset level

Details Fields (contrsquod)

Shop and Supervisor fields used for filtering and locating schedules only

Details Fields (contrsquod)

Library

bull Repair Center selection to auto-filter in the PM Explorer

bull If left blank will appear in Explorer for all Repair Centers

Details Fields (contrsquod)

Status and Work Order Status

bull Status determines whether PM is active or inactive

bull Work Order Status sets default status for generated Work Orders

Details Fields (contrsquod)

Schedule

Procedures

Assets

Automation

Attach

Reports

PM Tabs

Schedule Tab displays type and definition of schedule

bull Details for schedule are also defined (weekly monthly etc)

Two sub-tabs

bull Schedule

bull Start End

Schedule

Schedule Sub-Tab

bull Displayed by default

bull Defines base schedule

Schedule (contrsquod)

Start End Sub-Tab

bull Specify begin and end parameters

bull Disable PM

Schedule (contrsquod)

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Presenter Name Dave Putnam

Background information

bull Role and expertise at Maintenance Connection

bull Fun Fact

Presenter Bio

Preventive Maintenance Defined

PM Details

PM Tabs

PM Preferences

Agenda

What is a Preventive Maintenance (PM) Schedule

What is a Procedure

PM Configuration

PM Generation Process

Preventive Maintenance Defined

Scheduled or planned work based on a passage of time or usage

Individual PM record will generate Work Orders for Assets added based on schedule defined

What is a Preventive Maintenance (PM) Schedule

Also used for

bull Inspections

bull Rounds

bull Compliance

bull hellip Any scheduled activity requiring a Work Order

What is a Preventive Maintenance (PM) Schedule (contrsquod)

Set of tasks for work to be completed

Pre-defined template for specific fields to be populated on Work Orders

bull Details

bull Estimated costs

bull Indicators

bull Photo

bull Authorization

What is a Procedure

Flexible configuration options

bull Run a procedure after a specified time or usage

bull Combined schedule (meter and time based ndash whichever occurs first)

bull Multiple procedures can be scheduled for different intervals

PM Configuration

Two general types of schedules

bull Fixed Schedule

bull Floating Schedule

PM Configuration (contrsquod)

Basic Configuration Process

bull PM record is created

bull Schedule is defined

bull Procedure is defined

bull Assets are added

bull Automation is set

PM Configuration (contrsquod)

Based on automation settings

bull Work Orders auto-generated

bull Home Page notification to manually generate

PM Info section on Home Page provides summary information and link to generate

PM Generation Process

PM Details Overview

PM Details Fields

PM Details

Stores key information for the PM

Fields carry over to generated Work Orders

PM Details Overview

ID and Name

bull Important to remain consistent in naming structure

bull ID is the unique identifier

bull Name is the descriptive indicator

Category is used strictly for locating in PM Lookup

Details Fields

Type and Priority transfer over to Work Orders (overridden by Procedure)

Shift transferred unless specified at PM Asset level

Details Fields (contrsquod)

Shop and Supervisor fields used for filtering and locating schedules only

Details Fields (contrsquod)

Library

bull Repair Center selection to auto-filter in the PM Explorer

bull If left blank will appear in Explorer for all Repair Centers

Details Fields (contrsquod)

Status and Work Order Status

bull Status determines whether PM is active or inactive

bull Work Order Status sets default status for generated Work Orders

Details Fields (contrsquod)

Schedule

Procedures

Assets

Automation

Attach

Reports

PM Tabs

Schedule Tab displays type and definition of schedule

bull Details for schedule are also defined (weekly monthly etc)

Two sub-tabs

bull Schedule

bull Start End

Schedule

Schedule Sub-Tab

bull Displayed by default

bull Defines base schedule

Schedule (contrsquod)

Start End Sub-Tab

bull Specify begin and end parameters

bull Disable PM

Schedule (contrsquod)

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Preventive Maintenance Defined

PM Details

PM Tabs

PM Preferences

Agenda

What is a Preventive Maintenance (PM) Schedule

What is a Procedure

PM Configuration

PM Generation Process

Preventive Maintenance Defined

Scheduled or planned work based on a passage of time or usage

Individual PM record will generate Work Orders for Assets added based on schedule defined

What is a Preventive Maintenance (PM) Schedule

Also used for

bull Inspections

bull Rounds

bull Compliance

bull hellip Any scheduled activity requiring a Work Order

What is a Preventive Maintenance (PM) Schedule (contrsquod)

