Port of San Francisco

Pier 23MEP Upgrades

Contract No. 2798

September 21, 2017

AGENDA1. Welcome & Introductions – Andre Antonio2. Project Overview – Raman Singh/Jose Herrera3. CMD – Finbarr Jewell4. Highest Prevailing Wage – Robin Ho/Anna Liu5. Bid Documents – Andre Antonio6. Over Water Work Key Points – Andre Antonio7. Questions

Presented By: Finbarr Jewell

Local Business Enterprise Goal = 0%

Presented By: Anna Liu

Employers need to match or exceed the City’s Ordinances for the following:

• Prevailing Wages

• Sick Leave

• Health Care

• Worker Compensation

• U.S. Longshore and Harborworkers’ Act Insurance (Section 00 73 16)• Section 01 57 20 – Construction in Water Bodies or Near San Francisco Bay

Environmental Requirements• References (Section 00 31 00)

o BCDC Permit No. M1977.017.19

o RWQCB Order R2-2016-0039

• Submittals

o Spill Prevention and Control Plan

o Environmental Health and Safety Plan

• Project Coordination (Section 01 31 13)o Pier 23 is an active construction siteo No service shutdowns allowed to Pier 23 Café between the hours of

10:00 AM to 12:00 AM daily

QBD Addendum

ENSUING SITE VISIT(PPE Required)