PowerPoint-presentation€¦ · År 0 År 1 År 2 År 3 År 4 År 5 0 kr. 500.000 kr. 1.000.000...

Post on 03-Aug-2020

6 views 0 download

Transcript of PowerPoint-presentation€¦ · År 0 År 1 År 2 År 3 År 4 År 5 0 kr. 500.000 kr. 1.000.000...

2016

Illustration:

Illustration:

Illustration: IEA ECBCS Annex 47

10

Owner

Commissioning steering group

Ownersrepresentative

Design teamand/or contractor

CxACommissioning Authority

Operating personnel, users,suppliers of owner’s supplies

Construction managers, consultants,contractors, suppliers

Auto-mation

Venti-lation

Heating&

cooling

Data com-muni-cations

Elec-

trical

Auto-mation

Venti-lation

Heating&

Cooling

Data com-muni-cations

Elec-trical

Cx SpecialistsCx technical ressources

2009

50.000

5.000.000 kr.

10.000.000 kr.

15.000.000 kr.

År 0 År 1 År 2 År 3 År 4 År 5

20.000.000 kr.Indoor

climate

Operation

Investment

Construc-

tion

< In

vest

| S

avin

gs>

0 kr.

50.000

År 0 År 1 År 2 År 3 År 4 År 5

0 kr.

500.000 kr.

1.000.000 kr.

-500.000 kr.

1.500.000 kr.

Indoor

climate

Operation

Investment

Construc-

tion

< In

vest

| S

avin

gs>

#Commissioned

Ole.Teisen@Sweco.dk

Bygidrift.blogspot.com

Twitter: @oleteisen

Cx.dk