Set of tasks for work to be completed

Pre-defined template for specific fields to be populated on Work Orders

bull Details

bull Estimated costs

bull Indicators

bull Photo

bull Authorization

What is a Procedure

Flexible configuration options

bull Run a procedure after a specified time or usage

bull Combined schedule (meter and time based ndash whichever occurs first)

bull Multiple procedures can be scheduled for different intervals

PM Configuration

Two general types of schedules

bull Fixed Schedule

bull Floating Schedule

PM Configuration (contrsquod)

Basic Configuration Process

bull PM record is created

bull Schedule is defined

bull Procedure is defined

bull Assets are added

bull Automation is set

PM Configuration (contrsquod)

Based on automation settings

bull Work Orders auto-generated

bull Home Page notification to manually generate

PM Info section on Home Page provides summary information and link to generate

PM Generation Process

PM Details Overview

PM Details Fields

PM Details

Stores key information for the PM

Fields carry over to generated Work Orders

PM Details Overview

ID and Name

bull Important to remain consistent in naming structure

bull ID is the unique identifier

bull Name is the descriptive indicator

Category is used strictly for locating in PM Lookup

Details Fields

Type and Priority transfer over to Work Orders (overridden by Procedure)

Shift transferred unless specified at PM Asset level

Details Fields (contrsquod)

Shop and Supervisor fields used for filtering and locating schedules only

Details Fields (contrsquod)

Library

bull Repair Center selection to auto-filter in the PM Explorer

bull If left blank will appear in Explorer for all Repair Centers

Details Fields (contrsquod)

Status and Work Order Status

bull Status determines whether PM is active or inactive

bull Work Order Status sets default status for generated Work Orders

Details Fields (contrsquod)

Schedule

Procedures

Assets

Automation

Attach

Reports

PM Tabs

Schedule Tab displays type and definition of schedule

bull Details for schedule are also defined (weekly monthly etc)

Two sub-tabs

bull Schedule

bull Start End

Schedule

Schedule Sub-Tab

bull Displayed by default

bull Defines base schedule

Schedule (contrsquod)

Start End Sub-Tab

bull Specify begin and end parameters

bull Disable PM

Schedule (contrsquod)

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

What is a Preventive Maintenance (PM) Schedule

What is a Procedure

PM Configuration

PM Generation Process

Preventive Maintenance Defined

Scheduled or planned work based on a passage of time or usage

Individual PM record will generate Work Orders for Assets added based on schedule defined

What is a Preventive Maintenance (PM) Schedule

Also used for

bull Inspections

bull Rounds

bull Compliance

bull hellip Any scheduled activity requiring a Work Order

What is a Preventive Maintenance (PM) Schedule (contrsquod)

Set of tasks for work to be completed

Pre-defined template for specific fields to be populated on Work Orders

bull Details

bull Estimated costs

bull Indicators

bull Photo

bull Authorization

What is a Procedure

Flexible configuration options

bull Run a procedure after a specified time or usage

bull Combined schedule (meter and time based ndash whichever occurs first)

bull Multiple procedures can be scheduled for different intervals

PM Configuration

Two general types of schedules

bull Fixed Schedule

bull Floating Schedule

PM Configuration (contrsquod)

Basic Configuration Process

bull PM record is created

bull Schedule is defined

bull Procedure is defined

bull Assets are added

bull Automation is set

PM Configuration (contrsquod)

Based on automation settings

bull Work Orders auto-generated

bull Home Page notification to manually generate

PM Info section on Home Page provides summary information and link to generate

PM Generation Process

PM Details Overview

PM Details Fields

PM Details

Stores key information for the PM

Fields carry over to generated Work Orders

PM Details Overview

ID and Name

bull Important to remain consistent in naming structure

bull ID is the unique identifier

bull Name is the descriptive indicator

Category is used strictly for locating in PM Lookup

Details Fields

Type and Priority transfer over to Work Orders (overridden by Procedure)

Shift transferred unless specified at PM Asset level

Details Fields (contrsquod)

Shop and Supervisor fields used for filtering and locating schedules only

Details Fields (contrsquod)

Library

bull Repair Center selection to auto-filter in the PM Explorer

bull If left blank will appear in Explorer for all Repair Centers

Details Fields (contrsquod)

