Port of San Francisco
Pier 23MEP Upgrades
Contract No. 2798
September 21, 2017
AGENDA1. Welcome & Introductions – Andre Antonio2. Project Overview – Raman Singh/Jose Herrera3. CMD – Finbarr Jewell4. Highest Prevailing Wage – Robin Ho/Anna Liu5. Bid Documents – Andre Antonio6. Over Water Work Key Points – Andre Antonio7. Questions
Presented By: Finbarr Jewell
Local Business Enterprise Goal = 0%
Presented By: Anna Liu
Employers need to match or exceed the City’s Ordinances for the following:
• Prevailing Wages
• Sick Leave
• Health Care
• Worker Compensation
• U.S. Longshore and Harborworkers’ Act Insurance (Section 00 73 16)• Section 01 57 20 – Construction in Water Bodies or Near San Francisco Bay
Environmental Requirements• References (Section 00 31 00)
o BCDC Permit No. M1977.017.19
o RWQCB Order R2-2016-0039
• Submittals
o Spill Prevention and Control Plan
o Environmental Health and Safety Plan
• Project Coordination (Section 01 31 13)o Pier 23 is an active construction siteo No service shutdowns allowed to Pier 23 Café between the hours of
10:00 AM to 12:00 AM daily
QBD Addendum
ENSUING SITE VISIT(PPE Required)
Questions?