Status and Work Order Status

bull Status determines whether PM is active or inactive

bull Work Order Status sets default status for generated Work Orders

Details Fields (contrsquod)

Schedule

Procedures

Assets

Automation

Attach

Reports

PM Tabs

Schedule Tab displays type and definition of schedule

bull Details for schedule are also defined (weekly monthly etc)

Two sub-tabs

bull Schedule

bull Start End

Schedule

Schedule Sub-Tab

bull Displayed by default

bull Defines base schedule

Schedule (contrsquod)

Start End Sub-Tab

bull Specify begin and end parameters

bull Disable PM

Schedule (contrsquod)

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Scheduled or planned work based on a passage of time or usage

Individual PM record will generate Work Orders for Assets added based on schedule defined

What is a Preventive Maintenance (PM) Schedule

Also used for

bull Inspections

bull Rounds

bull Compliance

bull hellip Any scheduled activity requiring a Work Order

What is a Preventive Maintenance (PM) Schedule (contrsquod)

Set of tasks for work to be completed

Pre-defined template for specific fields to be populated on Work Orders

bull Details

bull Estimated costs

bull Indicators

bull Photo

bull Authorization

What is a Procedure

Flexible configuration options

bull Run a procedure after a specified time or usage

bull Combined schedule (meter and time based ndash whichever occurs first)

bull Multiple procedures can be scheduled for different intervals

PM Configuration

Two general types of schedules

bull Fixed Schedule

bull Floating Schedule

PM Configuration (contrsquod)

Basic Configuration Process

bull PM record is created

bull Schedule is defined

bull Procedure is defined

bull Assets are added

bull Automation is set

PM Configuration (contrsquod)

Based on automation settings

bull Work Orders auto-generated

bull Home Page notification to manually generate

PM Info section on Home Page provides summary information and link to generate

PM Generation Process

PM Details Overview

PM Details Fields

PM Details

Stores key information for the PM

Fields carry over to generated Work Orders

PM Details Overview

ID and Name

bull Important to remain consistent in naming structure

bull ID is the unique identifier

bull Name is the descriptive indicator

Category is used strictly for locating in PM Lookup

Details Fields

Type and Priority transfer over to Work Orders (overridden by Procedure)

Shift transferred unless specified at PM Asset level

Details Fields (contrsquod)

Shop and Supervisor fields used for filtering and locating schedules only

Details Fields (contrsquod)

Library

bull Repair Center selection to auto-filter in the PM Explorer

bull If left blank will appear in Explorer for all Repair Centers

Details Fields (contrsquod)

Status and Work Order Status

bull Status determines whether PM is active or inactive

bull Work Order Status sets default status for generated Work Orders

Details Fields (contrsquod)

Schedule

Procedures

Assets

Automation

Attach

Reports

PM Tabs

Schedule Tab displays type and definition of schedule

bull Details for schedule are also defined (weekly monthly etc)

Two sub-tabs

bull Schedule

bull Start End

Schedule

Schedule Sub-Tab

bull Displayed by default

bull Defines base schedule

Schedule (contrsquod)

Start End Sub-Tab

bull Specify begin and end parameters

bull Disable PM

Schedule (contrsquod)

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Also used for

bull Inspections

bull Rounds

bull Compliance

bull hellip Any scheduled activity requiring a Work Order

What is a Preventive Maintenance (PM) Schedule (contrsquod)

Set of tasks for work to be completed

Pre-defined template for specific fields to be populated on Work Orders

bull Details

bull Estimated costs

bull Indicators

bull Photo

bull Authorization

What is a Procedure

Flexible configuration options

bull Run a procedure after a specified time or usage

bull Combined schedule (meter and time based ndash whichever occurs first)

bull Multiple procedures can be scheduled for different intervals

PM Configuration

Two general types of schedules

bull Fixed Schedule

bull Floating Schedule

PM Configuration (contrsquod)

Basic Configuration Process

bull PM record is created

bull Schedule is defined

bull Procedure is defined

bull Assets are added

bull Automation is set

PM Configuration (contrsquod)

Based on automation settings

bull Work Orders auto-generated

bull Home Page notification to manually generate

PM Info section on Home Page provides summary information and link to generate

PM Generation Process

PM Details Overview

PM Details Fields

PM Details

Stores key information for the PM

Fields carry over to generated Work Orders

PM Details Overview

ID and Name

bull Important to remain consistent in naming structure

bull ID is the unique identifier

bull Name is the descriptive indicator

Category is used strictly for locating in PM Lookup

Details Fields

Type and Priority transfer over to Work Orders (overridden by Procedure)

Shift transferred unless specified at PM Asset level

Details Fields (contrsquod)

Shop and Supervisor fields used for filtering and locating schedules only

Details Fields (contrsquod)

Library

bull Repair Center selection to auto-filter in the PM Explorer

bull If left blank will appear in Explorer for all Repair Centers

Details Fields (contrsquod)

Status and Work Order Status

bull Status determines whether PM is active or inactive

bull Work Order Status sets default status for generated Work Orders

Details Fields (contrsquod)

Schedule

Procedures

Assets

Automation

Attach

Reports

PM Tabs

Schedule Tab displays type and definition of schedule

bull Details for schedule are also defined (weekly monthly etc)

Two sub-tabs

bull Schedule

bull Start End

Schedule

Schedule Sub-Tab

bull Displayed by default

bull Defines base schedule

Schedule (contrsquod)

Start End Sub-Tab

bull Specify begin and end parameters

bull Disable PM

Schedule (contrsquod)

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Set of tasks for work to be completed

Pre-defined template for specific fields to be populated on Work Orders

bull Details

bull Estimated costs

bull Indicators

bull Photo

bull Authorization

What is a Procedure

Flexible configuration options

bull Run a procedure after a specified time or usage

bull Combined schedule (meter and time based ndash whichever occurs first)

bull Multiple procedures can be scheduled for different intervals

PM Configuration

Two general types of schedules

bull Fixed Schedule

bull Floating Schedule

PM Configuration (contrsquod)

Basic Configuration Process

bull PM record is created

bull Schedule is defined

bull Procedure is defined

bull Assets are added

bull Automation is set

PM Configuration (contrsquod)

Based on automation settings

bull Work Orders auto-generated

bull Home Page notification to manually generate

PM Info section on Home Page provides summary information and link to generate

PM Generation Process

PM Details Overview

PM Details Fields

PM Details

Stores key information for the PM

Fields carry over to generated Work Orders

PM Details Overview

ID and Name

bull Important to remain consistent in naming structure

bull ID is the unique identifier

bull Name is the descriptive indicator

Category is used strictly for locating in PM Lookup

Details Fields

Type and Priority transfer over to Work Orders (overridden by Procedure)

Shift transferred unless specified at PM Asset level

Details Fields (contrsquod)

Shop and Supervisor fields used for filtering and locating schedules only

Details Fields (contrsquod)

Library

bull Repair Center selection to auto-filter in the PM Explorer

bull If left blank will appear in Explorer for all Repair Centers

Details Fields (contrsquod)

Status and Work Order Status

bull Status determines whether PM is active or inactive

bull Work Order Status sets default status for generated Work Orders

Details Fields (contrsquod)

Schedule

Procedures

Assets

Automation

Attach

Reports

PM Tabs

Schedule Tab displays type and definition of schedule

bull Details for schedule are also defined (weekly monthly etc)

Two sub-tabs

bull Schedule

bull Start End

Schedule

Schedule Sub-Tab

bull Displayed by default

bull Defines base schedule

Schedule (contrsquod)

Start End Sub-Tab

bull Specify begin and end parameters

bull Disable PM

Schedule (contrsquod)

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Flexible configuration options

bull Run a procedure after a specified time or usage

bull Combined schedule (meter and time based ndash whichever occurs first)

bull Multiple procedures can be scheduled for different intervals

PM Configuration

Two general types of schedules

bull Fixed Schedule

bull Floating Schedule

PM Configuration (contrsquod)

Basic Configuration Process

bull PM record is created

bull Schedule is defined

bull Procedure is defined

bull Assets are added

bull Automation is set

PM Configuration (contrsquod)

Based on automation settings

bull Work Orders auto-generated

bull Home Page notification to manually generate

PM Info section on Home Page provides summary information and link to generate

PM Generation Process

PM Details Overview

PM Details Fields

PM Details

Stores key information for the PM

Fields carry over to generated Work Orders

PM Details Overview

ID and Name

bull Important to remain consistent in naming structure

bull ID is the unique identifier

bull Name is the descriptive indicator

Category is used strictly for locating in PM Lookup

Details Fields

Type and Priority transfer over to Work Orders (overridden by Procedure)

Shift transferred unless specified at PM Asset level

Details Fields (contrsquod)

Shop and Supervisor fields used for filtering and locating schedules only

Details Fields (contrsquod)

Library

bull Repair Center selection to auto-filter in the PM Explorer

bull If left blank will appear in Explorer for all Repair Centers

Details Fields (contrsquod)

Status and Work Order Status

bull Status determines whether PM is active or inactive

bull Work Order Status sets default status for generated Work Orders

Details Fields (contrsquod)

Schedule

Procedures

Assets

Automation

Attach

Reports

PM Tabs

Schedule Tab displays type and definition of schedule

bull Details for schedule are also defined (weekly monthly etc)

Two sub-tabs

bull Schedule

bull Start End

Schedule

Schedule Sub-Tab

bull Displayed by default

bull Defines base schedule

Schedule (contrsquod)

Start End Sub-Tab

bull Specify begin and end parameters

bull Disable PM

Schedule (contrsquod)

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Two general types of schedules

bull Fixed Schedule

bull Floating Schedule

PM Configuration (contrsquod)

Basic Configuration Process

bull PM record is created

bull Schedule is defined

bull Procedure is defined

bull Assets are added

bull Automation is set

PM Configuration (contrsquod)

Based on automation settings

bull Work Orders auto-generated

bull Home Page notification to manually generate

PM Info section on Home Page provides summary information and link to generate

PM Generation Process

PM Details Overview

PM Details Fields

PM Details

Stores key information for the PM

Fields carry over to generated Work Orders

PM Details Overview

ID and Name

bull Important to remain consistent in naming structure

bull ID is the unique identifier

bull Name is the descriptive indicator

Category is used strictly for locating in PM Lookup

Details Fields

Type and Priority transfer over to Work Orders (overridden by Procedure)

Shift transferred unless specified at PM Asset level

Details Fields (contrsquod)

Shop and Supervisor fields used for filtering and locating schedules only

Details Fields (contrsquod)

Library

bull Repair Center selection to auto-filter in the PM Explorer

bull If left blank will appear in Explorer for all Repair Centers

Details Fields (contrsquod)

Status and Work Order Status

bull Status determines whether PM is active or inactive

bull Work Order Status sets default status for generated Work Orders

Details Fields (contrsquod)

Schedule

Procedures

Assets

Automation

Attach

Reports

PM Tabs

Schedule Tab displays type and definition of schedule

bull Details for schedule are also defined (weekly monthly etc)

Two sub-tabs

bull Schedule

bull Start End

Schedule

Schedule Sub-Tab

bull Displayed by default

bull Defines base schedule

Schedule (contrsquod)

Start End Sub-Tab

bull Specify begin and end parameters

bull Disable PM

Schedule (contrsquod)

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Basic Configuration Process

bull PM record is created

bull Schedule is defined

bull Procedure is defined

bull Assets are added

bull Automation is set

PM Configuration (contrsquod)

Based on automation settings

bull Work Orders auto-generated

bull Home Page notification to manually generate

PM Info section on Home Page provides summary information and link to generate

PM Generation Process

PM Details Overview

PM Details Fields

PM Details

Stores key information for the PM

Fields carry over to generated Work Orders

PM Details Overview

ID and Name

bull Important to remain consistent in naming structure

bull ID is the unique identifier

bull Name is the descriptive indicator

Category is used strictly for locating in PM Lookup

Details Fields

Type and Priority transfer over to Work Orders (overridden by Procedure)

Shift transferred unless specified at PM Asset level

Details Fields (contrsquod)

Shop and Supervisor fields used for filtering and locating schedules only

Details Fields (contrsquod)

Library

bull Repair Center selection to auto-filter in the PM Explorer

bull If left blank will appear in Explorer for all Repair Centers

Details Fields (contrsquod)

Status and Work Order Status

bull Status determines whether PM is active or inactive

bull Work Order Status sets default status for generated Work Orders

Details Fields (contrsquod)

Schedule

Procedures

Assets

Automation

Attach

Reports

PM Tabs

Schedule Tab displays type and definition of schedule

bull Details for schedule are also defined (weekly monthly etc)

Two sub-tabs

bull Schedule

bull Start End

Schedule

Schedule Sub-Tab

bull Displayed by default

bull Defines base schedule

Schedule (contrsquod)

Start End Sub-Tab

bull Specify begin and end parameters

bull Disable PM

Schedule (contrsquod)

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Based on automation settings

bull Work Orders auto-generated

bull Home Page notification to manually generate

PM Info section on Home Page provides summary information and link to generate

PM Generation Process

PM Details Overview

PM Details Fields

PM Details

Stores key information for the PM

Fields carry over to generated Work Orders

PM Details Overview

ID and Name

bull Important to remain consistent in naming structure

bull ID is the unique identifier

bull Name is the descriptive indicator

Category is used strictly for locating in PM Lookup

Details Fields

Type and Priority transfer over to Work Orders (overridden by Procedure)

Shift transferred unless specified at PM Asset level

Details Fields (contrsquod)

Shop and Supervisor fields used for filtering and locating schedules only

Details Fields (contrsquod)

Library

bull Repair Center selection to auto-filter in the PM Explorer

bull If left blank will appear in Explorer for all Repair Centers

Details Fields (contrsquod)

Status and Work Order Status

bull Status determines whether PM is active or inactive

bull Work Order Status sets default status for generated Work Orders

Details Fields (contrsquod)

Schedule

Procedures

Assets

Automation

Attach

Reports

PM Tabs

Schedule Tab displays type and definition of schedule

bull Details for schedule are also defined (weekly monthly etc)

Two sub-tabs

bull Schedule

bull Start End

Schedule

Schedule Sub-Tab

bull Displayed by default

bull Defines base schedule

Schedule (contrsquod)

Start End Sub-Tab

bull Specify begin and end parameters

bull Disable PM

Schedule (contrsquod)

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

PM Details Overview

PM Details Fields

PM Details

Stores key information for the PM

Fields carry over to generated Work Orders

PM Details Overview

ID and Name

bull Important to remain consistent in naming structure

bull ID is the unique identifier

bull Name is the descriptive indicator

Category is used strictly for locating in PM Lookup

Details Fields

Type and Priority transfer over to Work Orders (overridden by Procedure)

Shift transferred unless specified at PM Asset level

Details Fields (contrsquod)

Shop and Supervisor fields used for filtering and locating schedules only

Details Fields (contrsquod)

Library

bull Repair Center selection to auto-filter in the PM Explorer

bull If left blank will appear in Explorer for all Repair Centers

Details Fields (contrsquod)

Status and Work Order Status

bull Status determines whether PM is active or inactive

bull Work Order Status sets default status for generated Work Orders

Details Fields (contrsquod)

Schedule

Procedures

Assets

Automation

Attach

Reports

PM Tabs

Schedule Tab displays type and definition of schedule

bull Details for schedule are also defined (weekly monthly etc)

Two sub-tabs

bull Schedule

bull Start End

Schedule

Schedule Sub-Tab

bull Displayed by default

bull Defines base schedule

Schedule (contrsquod)

Start End Sub-Tab

bull Specify begin and end parameters

bull Disable PM

Schedule (contrsquod)

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Stores key information for the PM

Fields carry over to generated Work Orders

PM Details Overview

ID and Name

bull Important to remain consistent in naming structure

bull ID is the unique identifier

bull Name is the descriptive indicator

Category is used strictly for locating in PM Lookup

Details Fields

Type and Priority transfer over to Work Orders (overridden by Procedure)

Shift transferred unless specified at PM Asset level

Details Fields (contrsquod)

Shop and Supervisor fields used for filtering and locating schedules only

Details Fields (contrsquod)

Library

bull Repair Center selection to auto-filter in the PM Explorer

bull If left blank will appear in Explorer for all Repair Centers

Details Fields (contrsquod)

Status and Work Order Status

bull Status determines whether PM is active or inactive

bull Work Order Status sets default status for generated Work Orders

Details Fields (contrsquod)

Schedule

Procedures

Assets

Automation

Attach

Reports

PM Tabs

Schedule Tab displays type and definition of schedule

bull Details for schedule are also defined (weekly monthly etc)

Two sub-tabs

bull Schedule

bull Start End

Schedule

Schedule Sub-Tab

bull Displayed by default

bull Defines base schedule

Schedule (contrsquod)

Start End Sub-Tab

bull Specify begin and end parameters

bull Disable PM

Schedule (contrsquod)

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

ID and Name

bull Important to remain consistent in naming structure

bull ID is the unique identifier

bull Name is the descriptive indicator

Category is used strictly for locating in PM Lookup

Details Fields

Type and Priority transfer over to Work Orders (overridden by Procedure)

Shift transferred unless specified at PM Asset level

Details Fields (contrsquod)

Shop and Supervisor fields used for filtering and locating schedules only

Details Fields (contrsquod)

Library

bull Repair Center selection to auto-filter in the PM Explorer

bull If left blank will appear in Explorer for all Repair Centers

Details Fields (contrsquod)

Status and Work Order Status

bull Status determines whether PM is active or inactive

bull Work Order Status sets default status for generated Work Orders

Details Fields (contrsquod)

Schedule

Procedures

Assets

Automation

Attach

Reports

PM Tabs

Schedule Tab displays type and definition of schedule

bull Details for schedule are also defined (weekly monthly etc)

Two sub-tabs

bull Schedule

bull Start End

Schedule

Schedule Sub-Tab

bull Displayed by default

bull Defines base schedule

Schedule (contrsquod)

Start End Sub-Tab

bull Specify begin and end parameters

bull Disable PM

Schedule (contrsquod)

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Type and Priority transfer over to Work Orders (overridden by Procedure)

Shift transferred unless specified at PM Asset level

Details Fields (contrsquod)

Shop and Supervisor fields used for filtering and locating schedules only

Details Fields (contrsquod)

Library

bull Repair Center selection to auto-filter in the PM Explorer

bull If left blank will appear in Explorer for all Repair Centers

Details Fields (contrsquod)

Status and Work Order Status

bull Status determines whether PM is active or inactive

bull Work Order Status sets default status for generated Work Orders

Details Fields (contrsquod)

Schedule

Procedures

Assets

Automation

Attach

Reports

PM Tabs

Schedule Tab displays type and definition of schedule

bull Details for schedule are also defined (weekly monthly etc)

Two sub-tabs

bull Schedule

bull Start End

Schedule

Schedule Sub-Tab

bull Displayed by default

bull Defines base schedule

Schedule (contrsquod)

Start End Sub-Tab

bull Specify begin and end parameters

bull Disable PM

Schedule (contrsquod)

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Shop and Supervisor fields used for filtering and locating schedules only

Details Fields (contrsquod)

Library

bull Repair Center selection to auto-filter in the PM Explorer

bull If left blank will appear in Explorer for all Repair Centers

Details Fields (contrsquod)

Status and Work Order Status

bull Status determines whether PM is active or inactive

bull Work Order Status sets default status for generated Work Orders

Details Fields (contrsquod)

Schedule

Procedures

Assets

Automation

Attach

Reports

PM Tabs

Schedule Tab displays type and definition of schedule

bull Details for schedule are also defined (weekly monthly etc)

Two sub-tabs

bull Schedule

bull Start End

Schedule

Schedule Sub-Tab

bull Displayed by default

bull Defines base schedule

Schedule (contrsquod)

Start End Sub-Tab

bull Specify begin and end parameters

bull Disable PM

Schedule (contrsquod)

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Library

bull Repair Center selection to auto-filter in the PM Explorer

bull If left blank will appear in Explorer for all Repair Centers

Details Fields (contrsquod)

Status and Work Order Status

bull Status determines whether PM is active or inactive

bull Work Order Status sets default status for generated Work Orders

Details Fields (contrsquod)

Schedule

Procedures

Assets

Automation

Attach

Reports

PM Tabs

Schedule Tab displays type and definition of schedule

bull Details for schedule are also defined (weekly monthly etc)

Two sub-tabs

bull Schedule

bull Start End

Schedule

Schedule Sub-Tab

bull Displayed by default

bull Defines base schedule

Schedule (contrsquod)

Start End Sub-Tab

bull Specify begin and end parameters

bull Disable PM

Schedule (contrsquod)

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Status and Work Order Status

bull Status determines whether PM is active or inactive

bull Work Order Status sets default status for generated Work Orders

Details Fields (contrsquod)

Schedule

Procedures

Assets

Automation

Attach

Reports

PM Tabs

Schedule Tab displays type and definition of schedule

bull Details for schedule are also defined (weekly monthly etc)

Two sub-tabs

bull Schedule

bull Start End

Schedule

Schedule Sub-Tab

bull Displayed by default

bull Defines base schedule

Schedule (contrsquod)

Start End Sub-Tab

bull Specify begin and end parameters

bull Disable PM

Schedule (contrsquod)

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Schedule

Procedures

Assets

Automation

Attach

Reports

PM Tabs

Schedule Tab displays type and definition of schedule

bull Details for schedule are also defined (weekly monthly etc)

Two sub-tabs

bull Schedule

bull Start End

Schedule

Schedule Sub-Tab

bull Displayed by default

bull Defines base schedule

Schedule (contrsquod)

Start End Sub-Tab

bull Specify begin and end parameters

bull Disable PM

Schedule (contrsquod)

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Schedule Tab displays type and definition of schedule

bull Details for schedule are also defined (weekly monthly etc)

Two sub-tabs

bull Schedule

bull Start End

Schedule

Schedule Sub-Tab

bull Displayed by default

bull Defines base schedule

Schedule (contrsquod)

Start End Sub-Tab

bull Specify begin and end parameters

bull Disable PM

Schedule (contrsquod)

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Schedule Sub-Tab

bull Displayed by default

bull Defines base schedule

Schedule (contrsquod)

Start End Sub-Tab

bull Specify begin and end parameters

bull Disable PM

Schedule (contrsquod)

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Start End Sub-Tab

bull Specify begin and end parameters

bull Disable PM

Schedule (contrsquod)

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Add display Procedures associated with PM

bull Minimum of 1 Procedure required

bull Intervals for Procedures displayed and can be adjusted

Procedures

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Schedule automated generation of a Project Plan

bull Same process as Procedures

Procedures (contrsquod)

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Assets are displayed for generation of Work Orders for associated PM schedule

bull Can be edited and adjusted individually or through batch update

Information defined on Schedule and Procedure Tab used to calculate next scheduled date

Assets

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Repair center filter available to filter Assets displayed on list

Asset Defaults control designates which fields of the Asset record will be used when generating Work Orders

Assets (contrsquod)

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Automation determines

bull Method and timing of generation

bull Work Order grouping

bull Classifications for Assets to be auto-added to schedule

Automation

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Store documents and notes for PM

Attachments are reference only and do not populate on Work Orders

Attach

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Three report displays

bull Work Orders

bull Backlog

bull Cost Breakdown

Reports

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Work Orders and Backlog Report

Reports (contrsquod)

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Cost Breakdown Report

Reports (contrsquod)

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Now letrsquos practice navigating the different tabs of a Preventive Maintenance schedule

PM Navigation Hands-On

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Navigate to the Preventive Maint Explorer by clicking on the green Explorer bar and selecting Preventive Maintenance

PM Navigation Hands-On (contrsquod)

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Find PM ID PPP01_TEST with a PM Name of PPP01-Test in the Explorer

Select the PM record (the Details tab will display by default)

PM Navigation Hands-On (contrsquod)

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Select the Schedule tab

Select the Start End tab

Find the end after 50 occurrence(s)

PM Navigation Hands-On (contrsquod)

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Select the Assets tab

Find the Repair Center filter and select All

All Assets Locations will appear for the PM record

PM Navigation Hands-On (contrsquod)

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Select the Reports tab of the PM

Navigate to the Cost Breakdown sub-tab

Cost information for all Work Orders generated for the PM will display

PM Navigation Hands-On (contrsquod)

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

You have now successfully completed navigating the different tabs of a Preventive Maintenance record

PM Navigation Hands-On (contrsquod)

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Defaults

Explorer

Settings

Work Days

Preferences

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Set value for default Type for every PM record created

Option to stop PM generation for Assets not in-service

Defaults

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Refresh options

PM records displayed per page

Explorer

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Background generation helps to eliminate time out errors

Priority Rules will base target date on the defined priority of the Work Order (not typically used for PMs)

Settings

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Work day indicators determine generation (only will generate on days listed as work days)

Work Days

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

For access to documentation and tutorials reference wwwmcuserconnectcom

MC User Connect

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

MCUC Documentation Tutorials Article PDF Video Tutorial

User Guide

Setup Basic PM Schedule

How to Setup PM Automation

PM Tabs

PM Module Preferences

Additional Resources

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip

Did you know you can take a Quiz to test your knowledge of todayrsquos content

bull Check it out on MC User Connect (wwwmcuserconnectcom)

bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes

Test Your Knowledgehellip